Rising damp
Groundwater rising through permeable masonry by capillary action, typically limited to about 1–1.5 m above ground and controlled by a continuous damp-proof course.
Interstitial condensation
Condensation forming within a construction when water vapour reaches its dew point inside the fabric; assessed by the Glaser method or dynamic hygrothermal modelling.
Thermal bridge
A localised area of higher heat loss where geometry or material changes, measured by linear thermal transmittance (psi value) in W/mK.
Carbonation
Reaction of atmospheric carbon dioxide with cement hydrates, lowering pore-water pH and depassivating embedded steel, allowing corrosion to begin.
Cavity wall ties
Metal connectors tying the two leaves of a cavity wall; corrosion-resistant ties maintain structural integrity and prevent leaf separation.
Damp-proof course
A continuous impermeable layer in masonry that prevents moisture rising by capillary action; discontinuity or bridging defeats its purpose.
Characteristic strength
The strength value below which no more than 5% of test results fall, used as the basis for concrete class designation at 28 days.
Timber moisture content
The percentage of water by mass in timber; above about 20% it creates conditions for fungal decay and insect attack.
Schedule of condition
A record of the existing condition of premises, often prepared at lease commencement, used as a baseline for later dilapidations liability.
Thermal imaging survey
An infrared survey identifying surface temperature differences; it detects thermal anomalies rather than moisture directly and requires corroboration.
Condition rating scale
A consistent grading (e.g., 1–5 or A–D) applied to each building element to record defect severity and urgency for maintenance planning.
Party Wall etc. Act 1996
Legislation in England and Wales governing works to party structures, excavations near adjoining buildings, and new walls at boundaries.
Listed building consent
A separate consent required for works affecting the character or appearance of a listed building, in addition to any planning permission.
CDM 2015
The Construction (Design and Management) Regulations 2015, imposing duties on clients, designers, and contractors to manage health and safety.
U-value
Thermal transmittance in W/m²K, measuring heat flow through a building element per unit area and temperature difference; lower values mean better insulation.
Air permeability
A measure of the building envelope's airtightness, expressed in m³/h·m² at 50 Pa and determined by a pressure test.
Legionella control
Management of water temperatures and system design to limit Legionella growth, including stored hot water above 60 °C and cold water below 20 °C.
Re-pointing mortar
Mortar used to replace weathered joints; it should be weaker and more permeable than the masonry to weather sacrificially and avoid spalling.
Practical completion
The contract stage at which works are complete except for minor defects, triggering the defects liability period and release of part of retention.
Pay less notice
A notice issued under statutory payment provisions reducing the amount otherwise payable; it must be given within the contract's specified period.
Professional indemnity insurance
Insurance covering a professional's liability for negligent acts, errors, or omissions in the provision of services, excluding deliberate wrongdoing.
CDM risk hierarchy
The requirement to eliminate, reduce, or control health and safety risks at source before relying on personal protective equipment.
Whole-life carbon
The sum of embodied and operational carbon emissions over a building's life, used to compare retrofit and new build options.
Minimum intervention
A conservation principle favouring the least invasive repair necessary to retain significance and fabric, with reversibility where practicable.
Dry rot
Fungal decay by Serpula lacrymans requiring moisture and poor ventilation; it can spread through masonry and behind plaster.
Movement crack monitoring
Recording crack width over time with tell-tales or gauges to distinguish live movement from dormant, stabilised cracking.
Building Safety Act 2022
Legislation introducing higher-risk building duties, including the golden thread of information and accountable persons for building safety.
MVHR
Mechanical ventilation with heat recovery, a balanced supply and extract system recovering heat from exhaust air; requires filter maintenance.
Underpinning
Strengthening or deepening foundations, using methods such as mass concrete, mini-piled, or beam-and-pile, selected by ground conditions and load.
Adjudication
A statutory dispute resolution process giving a binding decision until final determination, enforceable through the courts.
Glaser method
A steady-state calculation of interstitial condensation risk comparing vapour pressure with saturation vapour pressure through construction layers.
Adaptive reuse
Retaining and repurposing an existing building for a new use, usually reducing embodied carbon compared with demolition and new build.