A distributor ships from one DC in Columbus, Ohio, on $180M revenue, with freight at 7.8% of sales. Sixty-eight percent of orders go East, 22% West, 10% elsewhere; the top 200 accounts are promised next-day delivery. A 3PL offers a West Coast DC for $1.4M a year in fixed and committed costs. West shipments are estimated to carry about 30% of total freight spend because of distance. Inventory is $22M at a 25% carrying cost, and roughly 60% of supply is sourced from Asia into Columbus. The COO wants a go/no-go within a month.
1. Build the cost case for and against the West Coast DC.
Read the worked answer
Against today's baseline:
- Total freight: $180M × 7.8% = $14.04M; West share ≈ 30% = $4.2M.
- A local West DC typically removes 35–45% of delivered cost on that lane (line-haul replaced by inbound consolidation plus short local delivery) → savings of roughly $1.5M–$1.9M.
Costs added:
- 3PL fixed and committed: $1.4M.
- Inbound: 60% of supply arrives in Columbus from Asia. Serving a West DC means either splitting the inbound or transloading - realistically little or no inbound saving, and possibly a new inbound leg. Add $0.1M–$0.2M.
- Inventory: total $22M; West share maybe 25% ≈ $5.5M. Two DCs forecast independently, so safety stock rises ~25–35% on that portion → +$1.4M–$1.9M of inventory × 25% carrying = $0.35M–$0.5M per year, plus duplicated obsolescence risk.
Net: roughly break-even - between −$0.4M and +$0.2M, well inside model error. The honest conclusion is that the cost case alone does not decide this; anyone presenting a clean positive number is choosing favourable assumptions.
2. What else moves that is not in that arithmetic, and how should it be weighed?
Read the worked answer
The proposal is really a service investment wearing a cost-case costume - so evaluate it that way.
- Service: a West DC converts 2–3 day ground service into next-day for West accounts, which is the actual basis of the top-200 promise. Quantify the revenue at risk in West accounts that are currently served slower than promised, and the win rate on West prospects. If that number is well above $0.5M of annual gross margin, the case is positive even at break-even freight.
- The promise itself: with one DC, next-day to the West is either being met by premium air (invisible in the 7.8% average) or quietly missed. Check the actual service performance by region before assuming the baseline is honest.
- Order behaviour and mix: shorter lead time usually shifts order patterns to smaller, more frequent orders - which raises pick/pack cost and can erode part of the freight saving.
- Complexity and risk: two inventory positions, double the SKU-location forecasting problem, duplicated cycle counting, split customer service, and a new single point of failure on the West Coast. These are real costs even when unquantified.
- Fixed commitment risk: a three-year $1.4M commitment is a bet on a demand forecast for a region you do not currently serve well.
3. What do you recommend to the COO, and what cheaper alternatives should be tested first?
Read the worked answer
Recommend: do not sign the three-year commitment on the current analysis; approve a 90-day test of a variable-cost West presence and return with a service-and-revenue case.
Cheaper intermediates to test in parallel:
- Zone-skipping or a pool point (e.g., Reno or a West carrier hub) - trailer-load from Columbus to the pool point, local delivery from there. Captures much of the line-haul saving with no fixed DC.
- Cross-dock with a 2-day ground promise for West accounts, sold honestly rather than discounted by expedite spend.
- Carrier and mode mix review - the 30% West share of freight may reflect a parcel-heavy mix that a regional carrier or consolidated LTL lane would price better than a new facility.
- A 3PL with variable commitment and a 12-month exit rather than a three-year fixed deal, so the demand assumption can be validated.
Decision rule to give the COO: proceed with the fixed West DC only if (a) West service gaps are demonstrably costing more than $0.5M of annual gross margin, and (b) a single shared forecast across both locations is in place so the inventory duplication is bounded. Otherwise take the pool-point route and revisit in twelve months.