ABBE L6 Building Surveying study materials
ABBE L6 Building Surveying study resources

ABBE L6 Building Surveying cheat sheet

ABBE L6 Building Surveying · Keep the key ideas within reach.

Quick reference

Building Pathology and Defects

  • Defect diagnosis follows a symptom → mechanism → cause hierarchy; treating the symptom without identifying the mechanism allows recurrence.

  • Dampness is classified as rising, penetrating, condensation, or plumbing leak; each has a distinct moisture profile and salt pattern.

  • Condensation occurs when surface temperature falls below dew point; the dew point depends on air temperature and relative humidity, not on building age.

  • Hygroscopic salts (chlorides, nitrates) in masonry draw moisture from air at relative humidities above roughly 70–75%.

  • Thermal bridging raises local heat loss and lowers internal surface temperature; it is measured by linear thermal transmittance (psi value, W/mK).

  • Sulfate attack on cement-based mortar produces ettringite expansion; it requires a sulfate source (ground, brick, or gypsum plaster) plus moisture.

  • Concrete carbonation reduces pore-water pH from about 12.5 to below 9, depassivating embedded steel and initiating corrosion once the carbonation front reaches the reinforcement.

  • Differential movement between materials (e.g., timber and masonry) produces cracking that follows the stiffer element's geometry, often at openings and corners.

Quick reference

Construction Technology and Materials

  • Traditional loadbearing masonry relies on mass and wall thickness for stability; modern cavity walls rely on ties, restraints, and lateral support.

  • Timber strength is graded (strength classes C14–C40 for softwood); moisture content above about 20% creates risk of fungal decay.

  • Concrete characteristic strength is defined at 28 days on 150 mm cubes (or cylinders); the specified class (e.g., C25/30) is the 5% fractile strength.

  • Steel loses roughly half its ambient yield strength at around 550–600 °C, which underpins fire protection thickness calculations.

  • Cavity wall ties should be stainless steel or equivalent; galvanized or mild steel ties corrode and cause horizontal cracking and wall tie failure.

  • Damp-proof courses (DPC) and damp-proof membranes (DPM) must be continuous and lapped; a bridged or discontinuous DPC defeats the whole assembly.

  • Cold-formed steel and engineered timber (glulam, LVL) allow long spans but require connection design and protection against moisture and fire.

  • Roof pitch, underlay, and ventilation must be compatible: warm and cold roof constructions have different ventilation requirements to avoid interstitial condensation.

Quick reference

Inspection, Surveying and Condition Assessment

  • Survey levels progress from a brief condition inspection to a full building survey; scope and limitations must be stated in the report.

  • Moisture meters give relative readings, not absolute moisture content; readings require calibration and corroboration with other evidence.

  • Thermal imaging detects temperature differences; it identifies thermal anomalies, not moisture directly, and needs confirmation with a moisture meter.

  • Condition assessment uses a consistent rating scale (e.g., 1–5 or A–D) applied to each element, with defect severity and urgency recorded separately.

  • Measured surveys use total stations, laser scanners, or photogrammetry; accuracy statements should state tolerance and datum.

  • A dilapidations-style schedule of condition records existing defects at lease commencement and is the baseline for later liability.

  • Endoscope and borescope inspection allows non-destructive examination of cavities, voids, and hidden timbers.

  • Sampling (e.g., for asbestos, salts, or timber decay) must follow a defined protocol; results apply only to the sampled locations.

Quick reference

Legal and Regulatory Frameworks

  • Building Regulations approval can be obtained via full plans or building notice; completion certificates confirm compliance on completion.

  • The Party Wall etc. Act 1996 applies in England and Wales to party structures, excavations within 3 m (or 6 m for deeper excavation), and new walls at boundaries.

  • Planning permission controls use and development; listed building consent is separately required for works affecting a listed building's character.

  • The Construction (Design and Management) Regulations 2015 impose duties on clients, principal designers, principal contractors, and contractors, with a construction phase plan and health and safety file.

  • The Regulatory Reform (Fire Safety) Order 2005 places fire safety duties on the responsible person for premises; it requires a fire risk assessment.

  • The Control of Asbestos Regulations 2012 require asbestos surveys before work and licensed contractors for high-risk removal.

  • Under the Defective Premises Act 1972, a duty of care applies to work on dwellings; limitation periods differ from ordinary contract and tort periods.

  • Accessibility is governed by Approved Document M (and equivalent devolved documents); reasonable provision must be made for access and use.

Quick reference

Building Services and Environmental Performance

  • U-values (W/m²K) measure fabric heat loss; lower values mean better insulation, and the target depends on the building element and regulations.

  • SAP and SBEM are the compliance tools for dwellings and non-dwellings respectively under the energy provisions of the Building Regulations.

  • Ventilation rates are set by Approved Document F; background ventilators plus intermittent or continuous extract must meet the specified performance.

  • Air permeability (m³/h·m² at 50 Pa) is measured by a pressure test; lower values indicate a tighter building envelope.

  • Interstitial condensation risk is assessed using the Glaser method or dynamic hygrothermal modelling; the Glaser method is steady-state and conservative.

  • Heat pumps, MVHR, and solar thermal must be sized against the design heat loss and hot water demand, not the boiler's nominal output.

  • Legionella risk management requires control of water temperatures (stored hot water above 60 °C, distribution above 50 °C, cold below 20 °C).

  • Acoustic performance is regulated by Approved Document E; separating wall and floor constructions must meet specified airborne and impact sound insulation.

Quick reference

Repair, Maintenance and Refurbishment

  • Repair strategy selection balances cost, durability, and reversibility; like-for-like repair is generally preferred in historic fabric.

  • Re-pointing mortar should be weaker and more permeable than the masonry units to allow sacrificial weathering and avoid spalling.

  • Cement-based renders and mortars on traditional masonry can trap moisture and cause frost damage; lime-based mixes are usually more compatible.

  • Cathodic protection and chloride extraction are electrochemical repair options for reinforced concrete; both require specialist design.

  • Structural repairs (e.g., crack stitching, resin injection, underpinning) require a designed solution and monitoring, not a cosmetic patch.

  • Planned preventative maintenance schedules categorise work as reactive, planned, or cyclical; condition data drives the priority ranking.

  • Refurbishment sequencing should address structural and weathertightness works before services and finishes, with temporary works designed accordingly.

  • Refurbishment of buildings containing asbestos requires a refurbishment/demolition survey before works begin.

Quick reference

Contract Administration and Project Management

  • Standard forms (e.g., JCT, NEC) allocate risk differently; the choice of form and amendments determines liability and payment mechanics.

  • Payment provisions under the Housing Grants, Construction and Regeneration Act 1996 require a payment notice and a pay less notice within defined periods.

  • Variations must be instructed in writing and valued using the contract's valuation rules; oral instructions should be confirmed in writing.

  • Extensions of time are assessed against the contract's relevant events; a delay analysis should distinguish critical from non-critical delay.

  • Loss and expense claims require proof of actual loss caused by a relevant matter; they are not a penalty on the contractor.

  • Practical completion triggers the defects liability (or rectification) period; the defects certificate or equivalent follows at its end.

  • Retention is typically 5% during works, reduced to 2.5% at practical completion, released at the end of the defects period.

  • Programme monitoring uses critical path analysis; float ownership and its consumption affect entitlement to time and money.

Quick reference

Professional Practice, Ethics and Health and Safety

  • Professional competence and integrity duties require disclosure of conflicts of interest and avoidance of work outside competence.

  • RICS and similar bodies publish ethical standards; breach can lead to disciplinary action, including expulsion.

  • Professional indemnity insurance covers negligent acts, errors, and omissions; it does not cover deliberate wrongdoing or contractual guarantees.

  • The CDM 2015 hierarchy of control requires risks to be eliminated, reduced, or controlled at source before relying on PPE.

  • Risk assessments must be recorded for significant risks; method statements translate assessment into safe working procedures.

  • Working at height, in confined spaces, and on contaminated land each require specific controls, permits, and competence checks before work starts.

  • Health and safety files and construction phase plans must be maintained and handed over at completion.

  • Confidentiality and data protection obligations apply to client information; personal data handling must comply with data protection law.

Quick reference

Sustainability and Building Conservation

  • Whole-life carbon includes embodied and operational carbon; retrofit decisions should be assessed on whole-life basis, not capital cost alone.

  • The energy hierarchy is fabric first, then efficient services, then low-carbon supply, then renewables.

  • Retrofitting solid-wall buildings requires vapour-open, breathable insulation to avoid trapping moisture and causing interstitial condensation.

  • Historic fabric significance is assessed through statements of significance and heritage impact assessments; minimum intervention and reversibility are guiding principles.

  • Adaptive reuse of existing buildings usually has lower embodied carbon than demolition and new build.

  • BREEAM and similar schemes assess environmental performance across energy, water, materials, ecology, and management categories.

  • Flood resilience measures (e.g., raised services, flood barriers, permeable surfaces) should be proportionate to the assessed flood risk.

  • Conservation repairs should use compatible materials and traditional techniques; inappropriate modern materials can accelerate decay.

Quick reference

Building Pathology and Defects (Supplementary)

  • Frost damage occurs when saturated masonry freezes; it requires both high saturation and repeated freeze-thaw cycles.

  • Wood-boring insects (e.g., common furniture beetle) require moisture content above about 18–20% to remain active; drying the timber is part of control.

  • Dry rot (Serpula lacrymans) requires moisture and reduced ventilation; it can spread through masonry and behind plaster.

  • Corrosion of embedded steel produces expansive rust that cracks and spalls concrete cover; cover depth and concrete quality govern initiation time.

  • Movement cracks are classified as live or dormant; monitoring (tell-tales or gauges) distinguishes ongoing from stabilised movement.

  • Roof defects often present as dampness remote from the leak; water tracks along structure and emerges at the lowest point.

  • Defective rainwater goods cause local saturation and are a common, low-cost cause of apparently structural dampness.

  • Condensation risk increases with occupant moisture generation, poor ventilation, and cold surfaces; the solution addresses all three.

Quick reference

Construction Technology and Materials (Supplementary)

  • Masonry mortar joint thickness and bond pattern affect compressive strength and resistance to rain penetration.

  • Reinforced concrete cover to reinforcement protects against carbonation and chlorides; cover is specified by exposure class.

  • Timber frame construction requires a ventilated cavity and a breather membrane; incorrect sequencing traps moisture.

  • Roof underlays and sarking govern wind uplift resistance and secondary weather protection.

  • Thermal insulation materials differ in conductivity (lambda value); lower lambda means better insulation for a given thickness.

  • Movement joints in masonry accommodate thermal and moisture movement; their spacing depends on material and exposure.

  • Bituminous and single-ply waterproofing systems have different detailing and compatibility requirements at upstands and outlets.

  • Structural steel connections (bolted or welded) must be designed for the forces and protected against corrosion and fire.

Quick reference

Inspection, Surveying and Condition Assessment (Supplementary)

  • A measured building survey records geometry; a condition survey records defects and their severity.

  • Photographic records should be dated, located, and cross-referenced to the schedule or plan.

  • Damp diagnosis uses a combination of visual inspection, moisture meters, and salt testing; no single test is conclusive.

  • Crack monitoring with tell-tales or Demec gauges records movement over time; the reading interval should match the expected rate of movement.

  • Non-destructive testing (e.g., cover meters, rebound hammers, ultrasonic) gives indicative results requiring calibration.

  • Asbestos surveys are management surveys (in-use) or refurbishment/demolition surveys (before intrusive work).

  • Access equipment (ladders, towers, MEWPs) selection must match the height, duration, and ground conditions of the inspection.

  • Reports should state the scope, limitations, and any areas not inspected, and distinguish fact from opinion.

Quick reference

Legal and Regulatory Frameworks (Supplementary)

  • The Building Safety Act 2022 introduces higher-risk building duties, including the golden thread of information and accountable persons.

  • Fire safety in higher-risk buildings requires a fire risk assessment and, where applicable, evacuation and construction control measures.

  • The Party Wall etc. Act 1996 requires notices, and where dissent occurs, appointment of a surveyor or surveyors to make an award.

  • Listed building consent is required for works affecting character; enforcement can require reinstatement.

  • The Equality Act 2010 requires reasonable adjustments for access to services and premises.

  • The Housing Act 2004 Housing Health and Safety Rating System (HHSRS) assesses hazards in dwellings, including damp and excess cold.

  • Contractual limitation periods and statutory limitation periods differ; the applicable period depends on the cause of action.

  • Building control bodies can require information and can serve enforcement notices for non-compliant work.

Quick reference

Building Services and Environmental Performance (Supplementary)

  • Thermal transmittance (U-value) is calculated from layer thicknesses and conductivities; repeating thermal bridges must be accounted for.

  • Overheating risk is assessed using dynamic thermal simulation or the simplified method in Approved Document O (dwellings).

  • Mechanical ventilation with heat recovery (MVHR) requires balanced supply and extract and regular filter maintenance.

  • Boiler efficiency is rated by ErP; condensing boilers recover latent heat only when return water temperature is low enough.

  • Lighting power density and daylight factors are used to assess lighting performance.

  • Water efficiency is regulated by optional requirements (e.g., 110 litres per person per day in England).

  • Renewable technologies (solar PV, solar thermal, heat pumps) have output profiles that must be matched to demand.

  • Commissioning and building log books support the performance gap between design and as-built operation.

Quick reference

Repair, Maintenance and Refurbishment (Supplementary)

  • Repair specification should state materials, methods, workmanship standards, and acceptance criteria.

  • Structural strengthening options include section enlargement, fibre-reinforced polymer, and external post-tensioning.

  • Underpinning methods include mass concrete, mini-piled, and beam-and-pile; selection depends on ground conditions and load.

  • Damp-proofing repairs include injection DPC, electro-osmosis, and drainage; each has limitations and should follow diagnosis.

  • Timber repair uses splicing, resin repairs, or replacement; structural timber repairs require design.

  • Refurbishment surveys should identify hazardous materials, structural condition, and services before design freeze.

  • Maintenance plans should include cyclical tasks (e.g., gutter clearing, roof inspections) with defined frequencies.

  • Temporary works (e.g., propping, scaffolding) require design and checking before loading.

Quick reference

Contract Administration and Project Management (Supplementary)

  • Contract documents should define scope, price, time, risk allocation, and dispute resolution.

  • Notices and time bars are strict; failure to give notice can extinguish entitlement.

  • Interim valuations should reflect work executed and materials on site, subject to the contract's measurement rules.

  • Claims for extension of time require contemporaneous records and a causal link to the relevant event.

  • Dispute resolution options include adjudication (statutory right), mediation, arbitration, and litigation.

  • Adjudication decisions are binding until final determination; enforcement is through the courts.

  • Risk registers should identify, assess, and assign mitigation actions to risks.

  • Change control should capture scope, cost, and time impacts before authorising variations.

Quick reference

Professional Practice, Ethics and Health and Safety (Supplementary)

  • Conflicts of interest should be declared and managed; where they cannot be managed, the instruction should be declined.

  • Professional indemnity cover should be maintained at an adequate level and for the relevant period.

  • Health and safety risk assessments must be suitable and sufficient; they should be reviewed when circumstances change.

  • The CDM 2015 requires cooperation and coordination between duty holders, with a construction phase plan before work starts.

  • Asbestos, silica dust, and lead paint are common hazardous substances in refurbishment; controls include survey, extraction, and PPE.

  • Lone working, site access, and welfare facilities must be considered in method statements.

  • Whistleblowing and reporting of unsafe practices are part of professional duty.

  • Continuing professional development maintains competence and should be recorded.

Quick reference

Sustainability and Building Conservation (Supplementary)

  • Embodied carbon can be reduced by retaining structure, using low-carbon materials, and minimising waste.

  • Operational carbon depends on fabric performance, services efficiency, and occupant behaviour.

  • Life cycle assessment (LCA) stages (A1–A5, B, C, D) structure whole-life carbon reporting.

  • Retrofit of solid walls with internal insulation requires hygrothermal assessment to avoid condensation and decay.

  • Heritage significance assessment informs the acceptability of change; the greater the significance, the greater the justification required.

  • Reversibility and minimum intervention reduce the risk of irreversible harm to historic fabric.

  • Flood risk management includes avoidance, resistance, resilience, and insurance; the hierarchy should be applied in that order.

  • Biodiversity net gain and ecology assessments are increasingly required for planning applications.

Quick reference

Construction Technology and Materials (Supplementary 2)

  • Foundations are selected by ground conditions and load: strip, pad, raft, or piled.

  • Ground investigation informs foundation design; inadequate investigation is a common cause of later settlement.

  • Basements require waterproofing (tanking, drained cavity, or structural) and a defined waterproofing standard.

  • Roof structures (trussed rafters, traditional cut, or engineered) require bracing and restraint to resist wind uplift.

  • Cladding systems must accommodate movement and provide weathertightness and fire performance.

  • Fire compartmentation relies on continuity of fire-resisting construction at junctions and service penetrations.

  • Acoustic separation in timber frame requires mass, isolation, and sealing of junctions.

  • Services penetrations through fire-resisting elements must be fire-stopped to maintain compartmentation.

Quick reference

Inspection, Surveying and Condition Assessment (Supplementary 2)

  • Survey reports should distinguish between defects that are structural, weathertightness, or cosmetic.

  • Cost estimates in condition reports should be indicative and clearly labelled as such.

  • Access to concealed areas (roof voids, subfloors, cavities) should be recorded as inspected or not inspected.

  • Damp readings should be taken at consistent heights and locations to allow comparison.

  • Crack width should be measured, not estimated; crack width and pattern inform the diagnosis.

  • Monitoring of movement should record temperature and moisture conditions alongside readings.

  • Photographic evidence should include a scale and reference point.

  • Reports should recommend further investigation where the evidence is insufficient for a conclusion.

Quick reference

Legal and Regulatory Frameworks (Supplementary 2)

  • Building Regulations apply to building work, material changes of use, and certain energy efficiency improvements.

  • Competent person schemes allow self-certification of certain works without a building control application.

  • Planning conditions must be discharged; failure to do so can make development unlawful.

  • Conservation area consent and listed building consent are separate from planning permission.

  • The Party Wall etc. Act 1996 awards can deal with access, security, and compensation.

  • Fire safety duties include means of escape, fire detection, and compartmentation, assessed by fire risk assessment.

  • Health and safety law imposes duties on employers, self-employed persons, and those in control of premises.

  • Contractual terms cannot exclude liability for death or personal injury caused by negligence.

Quick reference

Building Services and Environmental Performance (Supplementary 2)

  • Fabric heat loss depends on U-values and areas; ventilation heat loss depends on air change rate and temperature difference.

  • Heating system sizing uses design heat loss plus a margin; oversizing reduces efficiency.

  • Controls (thermostats, TRVs, zoning) affect actual energy use and should match occupancy patterns.

  • Commissioning records and building log books support efficient operation.

  • Air quality and ventilation should be assessed together with energy performance.

  • Renewable heat incentives and metering requirements affect system design and reporting.

  • Water heating efficiency depends on cylinder insulation, distribution losses, and control strategy.

  • Overheating mitigation includes shading, ventilation, and reducing internal gains.

Quick reference

Repair, Maintenance and Refurbishment (Supplementary 2)

  • Repair specifications should include performance requirements and verification methods.

  • Repair of historic fabric should use compatible materials and traditional techniques.

  • Damp repair should follow diagnosis; injection DPC is not a universal solution.

  • Structural repairs require design, checking, and monitoring.

  • Refurbishment should consider temporary works, access, and phasing.

  • Maintenance should be planned and recorded to demonstrate compliance and support future decisions.

  • Repair costs should be estimated with allowances for unknowns and access.

  • Repair works should be inspected and signed off against the specification.

Quick reference

Contract Administration and Project Management (Supplementary 2)

  • Contract selection should match the project's risk profile and procurement route.

  • Payment terms must comply with statutory requirements, including notices and periods.

  • Variations should be instructed and valued under the contract.

  • Delay analysis should be evidence-based and contemporaneous.

  • Claims require proof of loss and causation.

  • Completion and defects periods should be defined and administered.

  • Retention and bonds manage performance risk.

  • Programme and risk management should be integrated and reviewed regularly.

Quick reference

Professional Practice, Ethics and Health and Safety (Supplementary 2)

  • Competence should be maintained and demonstrated through CPD and records.

  • Conflicts of interest should be declared and managed or the instruction declined.

  • Professional indemnity insurance should be adequate and maintained.

  • Risk assessments should be suitable and sufficient and reviewed.

  • CDM 2015 duties require cooperation and coordination.

  • Hazardous substances in refurbishment require survey and controls.

  • Lone working and site access should be risk assessed.

  • Unsafe practices should be reported.

Quick reference

Sustainability and Building Conservation (Supplementary 2)

  • Whole-life carbon should inform retrofit and new build decisions.

  • The energy hierarchy is fabric first, then services, then supply, then renewables.

  • Retrofit of solid walls requires breathable, vapour-open insulation.

  • Heritage significance assessment informs acceptable change.

  • Minimum intervention and reversibility guide conservation repairs.

  • Adaptive reuse usually lowers embodied carbon.

  • BREEAM and similar schemes assess environmental performance.

  • Flood resilience should be proportionate to assessed risk.

Quick reference

Building Pathology and Defects (Supplementary 2)

  • Dampness classification guides diagnosis and repair.

  • Condensation depends on dew point and surface temperature.

  • Hygroscopic salts draw moisture at high relative humidity.

  • Thermal bridging lowers surface temperature and raises heat loss.

  • Sulfate attack requires sulfate source and moisture.

  • Carbonation depassivates steel and initiates corrosion.

  • Differential movement causes cracking at openings and corners.

  • Frost damage requires saturation and freeze-thaw cycles.

Quick reference

Construction Technology and Materials (Supplementary 3)

  • Loadbearing masonry relies on mass and thickness.

  • Timber strength is graded; moisture above 20% risks decay.

  • Concrete strength is defined at 28 days.

  • Steel loses strength at elevated temperature.

  • Cavity ties should be corrosion resistant.

  • DPC and DPM must be continuous.

  • Engineered timber allows long spans but needs protection.

  • Roof ventilation must match construction type.

Quick reference

Inspection, Surveying and Condition Assessment (Supplementary 3)

  • Survey levels range from brief to full building survey.

  • Moisture meters give relative readings requiring calibration.

  • Thermal imaging detects temperature anomalies, not moisture directly.

  • Condition ratings should be consistent and recorded per element.

  • Measured surveys should state tolerance and datum.

  • Schedules of condition record baseline defects.

  • Endoscopes allow non-destructive inspection of cavities.

  • Sampling results apply only to sampled locations.

Quick reference

Legal and Regulatory Frameworks (Supplementary 3)

  • Building Regulations approval routes are full plans or building notice.

  • The Party Wall etc. Act 1996 covers party structures, excavations, and boundary walls.

  • Planning permission and listed building consent are separate.

  • CDM 2015 imposes duties on clients, designers, and contractors.

  • The Regulatory Reform (Fire Safety) Order 2005 requires a fire risk assessment.

  • Asbestos regulations require surveys before work.

  • The Defective Premises Act 1972 imposes a duty of care for dwellings.

  • Approved Document M governs accessibility.

Quick reference

Building Services and Environmental Performance (Supplementary 3)

  • U-values measure fabric heat loss.

  • SAP and SBEM are compliance tools.

  • Approved Document F sets ventilation rates.

  • Air permeability is measured by pressure test.

  • Glaser method assesses interstitial condensation.

  • Heat pumps and MVHR must be sized to demand.

  • Legionella control requires temperature control.

  • Approved Document E regulates acoustic performance.

Quick reference

Repair, Maintenance and Refurbishment (Supplementary 3)

  • Repair strategy balances cost, durability, and reversibility.

  • Re-pointing mortar should be weaker than the masonry.

  • Lime-based mixes are more compatible with traditional masonry.

  • Electrochemical repair options require specialist design.

  • Structural repairs require design and monitoring.

  • Maintenance is reactive, planned, or cyclical.

  • Refurbishment sequencing addresses structure and weathertightness first.

  • Asbestos refurbishment surveys are required before works.

Quick reference

Contract Administration and Project Management (Supplementary 3)

  • Standard forms allocate risk differently.

  • Payment notices and pay less notices are statutory requirements.

  • Variations must be instructed in writing.

  • Extensions of time are assessed against relevant events.

  • Loss and expense requires proof of loss.

  • Practical completion triggers the defects period.

  • Retention is typically 5% reduced to 2.5%.

  • Critical path analysis informs delay entitlement.

Quick reference

Professional Practice, Ethics and Health and Safety (Supplementary 3)

  • Conflicts of interest must be disclosed and managed.

  • Professional bodies publish ethical standards.

  • Professional indemnity insurance covers negligent acts.

  • CDM 2015 requires risk elimination first.

  • Risk assessments must be recorded for significant risks.

  • Work at height and confined spaces require specific controls.

  • Health and safety files must be handed over.

  • Data protection applies to client information.

Quick reference

Sustainability and Building Conservation (Supplementary 3)

  • Whole-life carbon includes embodied and operational carbon.

  • Energy hierarchy is fabric first.

  • Solid-wall retrofit requires vapour-open insulation.

  • Significance assessment informs heritage impact.

  • Minimum intervention and reversibility guide conservation.

  • Adaptive reuse lowers embodied carbon.

  • BREEAM assesses environmental performance.

  • Flood resilience should be proportionate to risk.