You are the surveyor for a housing association owning a 2016-built, 12-storey residential tower with an ACM (aluminium composite material) rainscreen cladding system. The building has a single stair, a 'stay put' strategy and no sprinklers. A desktop review suggests the ACM panels may have a polyethylene core. The local fire and rescue service has issued an information notice, and the building safety regulator has asked for a remediation plan within 60 days. The housing association has £3.2 m available, but a full replacement is estimated at £8–10 m. There are 84 households, some of whom are leaseholders. A residents' meeting is scheduled, and the local press has already run a story. The original contractor is insolvent and the architect's PI insurance has a £1 m excess.
1. Identify the immediate statutory and regulatory duties the housing association must satisfy now, and distinguish them from longer-term remediation obligations.
Read the worked answer
Immediate duties: (1) Under the Regulatory Reform (Fire Safety) Order 2005, the responsible person must review the fire risk assessment in light of the ACM information and take all reasonably practicable steps to reduce risk - this may include interim measures such as a waking watch, enhanced detection, or a simultaneous-evacuation strategy pending the FRA review. (2) Under the Building Safety Act 2022, the building is likely a 'higher-risk building' (18 m+ or 7+ storeys); the accountable person must ensure the safety case and the golden thread are in order, and must engage with the Building Safety Regulator. (3) The information notice from the FRS should be responded to formally and promptly. (4) Leaseholder and resident communication duties - the association should not wait for the 60-day deadline to inform residents. Longer-term duties: a costed remediation plan, a competent contractor procurement, and a legal position on recovering costs from the original contractor (likely limited by insolvency) and the architect (subject to the £1 m excess). The two must not be conflated - delaying interim measures because a full plan is not yet affordable is a breach.
2. The association cannot afford full replacement. Advise on how to prioritise spending and what interim measures are defensible.
Read the worked answer
Prioritisation should be risk-based, not cosmetic. The first step is to commission a fire engineering assessment of the actual cladding (sample panel removal and laboratory testing to confirm the core material - desktop review is not enough) and a full FRA review by a competent assessor. If the core is confirmed as PE, the risk is concentrated at: the single stair (means of escape), the 'stay put' strategy (likely untenable), and the lack of sprinklers. The most defensible interim spend is therefore: (a) change to a simultaneous evacuation strategy with enhanced common alarm and clear resident briefings; (b) a waking watch or, better, a temporary common alarm and detection system if the FRA supports it; (c) sprinkler protection to the common areas and stair as a medium-term measure if full replacement is years away. Partial cladding replacement (e.g. the most exposed elevations or the stair enclosure) may be a rational staged approach. I would present a staged, costed options appraisal to the board, with the fire engineer's sign-off on each interim measure, and document that the association has taken all reasonably practicable steps - this is what protects both residents and the association legally.
3. How would you handle the leaseholder cost-recovery and communication issues?
Read the worked answer
On cost recovery: the lease terms and any service charge provisions must be reviewed by a solicitor before any demand is made - under the Building Safety Act 2022 there are significant restrictions on passing cladding remediation costs to qualifying leaseholders in relevant buildings, and the leaseholder protections must be applied. The association should not assume it can recover the full cost. On communication: a residents' meeting should be held promptly, with a clear, honest statement of what is known, what is not yet known, what interim measures are being put in place, and when the next update will be. The press interest should be managed by a single, consistent spokesperson. Leaseholders should be given written information about the leaseholder protections and a named contact. The professional duty is to avoid both alarmism and false reassurance; the surveyor's role is to provide the technical facts that underpin the association's position, and to ensure the board understands the difference between the technical risk and the financial/legal exposure.