AACE CST · Get comfortable with the vocabulary.

Work Breakdown Structure (WBS)

A hierarchical breakdown of the total scope of work into manageable, deliverable-oriented components. It provides the framework for defining activities, assigning responsibility, and rolling up cost and schedule information for reporting.

Related: Activity, Baseline Schedule
Activity

A discrete, identifiable unit of work performed during a project that has a defined start, finish, duration, and resource requirements. Activities form the building blocks of a schedule network and are progress measured.

Related: Work Breakdown Structure (WBS), Duration, Logical Relationship
Critical Path

The longest continuous sequence of dependent activities through a network, determining the shortest possible project duration. Activities on this path have zero or minimum total float and drive the project completion date.

Related: Total Float, CPM
Total Float

The amount of time an activity can be delayed from its early start without delaying the project finish date or a constrained milestone. It equals late finish minus early finish, or late start minus early start.

Related: Critical Path, Free Float
Free Float

The time an activity can slip without delaying the early start of any immediate successor. It is the difference between the successor's early start and the activity's early finish, minus any lag.

Related: Total Float
Logical Relationship

A dependency connecting two activities that defines the sequence in which they can be performed. Relationships may be mandatory, discretionary, or external and are expressed as finish-to-start, start-to-start, and similar types.

Related: Finish-to-Start, Lag
Finish-to-Start

A logical relationship in which a successor activity cannot begin until its predecessor finishes. It is the most common dependency type in construction and engineering schedules and may include a lag.

Related: Logical Relationship, Lag
Lag

A planned, positive waiting period inserted between the finish of a predecessor and the start of its successor, or between other relationship points. Lag models real constraints such as curing time or approval delays.

Related: Lead, Finish-to-Start
Lead

A negative lag that allows a successor activity to begin before its predecessor finishes or advances the relationship by a specified time. Leads should be used sparingly because they can obscure true dependencies.

Related: Lag
Milestone

A schedule event with zero duration marking a significant point, such as completion of a phase, contractual delivery, or a key decision. Milestones are used for high-level tracking and executive reporting.

Related: Activity, Baseline Schedule
Duration

The total number of work periods, usually expressed in days or weeks, required to complete an activity from start to finish. Duration excludes nonworking time and depends on resources, productivity, and calendar.

Related: Calendar, Activity
Calendar

A defined set of working and nonworking days and hours used to schedule activities. Project and resource calendars determine when work can occur and directly affect calculated dates and durations.

Related: Duration
Baseline Schedule

An approved, time-phased plan of activities and milestones used as the reference for measuring progress and performance. Changes to the baseline require formal change control and are typically versioned.

Related: Schedule Update, Schedule Variance (SV)
Data Date

The point in time at which schedule status is recorded and progress is measured, also called the status date. Work performed after the data date is considered future work in the update.

Related: Schedule Update, Percent Complete
Schedule Update

A periodic revision of the project schedule that incorporates actual progress, revised durations, logic changes, and remaining work as of the data date. Updates produce a current forecast while preserving the baseline for comparison.

Related: Data Date, Baseline Schedule
Percent Complete

A measure of work accomplished on an activity or project, expressed as a proportion of the total planned scope. It may be based on duration, physical quantities, or earned value, depending on the measurement method.

Related: Earned Value (EV), Schedule Update
Schedule Variance (SV)

The difference between earned value and planned value, showing whether schedule work is ahead of or behind plan in cost terms. A negative value indicates less work was accomplished than planned.

Related: Earned Value (EV), Schedule Performance Index (SPI)
Schedule Performance Index (SPI)

A ratio of earned value to planned value that measures schedule efficiency. Values below one indicate work is progressing slower than planned; values above one indicate faster-than-planned progress.

Related: Schedule Variance (SV), Earned Value (EV)
Earned Value Management (EVM)

A project control technique that integrates scope, schedule, and cost by comparing planned value, earned value, and actual cost. It provides objective indicators of performance and forecasts likely outcomes.

Related: Planned Value (PV), Earned Value (EV)
Planned Value (PV)

The authorized budget assigned to scheduled work for a given period. It represents what the project should have earned by a specific point in time according to the baseline.

Related: Earned Value (EV), Budget at Completion (BAC)
Earned Value (EV)

The value of work actually performed, measured against the approved budget for that work. It converts physical progress into a cost figure and serves as the basis for performance metrics.

Related: Planned Value (PV), Actual Cost (AC)
Actual Cost (AC)

The total cost incurred for work performed during a given period. It includes direct and indirect costs and is compared with earned value to assess cost performance.

Related: Earned Value (EV)
Budget at Completion (BAC)

The sum of all authorized budgets for the project scope, representing the total planned cost baseline. BAC is used as the denominator for cost and schedule performance indices and as a reference for forecasts.

Related: Estimate at Completion (EAC), Planned Value (PV)
Estimate at Completion (EAC)

A forecast of the total cost expected to complete all project work, based on actual performance and remaining work. Common formulas divide budget at completion by cost performance index or add estimates to complete.

Related: Budget at Completion (BAC)
Resource Leveling

A scheduling technique that adjusts activity start and finish dates to resolve resource over-allocation or shortages. It may extend the project duration and often changes the critical path and float values.

Related: Resource Smoothing, Critical Path
Resource Smoothing

A technique that shifts activities within their available float to reduce resource demand peaks without extending the project completion date. Unlike leveling, it cannot delay the critical path.

Related: Resource Leveling, Total Float
Constraint

A restriction placed on an activity's start or finish date, such as start-no-earlier-than or finish-no-later-than. Constraints override network logic and can consume float or alter the critical path.

Related: Critical Path, Total Float
CPM

A scheduling method that calculates early and late dates for activities by analyzing network logic and durations. It identifies the critical path and float, enabling systematic planning and control of project time.

Related: Critical Path, Schedule Network Diagram
Schedule Network Diagram

A graphical representation of activities and their logical relationships, showing the sequence of work and dependencies. It is used to visualize the schedule, trace paths, and identify the critical path.

Related: Logical Relationship, CPM
Three-Point Estimating

An estimating technique that uses optimistic, most likely, and pessimistic durations to calculate an expected value and range. It helps account for uncertainty in activity durations and supports schedule risk analysis.

Related: Duration, Schedule Risk Analysis
Rolling Wave Planning

A progressive planning approach in which near-term work is detailed while future work is planned at a higher level. As the project advances, detailed schedules are developed for upcoming phases.

Related: Work Breakdown Structure (WBS), Activity
Schedule Risk Analysis

A quantitative or qualitative process that assesses how uncertainties and risks may affect schedule durations and completion dates. Techniques include Monte Carlo simulation, sensitivity analysis, and contingency determination.

Related: Three-Point Estimating, Critical Path
Schedule Compression

A technique used to shorten the project schedule without reducing scope, typically through crashing or fast tracking. It is applied when deadlines are at risk and often increases cost or risk.

Related: Crashing, Fast Tracking
Crashing

A schedule compression technique that shortens activity durations by adding resources or working overtime, usually increasing cost. It targets critical path activities and requires analysis of cost versus time savings.

Related: Fast Tracking, Critical Path
Fast Tracking

A compression technique that overlaps activities normally performed in sequence, such as starting design before construction finishes. It can shorten duration but increases risk and rework potential.

Related: Crashing
Baseline Change Control

A formal process for reviewing, approving, and documenting modifications to the approved baseline schedule or budget. It ensures changes are justified, traceable, and communicated to stakeholders.

Related: Baseline Schedule
Progress Reporting

The periodic communication of schedule status, accomplishments, variances, and forecasts to stakeholders. Reports typically compare actual progress against the baseline and highlight issues requiring management attention.

Related: Schedule Update, Schedule Variance (SV)
Key Performance Indicator (KPI)

A measurable value that shows how effectively a project is achieving key schedule or cost objectives. KPIs are tracked over time to support decisions and compare performance against targets.

Related: Schedule Performance Index (SPI), Progress Reporting