SC General Contractor study materials
SC General Contractor study resources

SC General Contractor study plan

SC General Contractor · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Construction Methods, Materials, and Site Work

  • Classify soils by USCS and AASHTO group and select the compaction equipment and field density test suited to each group.

  • Sequence a clearing, grading, and storm-drainage package and name the inspection hold point that follows each step.

  • Match concrete admixtures (air-entraining, retarder, accelerator, water reducer) to the field or weather condition each one solves.

  • Compare flexible (hot-mix asphalt) and rigid (Portland cement concrete) pavement sections layer by layer and name the acceptance test used on each lift.

Your checkpoint

A 6-page sitework and materials reference sheet covering soils, concrete, asphalt, and drainage, plus a 30-question self-quiz scored at 80% or higher.

Week 2

Construction Methods, Materials, and Site Work

  • Identify structural steel bolt, weld, and connection types and state the inspection each requires before concealment.

  • Differentiate platform, balloon, and advanced wood framing and trace the lateral load path from roof diaphragm to foundation.

  • Select masonry unit type, mortar type, and grout or reinforcement for a stated exposure and structural condition.

  • Explain concrete curing and cold-weather/hot-weather protection requirements and the temperature thresholds that trigger them.

Your checkpoint

Two hand-drawn wall and floor section details (wood-frame and steel-frame) with every layer, connector, and flashing labeled and checked against a published code reference.

Week 3

Estimating and Plan Reading

  • Convert an architectural floor plan into a quantity takeoff for concrete, formwork, and reinforcing steel.

  • Read a grading and drainage plan and compute cut and fill volumes using the average-end-area method.

  • Interpret a structural plan set by reading column schedules, beam schedules, and rebar callouts correctly.

  • Build a unit-price estimate for a small commercial shell that includes labor, material, equipment, and overhead.

Your checkpoint

A complete takeoff and priced estimate for a 2,000 sq ft single-story building, accurate to within 10% of a published answer key.

Week 4

Estimating and Plan Reading & Construction Methods, Materials, and Site Work

  • Calculate crew productivity rates and apply labor burden, overtime, and shift factors to a unit price.

  • Assemble a bid summary that carries general conditions, contingency, and markup through to a sell price.

  • Re-solve every item missed on the week 1-3 quizzes and record the governing rule beside each one.

  • Sketch plan details from memory (footing, wall section, roof-to-wall connection) and self-check them against the source set.

Your checkpoint

A timed 60-question practice exam covering Domains 3 and 4, scored at 75% or higher, with a written error log sorted by root cause.

Week 5

Safety, Codes, and Regulatory Compliance

  • Map the OSHA 1926 subparts for fall protection, scaffolding, excavation, and cranes to the site condition each one controls.

  • Assemble a site-specific safety plan that names the competent persons and states the inspection intervals for each controlled hazard.

  • Trace the South Carolina contractor licensing pathway, including license classification, qualifying party, and renewal obligations.

  • Outline stormwater and erosion-control obligations under the state NPDES construction general permit, including the SWPPP contents.

  • Locate code compliance checkpoints for egress, fire separation, accessibility, and energy at both plan review and field inspection.

Your checkpoint

A one-page permit-and-inspection matrix listing every permit, inspection, and issuing agency for a sample project, plus a 40-question quiz scored at 80% or higher.

Week 6

Contract Administration and Bidding

  • Assemble a bid package containing an invitation to bid, instructions to bidders, bid form, and addenda log.

  • Compare lump-sum, unit-price, cost-plus, and guaranteed-maximum-price delivery and state which party carries which risk in each.

  • Order the contract documents by precedence and resolve a conflict between a drawing and a specification clause.

  • Process a change order, a request for information, and a pay application through the correct approval chain.

  • Distinguish performance bonds from payment bonds and identify the lien waiver types exchanged at each payment.

Your checkpoint

A mock bid submitted on a completed bid form with addenda acknowledged, paired with a written scope-gap analysis memo identifying three omissions in the provided documents.

Week 7

Business and Project Management

  • Build a 20-activity CPM schedule, identify the critical path, and calculate total and free float for each activity.

  • Prepare a cost-coded project budget and roll it into a monthly cash flow projection covering the full duration.

  • Compute break-even volume, markup versus margin, and the working-capital impact of retainage.

  • Draft subcontract terms covering scope, schedule, payment, insurance, and indemnity obligations.

  • Set up a document control and quality control log system with numbered transmittals and inspection records.

Your checkpoint

A complete project management package (CPM schedule, cost-loaded budget, and 12-month cash flow) that reconciles internally with no variances between the three documents.

Week 8

Business and Project Management & Contract Administration and Bidding & Estimating and Plan Reading & Construction Methods, Materials, and Site Work & Safety, Codes, and Regulatory Compliance

  • Complete two full-length timed practice exams of 100 questions and score 80% or higher on each.

  • Re-drill every error-log entry until the same item type is answered correctly twice in a row.

  • Condense all quantitative content into a single formula sheet covering area, volume, productivity, markup, float, and load calculations.

  • Rehearse exam-day pacing at roughly 1.5 minutes per question with one flagged-item review pass.

Your checkpoint

A final practice exam score at or above 80%, a closed error log with every entry marked resolved, and a finished one-page formula sheet.

Milestones

Week 2: Domain 4 self-quiz at 80% or higher, and the materials reference sheet covers soils, concrete, steel, wood, masonry, and asphalt with no blank families.

Week 4: 60-question timed practice on Domains 3 and 4 at 75% or higher, with a takeoff and estimate that lands within 10% of the answer key.

Week 6: Completed mock bid package and contract-administration drills, plus 80% or higher on a 40-question Domain 2 quiz.

Week 8: Two full-length mock exams at 80% or higher, every error-log item resolved, and the formula sheet finalized.