SCPro key terms
SCPro · Get comfortable with the vocabulary.
- Bullwhip Effect
- Related: Demand Sensing, Collaborative Planning, Forecasting, and Replenishment (CPFR), Safety Stock
Small shifts in customer demand trigger progressively larger swings in orders, inventory, and production as you move upstream, caused by batch ordering, promotions, order rationing, and repeated forecast updating.
- Sales and Operations Planning (S&OP)
- Related: Integrated Business Planning (IBP), Forecast Accuracy, Master Production Schedule (MPS)
A recurring cross-functional process that balances the demand plan against supply capability over a rolling horizon, aligning sales, marketing, operations, and finance on one consensus plan for volume and mix.
- Collaborative Planning, Forecasting, and Replenishment (CPFR)
- Related: Bullwhip Effect, Sales and Operations Planning (S&OP), Demand Sensing
A joint approach in which trading partners share demand forecasts, promotional plans, and stock positions to build one shared plan and synchronize replenishment, reducing both stockouts and excess inventory.
- Supply Chain Network Design
- Related: Total Landed Cost, Distribution Requirements Planning (DRP)
The analytical work of deciding how many plants, warehouses, and flow lanes to use, where to locate them, and which customers each serves, weighing service targets against fixed and transport cost.
- Forecast Accuracy
- Related: Safety Stock, Demand Sensing, Sales and Operations Planning (S&OP)
A measure of how closely predicted demand matched actual demand; percentage-error metrics such as MAPE quantify size of error while bias reveals systematic over- or under-forecasting.
- Integrated Business Planning (IBP)
- Related: Sales and Operations Planning (S&OP), Supply Chain Network Design
An extension of sales and operations planning that adds financial reconciliation, scenario modeling, and longer horizons, tying the operational plan directly to revenue, margin, and cash targets.
- Demand Sensing
- Related: Bullwhip Effect, Collaborative Planning, Forecasting, and Replenishment (CPFR), Forecast Accuracy
Using near-real-time downstream signals such as point-of-sale data, customer orders, and shipments to shorten forecast latency and catch demand shifts earlier than a monthly planning cycle allows.
- Postponement
- Related: Supply Chain Network Design, Cross-Docking
Delaying final configuration, assembly, or packaging until customer demand is known, so a generic base inventory can serve many finished variants and forecast risk is reduced.
- Total Cost of Ownership (TCO)
- Related: Total Landed Cost, Supplier Scorecard, Strategic Sourcing
A purchasing evaluation that adds every cost of acquiring and using an item over its life, including price, freight, duties, quality defects, carrying cost, maintenance, and disposal, instead of comparing unit prices alone.
- Total Landed Cost
- Related: Incoterms, Total Cost of Ownership (TCO)
The supplier price plus freight, duties, insurance, handling, and currency costs required to move goods to a named destination, used to compare offers from different geographies and trade terms.
- Request for Proposal (RFP)
- Related: Strategic Sourcing, Supplier Scorecard
A formal document inviting suppliers to propose solutions and pricing against stated requirements, used when specifications leave room for design alternatives and evaluation must weigh capability, not price alone.
- Spend Analysis
- Related: Category Management, Strategic Sourcing
Classifying and aggregating historical purchase data by category, supplier, and business unit to expose consolidation opportunities, off-contract buying, and negotiating leverage before sourcing decisions are made.
- Category Management
- Related: Spend Analysis, Strategic Sourcing, Supplier Relationship Management (SRM)
Organizing purchasing around groups of similar spend and applying a tailored strategy to each, with a dedicated owner, supplier plans, and performance targets suited to that group's risk and value.
- Supplier Scorecard
- Related: Supplier Relationship Management (SRM), On-Time In-Full (OTIF)
A structured, usually periodic report rating suppliers on delivery, quality, cost, responsiveness, and compliance, used to trigger improvement actions and to inform future award decisions.
- Strategic Sourcing
- Related: Spend Analysis, Category Management, Total Cost of Ownership (TCO)
A multi-step process that analyzes spend, studies the supply market, evaluates alternatives, and negotiates agreements designed to optimize total value for a category rather than the lowest unit price.
- Contract Lifecycle Management
- Related: Supplier Relationship Management (SRM), Request for Proposal (RFP)
Managing supplier agreements from request through drafting, negotiation, signature, obligation tracking, renewal, and termination so that terms stay enforceable and expirations do not lapse unnoticed.
- Supplier Relationship Management (SRM)
- Related: Supplier Scorecard, Category Management, Contract Lifecycle Management
A disciplined approach to segmenting suppliers by strategic importance and managing them through business reviews, joint improvement projects, and shared metrics to extract more value from key relationships.
- Material Requirements Planning (MRP)
- Related: Bill of Materials (BOM), Master Production Schedule (MPS), Reorder Point
A calculation that explodes the master schedule through the bill of materials to determine component quantities and timing, netting on-hand stock and open orders to generate planned purchase and production orders.
- Bill of Materials (BOM)
- Related: Material Requirements Planning (MRP), Master Production Schedule (MPS)
A structured list of the components, quantities, and subassemblies required to build one unit of a product, forming the basis for material planning, costing, and engineering change control.
- Master Production Schedule (MPS)
- Related: Material Requirements Planning (MRP), Sales and Operations Planning (S&OP), Bill of Materials (BOM)
A time-phased statement of which finished products will be built and when, converting the aggregate plan into specific quantities by date within available capacity.
- Safety Stock
- Related: Reorder Point, Forecast Accuracy, Bullwhip Effect
Extra inventory held beyond expected demand to absorb forecast error, demand variability, and supply delays so that a targeted service level is still met.
- Economic Order Quantity (EOQ)
- Related: Reorder Point, Inventory Turns, Safety Stock
The order size that minimizes the sum of ordering cost and inventory holding cost, calculated from annual demand, the cost of placing one order, and the holding cost per unit.
- Reorder Point
- Related: Safety Stock, Economic Order Quantity (EOQ), Kanban
The inventory level that triggers a new replenishment order; it equals expected demand during the replenishment lead time plus safety stock to cover variability.
- ABC Analysis
- Related: Cycle Counting, Inventory Turns, Spend Analysis
Ranking inventory items or suppliers by annual value so that control policies and management attention concentrate on the small share of items that account for most of the spend.
- Cycle Counting
- Related: ABC Analysis, Warehouse Management System (WMS)
Auditing a portion of inventory every day on a rotating schedule rather than doing one full annual physical count, correcting discrepancies continuously and investigating their root causes.
- Theory of Constraints
- Related: Kanban, Just-in-Time (JIT)
A management approach holding that throughput is limited by one bottleneck resource at a time, so improvement effort should exploit and subordinate to that constraint before adding capacity to it.
- Just-in-Time (JIT)
- Related: Kanban, Theory of Constraints, Milk Run
Producing and receiving only what is needed, when it is needed, in small lots, so inventory stays low and problems surface quickly; it depends on stable schedules and reliable suppliers.
- Inventory Turns
- Related: ABC Analysis, Economic Order Quantity (EOQ), Safety Stock
Cost of goods sold divided by average inventory value for a period, showing how many times stock cycles; higher turns generally mean less working capital tied up in stock.
- Kanban
- Related: Just-in-Time (JIT), Reorder Point, Theory of Constraints
A pull signal, such as a card, marked bin, or electronic message, that authorizes replenishment of a fixed quantity once material is consumed, capping work-in-process and linking each step to actual usage.
- Incoterms
- Related: Total Landed Cost, Load Tender
Standardized international trade rules that define where a seller's responsibility for goods ends and a buyer's begins, covering freight, insurance, customs clearance, and the point where risk transfers.
- Cross-Docking
- Related: Freight Consolidation, Distribution Requirements Planning (DRP), Postponement
Unloading inbound shipments and reloading them onto outbound vehicles with little or no storage in between, cutting handling, inventory, and dwell time at a distribution center.
- Third-Party Logistics (3PL)
- Related: Warehouse Management System (WMS), Reverse Logistics, Last-Mile Delivery
An external provider that performs warehousing, transportation, or fulfillment activities under contract, letting the shipper convert fixed assets into variable cost and add capacity quickly.
- Last-Mile Delivery
- Related: On-Time In-Full (OTIF), Third-Party Logistics (3PL), Route Planning
The final leg of a shipment from a local hub or store to the customer's location, usually the most expensive segment per unit because of small drops, failed attempts, and urban congestion.
- On-Time In-Full (OTIF)
- Related: Supplier Scorecard, Last-Mile Delivery, Warehouse Management System (WMS)
A delivery performance measure requiring an order to arrive by the promised date and in the full ordered quantity; both conditions must be satisfied for the order to count.
- Freight Consolidation
- Related: Cross-Docking, Milk Run, Load Tender
Combining smaller shipments from several orders, customers, or shippers into a larger load so the move qualifies for better rate tiers and fewer vehicles are needed.
- Distribution Requirements Planning (DRP)
- Related: Supply Chain Network Design, Cross-Docking, Warehouse Management System (WMS)
Time-phased planning of inventory across a distribution network that nets demand at each warehouse and generates replenishment orders upstream, coordinating stock positions and inbound transport.
- Warehouse Management System (WMS)
- Related: Cycle Counting, Distribution Requirements Planning (DRP), Cross-Docking
Software that directs put-away, storage, picking, packing, and shipping tasks, tracking item locations and inventory in real time to improve accuracy and labor productivity.
- Reverse Logistics
- Related: Third-Party Logistics (3PL), Warehouse Management System (WMS)
Managing the flow of returned, repaired, recalled, or recyclable goods from the customer back through the network for credit, refurbishment, redistribution, or disposal.
- Load Tender
- Related: Freight Consolidation, Incoterms, On-Time In-Full (OTIF)
A shipper's formal offer of a shipment to a carrier stating pickup and delivery points, dates, weight, and equipment; the carrier's acceptance creates the commitment to haul.
- Milk Run
- Related: Freight Consolidation, Just-in-Time (JIT), Load Tender
A scheduled route where one vehicle makes a loop of several pickups or deliveries with small loads, raising vehicle utilization and lowering freight cost compared with separate trips.
- Route Planning
- Related: Last-Mile Delivery, Milk Run, Freight Consolidation
Sequencing stops and choosing paths for delivery or collection vehicles so that time windows, capacity, and driver hours are respected while total distance and cost are minimized.