C&G 2922-34 Solar PV study materials
C&G 2922-34 Solar PV study resources

C&G 2922-34 Solar PV study plan

C&G 2922-34 Solar PV · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Health, safety and regulatory requirements for small scale solar PV

  • Outline the statutory and regulatory framework that governs small-scale solar PV work, naming the roles of the enforcing authorities and the place of BS 7671, building regulations and industry installation standards

  • Explain why a PV array cannot be proven dead from the AC isolator, and apply the full safe isolation sequence including DC string isolation, proving dead and lock-off

  • Identify the principal hazards of domestic PV work - falls from height, fragile roof surfaces, manual handling, asbestos-containing materials, arc flash and live DC working - and select control measures using the hierarchy of risk control

  • Specify the warning notices, labels and schematic documentation a completed PV installation must carry and state where each is fixed

Your checkpoint

A one-page risk assessment and method statement for a 12-module pitched-roof domestic install, with every identified hazard mapped to at least one control measure

Week 2

Health, safety and regulatory requirements for small scale solar PV & Site survey, system design and component selection

  • Describe emergency procedures and first-aid considerations specific to DC arcs, electric shock and roof rescue

  • Summarise the DNO connection application process and list the technical information a DNO requires before energising a grid-connected PV system

  • Build a desk-based site survey checklist covering roof covering and condition, orientation, pitch, shading, cable route, earthing arrangement, meter position and consumer unit spare capacity

  • Calculate usable roof area and maximum module count from given roof dimensions, module dimensions and required maintenance/clearance gaps

Your checkpoint

A completed site survey record for a described two-storey property, with a dimensioned roof sketch showing module layout and a stated maximum array size

Week 3

Site survey, system design and component selection

  • Perform string sizing calculations: check cold-condition open-circuit voltage against inverter maximum DC input and the MPPT window, and check short-circuit current against inverter limits

  • Select an inverter, DC and AC isolators, array and AC protective devices and cable sizes, justifying each choice on current-carrying capacity, voltage drop, derating and environment

  • Evaluate a described shading scenario and justify a chosen mitigation such as layout adjustment, module-level electronics or string configuration

  • Explain the structural loading and weatherproofing requirements for on-roof, in-roof and flat-roof mounting systems

Your checkpoint

A design pack for a 4 kWp system: string calculation table, component schedule with justification notes, and a shaded-elevation layout

Week 4

Installation of solar PV modules, mounting systems and cabling

  • Plan safe roof access, edge protection and fall-arrest arrangements, and sequence the work to minimise time spent at height

  • Describe fixing and weatherproofing methods for on-roof, in-roof and flat-roof systems and state the inspection points that decide whether a fixing is acceptable

  • Install modules to manufacturer-specified torque and clamping zones and verify string polarity and connector engagement before energising

  • Plan DC cable routing using appropriately rated or mechanically protected cable, with support spacing, fire considerations and separation from other services

Your checkpoint

A step-by-step installation method statement for the roof and DC side, containing a signed-off quality-assurance checkpoint list of at least 10 inspection points

Week 5

Installation of solar PV modules, mounting systems and cabling & Connection to consumer units, inverters and electrical distribution

  • Test completed DC strings before connection - open-circuit voltage, polarity and insulation resistance to earth - and interpret the readings against expected values

  • Describe array junction/combiner practice and state where DC isolation and switching devices are located and why

  • Explain inverter siting requirements including ventilation, clearances, ambient temperature and accessibility for maintenance

  • Detail the earthing and equipotential bonding arrangements for array frames, mounting structure and inverter in line with BS 7671 requirements

Your checkpoint

A labelled single-line diagram of the DC and AC sides showing every protective device, isolator, earthing point and label location, marked against a self-written checklist

Week 6

Connection to consumer units, inverters and electrical distribution

  • Explain consumer unit integration: selection of spare ways, RCD/RCBO type and rating, busbar and enclosure rating, and the load/diversity assessment behind the connection decision

  • Describe how anti-islanding and grid protection functions are provided and verified on a grid-tied inverter

  • List the dual-supply warning labels, schematics and handover documents required at completion

  • Carry out the notification and handover steps required by the DNO, building control and the customer

Your checkpoint

A completed connection and notification checklist for a mock installation, plus three worked calculations on protective device selection and volt drop

Week 7

Commissioning, testing, fault finding and maintenance

  • Sequence a full commissioning test schedule from protective conductor continuity through insulation resistance, earth electrode resistance, RCD operation, string open-circuit and short-circuit measurement, irradiance recording and functional checks

  • Interpret recorded results against expected values and identify the cause of high-resistance joints, reversed polarity, string mismatch, earth faults and underperformance

  • Diagnose five fault scenarios from reported symptoms and state the test that confirms each diagnosis

  • Set out a maintenance and monitoring regime including visual inspection intervals, thermal imaging, connector checks and performance-ratio review

Your checkpoint

A completed commissioning schedule with recorded results for a described mock system, plus a fault log diagnosing five scenarios with the confirming test for each

Week 8

Health, safety and regulatory requirements for small scale solar PV & Site survey, system design and component selection & Installation of solar PV modules, mounting systems and cabling & Connection to consumer units, inverters and electrical distribution & Commissioning, testing, fault finding and maintenance

  • Complete two full timed mock papers covering all five domains under exam conditions

  • Re-work the two weakest domains identified by mock-paper feedback, answering past-style questions until consistently correct

  • Recall from memory the key figures and relationships: voltage-drop limits, temperature coefficients, isolation and switching requirements, labelling set and test-sequence order

  • Review the error log and confirm each corrected misconception can be explained aloud without notes

Your checkpoint

Two timed mock papers scored at 80% or above, with an error log listing every incorrect answer, the correct reasoning and the domain it belongs to

Milestones

Week 2: Explain the full safe isolation and DC live-working precautions from memory in under five minutes, and produce a site survey record a colleague could work from without asking questions

Week 4: Score at least 80% on a closed-book 25-question test covering domains 1 to 3, including at least three string-sizing calculations answered correctly

Week 6: Score at least 80% on a 20-question test on domain 4 and have the single-line diagram pass every item on the self-written checklist unaided

Week 8: Score 80% or above on both timed mock papers, with no domain scoring below 65% and no repeated error type remaining in the error log