Winter Concrete Pour and Cold Weather Provisions

AK General Contractor · Put your knowledge to work in context.

All case studies

Winter Concrete Pour and Cold Weather Provisions

A general contractor is preparing to place a 12-inch-thick reinforced concrete mat foundation for a commercial building in Anchorage, Alaska, in late November. The forecast predicts daytime highs of 25°F and nighttime lows of 5°F for the next week. The concrete supplier proposes using a mix with 500 lb/yd³ of Type III cement and a water-cement ratio of 0.45. The contractor plans to use insulated forms and blankets but has not yet developed a cold-weather concreting plan. The structural engineer requires a minimum compressive strength of 3,500 psi before form removal and 4,000 psi before loading. The project schedule allows 7 days for curing before form removal. The contractor must ensure the concrete meets strength requirements and avoids thermal cracking.

1. What cold-weather concreting measures should the contractor implement to ensure the concrete reaches the required strength and avoids thermal cracking?

Read the worked answer

The contractor must follow ACI 306.1 for cold weather concreting. Key measures include: 1) Ensure concrete temperature at placement is between 50°F and 70°F; use heated water and aggregates if necessary. 2) Protect concrete from freezing for at least the first 24 hours; maintain a minimum temperature of 50°F for 3 days or until strength reaches 500 psi. 3) Use insulated forms and blankets to maintain temperature; monitor temperature at surface and interior to ensure differential does not exceed 35°F to prevent thermal cracking. 4) Consider using Type III cement for early strength gain; the proposed mix with 500 lb/yd³ and w/c 0.45 is reasonable, but verify maturity. 5) Do not remove forms until concrete reaches 3,500 psi (per engineer). With 7 days of curing at 50°F, Type III cement may achieve about 70% of 28-day strength (approx. 3,500 psi if 28-day strength is 5,000 psi). The contractor should test cylinders cured under job conditions to confirm strength before form removal. 6) Avoid rapid cooling; gradually remove insulation to limit thermal shock. 7) Keep records of temperature and strength.

2. If the contractor wants to remove forms after 7 days, what strength must be achieved and how can they verify it?

Read the worked answer

The structural engineer requires a minimum compressive strength of 3,500 psi before form removal. To verify, the contractor should cast extra cylinders and cure them under the same conditions as the concrete (field-cured) and test them at 7 days. If field-cured cylinders do not reach 3,500 psi, forms cannot be removed. Alternatively, use maturity meters to estimate strength based on temperature history, but this requires prior calibration. The contractor should not rely solely on time; strength is the criterion. If strength is not achieved, extend curing time or provide supplemental heat.