AACE PRMP · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Schedule Planning

  • Map the Schedule Planning domain task areas into a personal checklist of inputs, outputs, and review questions.

  • Draft a three-level work breakdown structure for a sample capital project with at least 15 work packages.

  • List the calendar, resource, constraint, and stakeholder assumptions that must be settled before schedule development.

  • Write a one-page schedule basis outline covering scope, assumptions, exclusions, and approval path.

Your checkpoint

A one-page WBS plus assumptions log for the sample project, with at least 15 work packages and five explicit planning assumptions.

Week 2

Schedule Planning & Schedule Development

  • Convert the week-1 WBS into an activity list with clear scope boundaries and duration estimates.

  • Construct a precedence diagram with at least 20 activities and logical relationships.

  • Classify each dependency as mandatory, discretionary, external, or internal, and record the rationale.

  • Test lag and lead usage on at least three relationships and note where each would be inappropriate.

Your checkpoint

An activity list and precedence diagram covering 20-plus activities, with a dependency rationale table for every relationship.

Week 3

Schedule Development

  • Calculate forward pass, backward pass, total float, free float, and critical path for a 25-activity network.

  • Build a resource-loaded version of the network and flag at least five overallocation points.

  • Apply project and resource calendars to the schedule and document the effect on dates and float.

  • Compare the CPM result with a simple critical-chain view and explain the practical difference in buffering.

Your checkpoint

A solved 25-activity network with a CPM table, critical path identified, float values reconciled, and a short memo explaining calendar and resource effects.

Week 4

Schedule Development & Schedule Maintenance and Control

  • Create a baseline schedule package from the developed network with a documented approval sign-off.

  • Design a progress update cycle covering data capture, actual start and finish dates, remaining duration, and update frequency.

  • Set up baseline-versus-actual tracking fields and define the thresholds that trigger schedule review.

  • Define a schedule change-control procedure with request, impact assessment, approval, and revision logging steps.

Your checkpoint

A baseline schedule package with 25-plus activities, a CPM validation check, and a one-page progress-update and change-control procedure.

Week 5

Schedule Maintenance and Control

  • Perform a progress update on the sample project using realistic actuals and recalculate the schedule.

  • Analyze at least five date or float variances and separate critical-path impacts from non-critical impacts.

  • Update the schedule risk log with triggers, owners, and response actions for the top five schedule risks.

  • Recommend and document corrective actions, including any re-sequencing or resource adjustment.

Your checkpoint

An updated schedule with a variance report covering five deviations, critical-path impact notes, and recovery actions with owners.

Week 6

Schedule Analysis

  • Run a schedule health check covering logic, constraints, lags, float, and missing predecessors or successors.

  • Analyze float distribution and identify activities whose critical-path status changed after the update.

  • Perform a what-if scenario that increases selected durations by 10 percent and quantify the completion impact.

  • Compare baseline and current schedule to attribute delay to scope, logic, resources, or external events.

Your checkpoint

A schedule analysis report with health metrics, a float histogram, five variance findings, and one quantified what-if scenario.

Week 7

Schedule Analysis & Schedule Communication and Reporting

  • Build an executive dashboard showing milestones, critical path, float trend, variance, and recovery status.

  • Write a plain-language schedule narrative for non-technical stakeholders, translating float and critical-path data into decisions.

  • Prepare a recovery recommendation with cost, resource, and schedule trade-offs stated explicitly.

  • Rehearse a five-minute status briefing and revise the message for clarity and brevity.

Your checkpoint

A two-page executive status report with dashboard mockup, narrative, recovery recommendation, and five-minute briefing notes.

Week 8

Schedule Communication and Reporting

  • Consolidate reporting templates into a reusable kit for status reports, dashboards, and change notices.

  • Complete a timed 60-question mixed review across all five domains and log every miss by domain and cause.

  • Rewrite weak-area notes into three one-page cheat sheets focused on calculation steps and reporting language.

  • Finalize an exam-day plan covering timing, review checkpoints, and a stop-doing list for low-yield habits.

Your checkpoint

A final review log showing at least 85 percent accuracy on the 60-question mixed set, with every miss categorized and three completed cheat sheets.

Milestones

Week 2: Submit the WBS, activity list, and precedence diagram for a 20-plus activity sample project; verify every dependency has a written rationale.

Week 4: Produce a baseline schedule with 25-plus activities and a CPM table in which forward pass, backward pass, total float, and critical path reconcile without unexplained gaps.

Week 6: Complete the schedule health review and show a float histogram, at least five variance findings, and one what-if scenario with quantified completion impact.

Week 7: Deliver a two-page executive status report and pass a five-minute mock briefing covering milestones, critical path, variance, and recovery actions.

Week 8: Score at least 85 percent on the 60-question mixed review and log every miss by domain and root cause.