ABBE L6 Building Surveying study materials
ABBE L6 Building Surveying study resources

ABBE L6 Building Surveying study plan

ABBE L6 Building Surveying · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Building pathology and defects & Construction technology and materials

  • Classify the principal mechanisms of damp ingress (rising, penetrating, condensation, plumbing) and match each to its diagnostic indicators

  • Explain the causes and progression of common structural defects including subsidence, heave, wall tie failure and roof spread

  • Describe the properties, typical uses and failure modes of the main construction materials (masonry, timber, concrete, steel, mortars and renders)

  • Trace how construction detailing decisions in traditional and modern buildings create predictable defect patterns

Your checkpoint

A one-page defect-to-cause diagnostic matrix covering at least 15 named defects with their indicators and likely remedies

Week 2

Building pathology and defects & Construction technology and materials

  • Diagnose cracking by type and width, distinguishing movement, thermal, settlement and structural causes

  • Explain moisture behaviour and salt-related deterioration in masonry, including spalling and efflorescence

  • Compare traditional and modern construction methods and identify where material incompatibility causes decay

  • Apply knowledge of timber decay, insect attack and rot to describe survey evidence and treatment options

Your checkpoint

A written case-style analysis of three hypothetical defect scenarios (approx. 800 words) with reasoned diagnosis and recommended next steps

Week 3

Inspection, surveying and condition assessment & Building pathology and defects

  • Plan a systematic inspection sequence for a building exterior and interior, listing what to observe at each stage

  • Select appropriate survey instruments and techniques (levels, moisture meters, crack gauges, thermal imaging) for given defect investigations

  • Distinguish between condition, dilapidation and structural surveys and state the purpose and typical output of each

  • Interpret survey readings and observations to reach a defensible condition rating

Your checkpoint

A completed mock condition survey schedule for a described building, with observations, severity ratings and prioritised recommendations

Week 4

Legal and regulatory frameworks & Professional practice, ethics and health and safety

  • Summarise the key duties and obligations arising under building regulations, fire safety legislation and party wall legislation as they affect surveyors

  • Identify when listed building consent, planning permission or building control approval is required for proposed works

  • Apply the professional code of conduct and ethical decision-making to realistic conflicts of interest and competence scenarios

  • Outline health and safety duties for surveyors, including risk assessment for site visits and work at height

Your checkpoint

A regulatory compliance checklist for a described refurbishment project plus a short written ethical dilemma response with a justified course of action

Week 5

Repair, maintenance and refurbishment & Building services and environmental performance

  • Match repair and maintenance techniques to defect types, distinguishing repair from replacement and like-for-like from upgrade

  • Explain the principles of planned preventative maintenance and how to build a maintenance schedule from survey findings

  • Describe the main building services (heating, ventilation, drainage, electrical) and common faults surveyors should recognise

  • Assess how ventilation, insulation and moisture control interact to affect environmental performance and occupant health

Your checkpoint

A five-year maintenance plan for a described building, linking each scheduled intervention to a survey finding and citing the relevant repair principle

Week 6

Contract administration and project management & Sustainability and building conservation

  • Explain the roles and responsibilities of contract administrator, employer's agent and principal designer under common procurement routes

  • Describe how variations, valuations, extensions of time and practical completion are administered and recorded

  • Apply conservation principles (minimum intervention, reversibility, honesty of repair) to refurbishment decisions in historic fabric

  • Evaluate sustainability interventions such as retrofit insulation and glazing upgrades for their heritage and moisture implications

Your checkpoint

A contract administration scenario pack: a variation instruction, a practical completion record and a conservation justification note for one proposed intervention

Week 7

Building pathology and defects & Inspection, surveying and condition assessment & Construction technology and materials

  • Re-test weak areas by working through mixed defect-diagnosis and survey-method questions under timed conditions

  • Explain survey methodology choices, limitations and sources of error in inspection and reporting

  • Consolidate material performance knowledge by comparing alternative repair materials for compatibility and durability

  • Practise structuring written answers that move from observation to diagnosis to recommendation

Your checkpoint

A timed 60-question mixed mock across domains 1-3 with a scored review log identifying the three weakest sub-topics

Week 8

Legal and regulatory frameworks & Building services and environmental performance & Repair, maintenance and refurbishment & Contract administration and project management & Professional practice, ethics and health and safety & Sustainability and building conservation

  • Consolidate regulatory, services, repair, contract and ethics knowledge into concise revision summaries

  • Complete a full-length timed mock examination across all nine domains

  • Review every incorrect answer and write a corrective note for each

  • Finalise a personal exam-day strategy covering time allocation and question sequencing

Your checkpoint

A full-length mock exam result with a completed error-analysis log and a one-page exam-day strategy sheet

Milestones

Week 2: Can correctly diagnose at least 12 of 15 defect scenarios in the week 1 matrix without notes and state the recommended investigation for each

Week 4: Can produce a regulatory compliance checklist from memory for a simple refurbishment and articulate the surveyor's ethical and H&S duties in a spoken five-minute summary

Week 6: Scores at least 65% on the contract administration and conservation scenario pack when self-marked against the stated criteria

Week 8: Scores at least 70% on the full-length timed mock with no single domain below 60%, and has a written corrective note for every missed question