Quick reference

F-gas and ODS Regulations

  • UK F-gas controls cover HFCs, PFCs and SF6; ODS controls cover CFCs, HCFCs, halons and other ozone-depleting substances.

  • Category I certification permits work on all RAC equipment, including leak checking, charging, recovery, recycling and decommissioning.

  • CO2e = refrigerant charge (kg) × GWP ÷ 1,000; this value determines leak-check frequency and record thresholds.

  • Common GWPs: R-134a 1430, R-32 675, R-410A 2088, R-404A 3922, R-407C 1774; CO2 has GWP 1.

  • HCFC R-22 has ODP 0.055 and GWP 1810; virgin HCFC supply for refrigeration is phased out under ODS rules.

  • F-gas equipment must be labelled with refrigerant type, charge in kg and CO2e, and GWP; labels must remain legible and maintained.

  • Deliberate venting of F-gas or ODS is prohibited; recovered refrigerant must be recycled, reclaimed or destroyed by authorised routes.

  • Certified companies and personnel must be registered; records of certification and refrigerant transactions support compliance checks.

Quick reference

Legal Duties and Environmental Impact

  • The operator is legally responsible for leak prevention, periodic checks, record keeping, recovery and use of certified personnel.

  • F-gas leakage adds to global warming; ODS leakage also depletes stratospheric ozone and increases UV reaching the surface.

  • A 1 kg release of R-410A has a CO2e of about 2.09 tonnes; a 1 kg release of R-404A is about 3.92 tonnes.

  • Leakage lowers system efficiency and capacity, raising energy use and indirect CO2 emissions over the equipment life.

  • Records must be kept for at least five years and produced to an enforcement officer on request.

  • Only competent, certified persons may install, service, leak check or recover controlled refrigerants; company certification is separate from personal certification.

  • Penalties for breaches include improvement notices, prohibition notices, fines and prosecution under environmental and F-gas legislation.

  • Environmental harm from ODS includes ozone depletion; from F-gases includes long atmospheric lifetime and high GWP.

Quick reference

Refrigerant Safety

  • ASHRAE safety groups: A1 lower toxicity/no flame propagation; A2L lower flammability; A3 higher flammability; B classes higher toxicity.

  • R-32, R-454B and R-1234yf are A2L; R-290 (propane) and R-600a (isobutane) are A3; R-410A and R-134a are A1.

  • Refrigerant vapour is denser than air and can accumulate in pits, basements and plant rooms, displacing oxygen.

  • Liquid refrigerant at atmospheric pressure boils near -30 to -50 °C and causes frostbite on contact with skin or eyes.

  • Refrigerant exposed to flames or high temperature can decompose to hydrogen fluoride, carbonyl fluoride and other toxic products.

  • Oxygen-free nitrogen is the only acceptable pressure-test gas for RAC systems; oxygen and air can form explosive mixtures with oil.

  • Never mix refrigerants; mixed refrigerant cannot be returned to original specification and may produce unexpected pressures and temperatures.

  • A refrigerant leak in a confined space requires evacuation, ventilation and appropriate respiratory protection before entry.

Quick reference

Cylinder Handling, PPE and Risk Assessment

  • Recovery cylinders must be approved for the refrigerant, within test date, undamaged and fitted with correct valve and dip tube.

  • Cylinder fill limit is by weight and commonly 80% of water capacity; overfilling can cause hydraulic rupture or relief-valve release.

  • Cylinders are stored upright, secured, valve-protected, away from heat, ignition sources and direct sunlight.

  • Cylinder colour codes and UN labels identify contents; never rely on colour alone-check the valve label and markings.

  • PPE selection follows risk assessment: safety glasses, chemical gloves, safety footwear, and flame-retardant or respiratory protection where required.

  • Risk assessment hierarchy: eliminate exposure, substitute safer refrigerant, engineer controls, adopt safe system of work, then PPE.

  • Cylinder transport requires valve caps, restraint, ventilation and segregation from oxidisers and flammable gases.

  • A cylinder that has been heated or damaged must be treated as hazardous and isolated; do not attempt to move it if pressure is rising.

Quick reference

Leak Checking, Containment, Record Keeping and Reporting

  • CO2e thresholds: 5–50 t check every 12 months; 50–500 t every 6 months; ≥500 t every 3 months.

  • Hermetically sealed equipment below 10 t CO2e is exempt from periodic leak checks but still subject to leak prevention and record duties.

  • A verified automatic leak detection system halves the required check frequency for the 50–500 t and ≥500 t bands.

  • Leak detection systems must be verified at least every 12 months and records of verification retained.

  • Records include equipment ID, refrigerant, charge, CO2e, check date, findings, repairs, technician and leak-detection verification.

  • Leaks must be repaired as soon as practicable; repaired areas require follow-up checks and records.

  • Containment measures include minimising joints, protecting pipework, controlling vibration, using correct materials and avoiding unnecessary charge.

  • Reporting obligations include records of refrigerant purchases, recovery, recycling, reclamation and destruction, retained for five years.

Quick reference

Installation, Commissioning, Pressure Testing and Evacuation

  • Installation must follow manufacturer instructions, EN 378 principles and applicable building, electrical and refrigerant safety standards.

  • Pressure testing uses oxygen-free nitrogen with a regulated source; test pressure must not exceed component or system design limits.

  • Pressure tests are increased in stages and held at each stage; test pressure, duration, gas and result are recorded.

  • Never use oxygen, compressed air or refrigerant to pressure test; oil and oxygen can ignite.

  • Triple evacuation uses nitrogen breaks between vacuum stages to remove moisture and non-condensables.

  • Final vacuum is commonly 500 microns (0.67 mbar) or manufacturer's specification; a standing vacuum test confirms no rise.

  • Charge refrigerant by weight using a calibrated scale; record actual charge and adjust superheat/subcooling to commissioning data.

  • Commissioning checks include electrical safety, rotation, controls, safety devices, leak test, insulation and documentation.

Quick reference

Servicing, Maintenance, Recovery, Recycling and Decommissioning

  • Service work begins with system identification, refrigerant check, risk assessment, isolation and recovery of refrigerant where required.

  • Recovery removes refrigerant; recycling cleans it on site; reclamation reprocesses to specification with laboratory analysis.

  • Recovery cylinders must be labelled with refrigerant, owner, date and gross/tare weights; mixed refrigerants are labelled as mixtures.

  • Recovered refrigerant must not be vented; it is recycled, reclaimed, destroyed or returned to an authorised processor.

  • Before brazing, recover refrigerant and purge with nitrogen; refrigerant or oil exposed to flame forms toxic decomposition products.

  • Decommissioning includes recovery of all refrigerant, recording quantity, disconnecting, labelling, removing components and authorised disposal.

  • Compressor oil may contain dissolved refrigerant; do not drain or open until pressure is released and refrigerant recovered.

  • After servicing, leak test, evacuate, recharge by weight, record work and verify safety controls before return to service.