Health, safety and regulatory requirements for small scale solar PV

  • PV modules generate DC voltage whenever light falls on them; the DC side remains live when the AC isolator is open and must be treated as live.

  • BS 7671 treats PV as a special installation; all AC and DC work must comply with the current edition and relevant building regulations.

  • G98: generation up to 16 A per phase (3.68 kW single-phase) may be installed and notified to the DNO within 28 days; G99 requires prior application for larger systems.

  • DC isolators and protective devices must be DC-rated for system maximum Voc and Isc; AC-rated devices must not be used on PV DC circuits.

  • In England and Wales, Part P applies to electrical work in dwellings; notifiable work must be certified by a registered competent person or building control.

  • Work at height follows the hierarchy: avoid, prevent (edge protection or scaffold), then mitigate (harness, fall arrest); roof fragility and asbestos must be assessed.

  • RIDDOR requires reporting of dangerous electrical incidents and certain injuries; maintain emergency procedures for DC arc hazards.

Quick reference

Site survey, system design and component selection

  • String maximum Voc is calculated at the lowest expected cell temperature using the module Voc temperature coefficient; it must not exceed inverter maximum DC input or module maximum system voltage.

  • String Vmp at the highest expected cell temperature must remain above the inverter MPPT minimum; otherwise the inverter cannot track maximum power.

  • In the UK, a south-facing array at 30–40° tilt gives near-optimal annual yield; east/west orientations reduce yield and shift generation to morning and evening.

  • PV arrays typically add 10–20 kg/m²; roof structure, rafters and fixings must be checked for dead load plus wind and snow loading.

  • DC cable voltage drop should typically be kept below 1% and AC voltage drop below 3–5% to limit energy loss and maintain inverter input voltage.

  • Inverter DC:AC ratio is array peak DC power divided by inverter AC rating; typical UK ratios are 1.1–1.3, trading clipping against yield.

  • Shading analysis should quantify shade across the year; persistent shade requires module-level optimisers, micro-inverters or array relocation.

  • Cable current-carrying capacity must be corrected for ambient temperature, grouping and installation method; Isc and continuous current must be considered.

Quick reference

Installation of solar PV modules, mounting systems and cabling

  • Module clamps must sit within the manufacturer's specified clamp zones, commonly 1/4 and 3/4 along the frame, and be torqued to the stated value.

  • Roof hooks and brackets should be fixed into rafters or trusses, not tile battens, using stainless steel fixings sized for wind uplift.

  • PV DC cable must be double-insulated, UV-resistant and rated at least 1000 V DC (often 1500 V DC), with current rating at least 1.25 × Isc.

  • Only connectors of the same manufacturer and type should be mated; use the correct crimp tool and verify pull-out strength to avoid overheating.

  • Series connection adds module voltages while current remains constant; parallel connection adds currents while voltage remains constant.

  • Every roof penetration must be sealed with a compatible flashing or sealant; leave a ventilation gap behind modules to limit overheating.

  • DC and AC circuits should be segregated; DC cable must be supported, protected from sharp edges and not installed in AC-only conduit without separation.

Quick reference

Connection to consumer units, inverters and electrical distribution

  • A lockable AC isolator must be installed adjacent to the inverter; a DC isolator is required at the array and/or inverter as specified by design.

  • The inverter AC circuit may require a Type A or Type B RCD depending on the inverter's DC residual current characteristics; follow manufacturer instructions and BS 7671.

  • The inverter must have anti-islanding protection and disconnect from the grid on loss of supply; this is verified during commissioning.

  • The inverter should be connected via a dedicated MCB or RCBO in the consumer unit, rated to the inverter maximum AC output current and cable capacity.

  • An export limitation current transformer clamp on the incoming supply measures export; the inverter or limiter reduces output to the DNO-approved limit.

  • A dual supply warning label must be fixed at the consumer unit and meter position to warn that the installation is energised by PV as well as the grid.

  • On TT systems the inverter AC circuit requires RCD protection, typically 30 mA, and main protective bonding must be verified.

Quick reference

Commissioning, testing, fault finding and maintenance

  • Before connection, measure DC insulation resistance of each string to earth; values below 1 MΩ indicate a fault requiring investigation.

  • String open-circuit voltage is compared with expected Voc corrected for cell temperature and irradiance; zero or low voltage indicates open circuit, reverse polarity or failed module.

  • An I-V curve tracer compares actual array performance with the expected curve and can reveal shading, soiling, mismatch or failed bypass diodes.

  • Thermal imaging detects hot spots, faulty bypass diodes, loose connections and cell damage during commissioning and maintenance.

  • RCD trip tests verify trip time and current meet BS 7671; functional tests confirm anti-islanding, export limitation and monitoring.

  • Annual maintenance includes visual inspection, connector torque checks, DC insulation resistance, inverter error log review, cleaning and label checks.

  • Earth faults are located by isolating strings and testing insulation resistance to earth; the faulty string shows low resistance.