AM2 / AM2S · Give each week a clear focus.

8 weeks · About 8 hours per week

Week 1

Safe Isolation and Risk Assessment

  • Define the five steps of risk assessment and apply them in writing to three AM2-style tasks: a consumer unit change, isolation of a three-phase motor circuit, and work in a live adjacent panel.

  • Perform the complete safe isolation sequence on single-phase and three-phase boards from memory, covering identification of the point of isolation, lock-off and tagging, proving the voltage indicator on a known source, proving dead on all conductors, and re-proving the indicator.

  • Select and justify the correct voltage indicator, proving unit, locking device and PPE for each stage of the assessment.

  • State the EAWR limits on live working and describe when a permit-to-work or formal authorisation is required.

Your checkpoint

One written risk assessment for a chosen AM2 task plus an unassisted safe isolation demonstration scored against a 20-point checklist, achieving at least 18/20.

Week 2

Safe Isolation and Risk Assessment & Composite Installation

  • Produce a method statement and risk assessment for the full composite installation, ranking hazards and specifying a control for each.

  • Interpret an AM2-style specification and build a cable, accessory and protective-device schedule using BS 7671 Appendix 4 and tabulated current-carrying capacity.

  • Calculate design current, select the protective device rating, and verify disconnection times for a socket circuit, a lighting circuit and a motor circuit.

  • Set up a working area to assessment standard: isolation applied, signage in place, tools accounted for, housekeeping maintained.

Your checkpoint

A design pack for the composite installation containing the schedule, three sets of circuit calculations and the risk assessment, checked against reference answers with no more than two errors.

Week 3

Composite Installation

  • Install and terminate containment (steel conduit, PVC trunking, tray and basket) to a given route with correct support spacing, fixings and metallic earthing.

  • Wire and terminate the distribution board, accessories and motor circuit with correct conductor identification, CPC sizing and torque/termination quality.

  • Apply IP ratings, fire-rated support requirements and Section 522 external influence requirements at every point of the installation.

  • Complete the installation within a timed four-hour window with zero rework on any circuit.

Your checkpoint

A completed composite installation (or full simulated board) documented section by section and self-assessed against the AM2 marking criteria, with every defect listed alongside the corrective action.

Week 4

Composite Installation & Inspection, Testing and Certification

  • Verify the completed installation against the specification with a point-by-point pre-energisation checklist.

  • Carry out continuity of protective conductors, ring final circuit continuity (including r1, rn, r2 and cross-connection values) and insulation resistance on the rig in the correct sequence.

  • State the required sequence for initial verification and justify why each test precedes the next.

  • Record every result on the correct model certificate and schedule of test results, identifying where each value is entered.

Your checkpoint

A half-way mock: completed A1 and A2 written paper plus a 90-minute timed practical, scoring at least 70% overall with a written list of weak areas.

Week 5

Inspection, Testing and Certification

  • Measure earth fault loop impedance (Zs), prospective fault current and RCD operating times on the rig, then compare each result against the BS 7671 maximum permitted value.

  • Complete an Electrical Installation Certificate with a schedule of inspections and a schedule of test results, noting all departures.

  • Apply classification codes C1, C2, C3 and FI to ten given inspection scenarios and justify each decision in writing.

  • Conduct a periodic inspection of the rig and produce an EICR with observations, code and condition statement.

Your checkpoint

A fully completed EIC and EICR pack (schedules plus observations) for the rig, marked by a tutor or peer with at least 90% of classifications correct.

Week 6

Safe Isolation of Circuits

  • Write circuit-specific safe isolation procedures for five different circuits - ring final, three-phase motor, immersion heater, emergency lighting and a PV connection - identifying every source of supply including backfeeds and parallel paths.

  • Demonstrate safe isolation of a circuit fed from a distribution board, proving dead at the actual point of work and applying lock-off and warning notice.

  • Identify and control stored energy and hidden supplies (capacitors, batteries, generators, borrowed neutrals) in five given scenarios.

  • Explain the requirements of BS 7671 Regulation 537.2 and Part 6 for isolation and switching devices and their selection.

Your checkpoint

Five written isolation procedures plus two observed practical isolations, marked pass/fail with no critical safety errors.

Week 7

Fault Diagnosis and Rectification

  • Apply a logical fault-finding sequence (gather information, confirm the symptom, sectionalise, test, confirm the repair) to five documented fault scenarios.

  • Diagnose faults from insulation resistance, continuity, loop impedance and RCD test evidence using half-split and substitution techniques.

  • Locate and rectify three injected faults on the rig within 30 minutes each, recording cause, supporting test evidence and remedy.

  • Write a short technical report for each fault stating root cause and a preventative recommendation.

Your checkpoint

A fault log of three rectified faults completed under timed conditions, each with a correct diagnosis and no unnecessary damage to the installation.

Week 8

Assessment of Applied Knowledge (Health & Safety, BS 7671, Building Regulations) & Inspection, Testing and Certification & Fault Diagnosis and Rectification

  • Answer 100 mixed questions covering health and safety, BS 7671 and Building Regulations, scoring at least 80%, and review every incorrect answer.

  • Revise notifiable work under Part P, the Building Regulations that apply to electrical work, and CDM duties relevant to the assessment.

  • Sit a full timed mock covering all five sections, including the practical elements, under assessment conditions.

  • Compile a one-page personal error list from the mock and write a remediation action for each item.

Your checkpoint

A completed mock result sheet showing at least 70% in every section, plus a finished remediation plan with dated actions.

Milestones

Week 2: Safe isolation performed unaided with zero critical safety errors, and a signed-off risk assessment and installation design pack produced.

Week 4: Half-way mock passed at 70% or above across the A1 and A2 written and practical sections, with the composite installation built to specification.

Week 6: EIC and EICR pack completed with at least 90% of classification codes correct, and safe isolation demonstrated on two separate circuits without a critical error.

Week 8: Full mock scoring at least 70% in every section, at least 80% in the 100-question knowledge paper, and all three faults rectified within the time limit.