SRS study materials
SRS study resources

SRS cheat sheet

SRS · Keep the key ideas within reach.

Quick reference

Fundamentals, Terminology, and Core Concepts

  • Orifice flow from a sprinkler: Q = K × √P, with Q in gpm, P in psi, and K the sprinkler discharge coefficient.

  • Pressure and elevation conversion: 1 psi = 2.31 ft of water column; 1 ft of water column = 0.433 psi.

  • Hazen–Williams friction loss uses C = 120 for steel pipe and C = 150 for copper and plastic pipe in NFPA 13 calculations.

  • Reference design densities: light hazard 0.10 gpm/ft², ordinary group 1 = 0.15, ordinary group 2 = 0.20, extra hazard group 1 = 0.30 gpm/ft².

  • Glass-bulb temperature colors: 135°F orange, 155°F red, 175°F yellow, 200°F green, 286°F blue, 360°F purple, 440°F black.

  • Sprinkler rating is selected at least 30°F above the maximum expected ceiling temperature at the sprinkler location.

  • A wet system stores water at the valve; a dry system stores air and must deliver water to the inspector's test connection within 60 seconds of trip.

  • On the density/area curve, higher design densities are paired with smaller assumed operating areas for the same hazard class.

  • Hose stream allowance is added to the sprinkler demand, expressed in gpm for a stated duration (typically 30 to 120 minutes).

Quick reference

Codes, Standards, and Regulatory Compliance

  • NFPA 13 (installation), NFPA 14 (standpipes), NFPA 20 (pumps), NFPA 25 (ITM), and NFPA 72 (alarm) are separate documents and can be enforced in different editions on the same project.

  • Model codes become legally enforceable only when adopted by a jurisdiction; the adopted edition and local amendments govern, not the newest published edition.

  • The authority having jurisdiction (AHJ) approves plans, grants modifications, and may impose inspection or test frequencies stricter than the standard minimum.

  • NFPA 25 monthly tasks include gauge readings, control valve position verification, and dry pipe or preaction air pressure checks.

  • NFPA 25 quarterly tasks include waterflow alarm device tests and valve supervisory (tamper) switch tests.

  • NFPA 25 annual tasks include the main drain test, fire pump flow test, dry pipe valve trip test, and alarm check valve test.

  • Backflow prevention assemblies protecting the potable supply are tested annually by certified testers under state and local cross-connection rules.

  • A code modification or accepted alternative must be documented in writing by the AHJ before the deviation is installed.

Quick reference

Planning, Design, and Specification

  • Standard spray sprinklers in ordinary hazard: maximum 15 ft spacing and 130 ft² per sprinkler; extra hazard: maximum 12 ft spacing and 100 ft² per sprinkler.

  • Standard pendent and upright deflectors sit 1 in to 12 in below the ceiling unless the individual listing states otherwise.

  • Three times rule: an obstruction is acceptable when the sprinkler is located within three times the obstruction's depth below the deflector plane.

  • Hydraulic calculation begins at the most remote sprinkler and adds elevation loss, hose stream allowance, device and backflow losses, then compares total demand to the supply curve.

  • Water supply flow test data used for design must be no more than 12 months old and adjusted for seasonal and daily demand variation.

  • Working plans require AHJ approval before installation and show occupancy classification, sprinkler layout, pipe sizes, hydraulic calculations, and material lists.

  • Fire pump curve checkpoints: shutoff (churn) pressure no more than 140% of rated pressure, and 150% of rated flow at no less than 65% of rated pressure.

  • Pipe schedule sizing is allowed only within limits on system area, occupancy, and pressure; all other systems require hydraulic calculation.

  • A hydraulic design placard at the riser states density, operating area, hose allowance, and duration so later changes can be evaluated.

Quick reference

Implementation, Operations, and Process Control

  • Hydrostatic test: 200 psi for 2 hours; where maximum working pressure exceeds 150 psi, test at 50 psi above working pressure for the same duration.

  • Underground mains are flushed before connection to building piping at a flow producing roughly 10 ft/s velocity to clear debris.

  • An impairment program names an impairment coordinator, notifies the AHJ and insurer, tags the system, and establishes compensating measures until protection is restored.

  • Hot work requires a written permit, a fire watch during the work, and continued monitoring for at least 30 minutes after the work ends.

  • Lockout/tagout isolates energy at pumps, valves, and disconnects, with verification of zero energy before maintenance begins.

  • Dry pipe and preaction systems depend on correct priming water level, correct air pressure, and a working air source to keep trip time within limits.

  • Any field change that alters hydraulic demand - added heads, larger area, changed pipe - requires recalculation and AHJ approval against the design placard.

  • Antifreeze solution concentration must be measured and documented; certain high-concentration solutions are restricted because of flammability.

Quick reference

Inspection, Testing, and Maintenance

  • Weekly: fire pumps run at no flow (churn) for at least 10 minutes for electric drive and 30 minutes for diesel drive.

  • Monthly: gauge readings, valve position verification, and dry pipe or preaction system air pressure checks.

  • Quarterly: waterflow alarm tests through the inspector's test connection and valve supervisory switch tests.

  • Annual: main drain test, fire pump flow test, dry pipe valve trip test, and alarm check valve test.

  • Every 5 years: gauge replacement or calibration, internal inspection of dry and preaction piping, and hydrostatic test of dry standpipes at 200 psi for 2 hours.

  • Spare sprinkler stock: 6 spares for systems up to 300 sprinklers, 12 for 301 to 1000, and 24 above 1000, matching installed types.

  • Replacement sprinklers must match the original K-factor, temperature rating, orientation, and response type.

  • Inspection and test records are retained for at least 1 year and made available to the AHJ on request.

Quick reference

Safety, Risk Management, and Environmental Controls

  • Risk control hierarchy: elimination, substitution, engineering controls, administrative controls, then personal protective equipment as the last layer.

  • Entry into tanks, vaults, and pits requires atmospheric testing, a permitted entry, an attendant, and rescue provisions.

  • Test water discharge must be controlled to prevent flooding, erosion, and uncontrolled runoff to storm or sanitary systems.

  • Backflow prevention assemblies protect the potable supply from cross-connection contamination and are tested annually by certified testers.

  • Freeze protection options are dry pipe, preaction, listed antifreeze solution, and added heat; wet pipe in an unheated space risks rupture and total loss of protection.

  • Seismic bracing, sway bracing, and flexible couplings limit pipe displacement and sprinkler damage in seismic zones.

  • Microbiologically influenced corrosion risk is highest in dry and preaction piping where trapped water and air coexist; internal checks occur at 5-year intervals.

  • Risk increases with impairment size and duration: longer and larger shutdowns require broader compensating measures such as fire watch and prohibition of hot work.

Quick reference

Documentation, Reporting, and Professional Practice

  • The hydraulic design placard at the riser records density, operating area, hose stream allowance, and duration; modifications may not exceed it without recalculation.

  • The contractor's material and test certificate documents flushing and hydrostatic test results, including pressures, durations, and signatures.

  • ITM reports record date, component, test method, result, and tester identity; the owner keeps a copy and retains records at least 1 year.

  • As-built drawings reflect installed conditions and approved changes and serve as the baseline for future plan review and modification.

  • Any AHJ variance, code modification, or accepted alternative is documented in writing and retained in the project file.

  • Water supply test documentation includes static pressure, residual pressure, pitot or flow data, the hydrant used, and the test date.

  • Professional practice requires reporting observed deficiencies accurately, never signing for work not performed, and disclosing conflicts to client and AHJ.