SCPro · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Supply Chain Strategy and Integrated Planning

  • Map the end-to-end supply chain process flows (plan, source, make, deliver, return) and label the decision owner and time horizon at each stage

  • Translate three contrasting business strategies (cost leadership, responsiveness, differentiation) into supply chain design choices, order winners, and order qualifiers

  • Calculate and interpret forecast accuracy metrics - MAD, MAPE, and bias - on a 12-period demand series and state the corrective action for each pattern

  • Outline the monthly integrated planning cycle: inputs, outputs, meeting cadence, and the owner of each decision

Your checkpoint

One-page strategy-to-plan map plus a solved forecast-error worksheet covering 12 periods with bias and MAPE computed

Week 2

Supply Chain Strategy and Integrated Planning & Sourcing, Procurement, and Supplier Relationship Management

  • Build a 12-month aggregate plan matching demand to capacity under level, chase, and hybrid strategies, and quantify the cost of each

  • Compute safety stock and reorder points at 90/95/99% service levels and explain the marginal cost of each service step-up

  • Classify a 30-line spend extract by category and by ABC criticality, then identify the three categories with the largest consolidation opportunity

  • List six sourcing levers (specification change, volume consolidation, payment terms, freight, quality, lead-time) and estimate direction of total-cost impact for each

Your checkpoint

Three-scenario aggregate plan summary with cost comparison table and a completed spend-cube ABC classification

Week 3

Sourcing, Procurement, and Supplier Relationship Management

  • Construct a weighted RFx evaluation model with at least five criteria, normalize the scores, and justify the weighting logic

  • Calculate total cost of ownership for two supplier options including price, freight, quality cost, inventory carrying cost, and switching cost

  • Design a supplier scorecard with six KPIs, their formulas, data sources, and review cadence

  • Prepare a negotiation brief stating BATNA, target, walk-away point, and three tradeable variables for a single-source renewal

Your checkpoint

Supplier award recommendation memo containing the weighted scorecard, the TCO comparison, and the negotiation brief

Week 4

Sourcing, Procurement, and Supplier Relationship Management & Manufacturing, Production, and Inventory Management

  • Build a supplier risk register covering financial, capacity, geographic, quality, and compliance exposure, with a mitigation action per risk

  • Explain how contract terms on liability, warranties, price adjustment, and service levels shift risk between buyer and supplier

  • Compute EOQ, reorder point, and safety stock for five SKUs with different demand variability and lead times

  • Distinguish the inputs, outputs, and time fences of the master production schedule, MRP, and DRP

Your checkpoint

Milestone check: score at least 75% on a 40-question timed mixed set covering domains 1 and 2, plus a completed inventory-policy worktable for five SKUs

Week 5

Manufacturing, Production, and Inventory Management

  • Perform a three-level BOM explosion across four time periods, showing gross requirements, scheduled receipts, projected on-hand, and planned order releases

  • Set inventory targets at three service levels and show the tradeoff in carrying cost versus expected stockout cost

  • Apply lean, JIT, and theory-of-constraints logic to identify and relieve a described bottleneck in a production line

  • Design a cycle-count plan with ABC-based frequency, tolerance thresholds, and root-cause escalation steps

Your checkpoint

Completed MRP grid for a three-level BOM plus a one-page inventory policy sheet stating EOQ, safety stock, and count frequency per SKU class

Week 6

Manufacturing, Production, and Inventory Management & Logistics, Transportation, Distribution, and Customer Fulfillment

  • Compare push, pull, and hybrid scheduling models and select the appropriate model for three production environments with stated demand characteristics

  • Estimate warehouse capacity, dock requirements, and labor hours for a given throughput and unit profile

  • Evaluate rail, truckload, less-than-truckload, parcel, air, and ocean on cost per unit, transit time, variability, and emissions, and select a mode for four shipment profiles

  • Map the order-to-delivery cycle from order receipt to cash, and locate the two largest time sinks

Your checkpoint

Mode selection matrix with cost-per-unit and transit-time model, plus an order-to-delivery cycle-time map with two improvement actions

Week 7

Logistics, Transportation, Distribution, and Customer Fulfillment

  • Apply Incoterms rules to allocate cost, risk transfer point, and insurance responsibility across at least five named terms

  • Calculate landed cost per unit for an imported item including freight, duty, insurance, brokerage, and currency effect

  • Define a fulfillment KPI set - perfect order rate, OTIF, fill rate, order cycle time, cost to serve - with formulas and target ranges

  • Compare insourcing versus a third-party logistics provider using cost-to-serve and service-risk criteria, and outline a reverse logistics flow for returns

Your checkpoint

Landed-cost calculator with a worked imported-item example plus a one-page KPI dashboard specification including formulas and targets

Week 8

Supply Chain Strategy and Integrated Planning & Sourcing, Procurement, and Supplier Relationship Management & Manufacturing, Production, and Inventory Management & Logistics, Transportation, Distribution, and Customer Fulfillment

  • Solve three cross-domain scenarios that each require a sourcing decision, an inventory policy, and a distribution choice to be justified together

  • Re-drill every missed item from weeks 1 through 7 and state the underlying concept behind each error

  • Assemble a formula reference sheet covering forecasting error, EOQ, safety stock, reorder point, inventory turns, landed cost, and cost to serve

  • Complete two full-length timed practice sets under exam conditions and analyze pacing by domain

Your checkpoint

Two timed full-length practice sets scored at 80% or higher, plus a two-page formula and concept cheat sheet

Milestones

Week 2: Explain the integrated planning cycle end to end without notes and correctly compute bias, MAPE, safety stock, and reorder point on five fresh problems

Week 4: Score at least 75% on the 40-question timed mixed set across domains 1 and 2, and defend a supplier award decision using TCO rather than unit price

Week 6: Complete the MRP explosion and the mode selection matrix unaided, and articulate the inventory-versus-service tradeoff with numbers

Week 8: Score at least 80% on two full-length timed practice sets with no domain below 70%, and recall all eight core formulas from the cheat sheet without reference