AK General Contractor study materials
AK General Contractor study resources

AK General Contractor key terms

AK General Contractor · Get comfortable with the vocabulary.

Retainage

A percentage of each payment owed to a contractor that the owner withholds until the project is substantially or fully complete, protecting the owner against unfinished work or defects.

Related: Substantial Completion, Lien
Lien

A legal claim recorded against a property by a contractor, subcontractor, or supplier who has not been paid for labor or materials furnished to improve that property.

Related: Preliminary Notice, Retainage
Preliminary Notice

A written warning sent early in a project by a potential claimant to the owner and lender stating that unpaid labor or materials may result in a lien claim.

Related: Lien
Substantial Completion

The stage at which work is sufficiently finished that the owner can occupy or use the project for its intended purpose, triggering warranty periods and release of most retainage.

Related: Retainage, Punch List
Change Order

A written, signed modification to the contract that adjusts the scope, price, or schedule of work, binding only after the owner and contractor both approve it.

Related: Constructive Change, Request for Information
Constructive Change

An undocumented direction or action by the owner or its agent that effectively alters the work and may entitle the contractor to an equitable price or time adjustment even without a signed change order.

Related: Change Order
Request for Information

A formal written question from the contractor to the design team seeking clarification of drawings, specifications, or contract documents, with the answer recorded for all parties.

Related: Change Order, Liquidated Damages
Liquidated Damages

A predetermined sum stated in the contract that the contractor pays the owner for each day of late completion, intended to approximate actual losses rather than punish.

Related: Critical Path
Bid Bond

A surety guarantee that a bidder will enter the contract at the bid price and furnish required performance and payment bonds if awarded the work.

Related: Performance Bond, Payment Bond
Performance Bond

A surety instrument that guarantees the contractor will complete the work according to the contract terms, giving the owner a financial backstop if the contractor defaults.

Related: Bid Bond, Payment Bond
Payment Bond

A surety guarantee that protects the owner and unpaid subcontractors and suppliers by ensuring they are paid for labor and materials furnished on bonded work.

Related: Performance Bond, Lien
Addendum

A written modification to the bidding or contract documents issued before bids are opened, which becomes part of the documents and must be acknowledged in the bid.

Related: Request for Information
Unit Price

A fixed cost per measurable unit of work, such as per cubic yard of excavation, used when quantities are uncertain and final payment is based on measured amounts.

Related: Contingency
Contingency

A reserve of money or time set aside in an estimate or schedule to cover unforeseen conditions, scope growth, or risk without requiring new funding approval.

Related: Unit Price, Float
Critical Path

The longest chain of dependent activities through a schedule; any delay on this path directly delays the project completion date.

Related: Float, Liquidated Damages
Float

The amount of time an activity can be delayed without delaying the project completion date, often called slack and used to manage schedule risk.

Related: Critical Path
Look-Ahead Schedule

A short-interval plan, typically covering the next two to six weeks, that breaks down upcoming work into detailed tasks for coordination and resource planning.

Related: Critical Path
Punch List

A written inventory of minor incomplete or defective items identified near completion that the contractor must correct before final acceptance and final payment.

Related: Substantial Completion
Benchmark

A fixed reference point of known elevation or horizontal position from which site measurements and grade are established and checked during construction.

Related: Batter Boards, Cut and Fill
Batter Boards

Pairs of horizontal boards set outside the excavation corners at a known elevation, with strings stretched between them to mark foundation lines and grades.

Related: Benchmark
Cut and Fill

The process of removing soil from high areas (cut) and placing it in low areas (fill) to bring a site to the desired design grade economically.

Related: Benchmark, Compaction
Compaction

Mechanical densification of soil by rolling, tamping, or vibrating in layers to increase bearing strength and reduce future settlement under loads.

Related: Cut and Fill, Footing
Footing

The widened lower portion of a foundation that spreads building loads over a larger soil area to keep pressure within the soil's bearing capacity.

Related: Compaction, Rebar
Rebar

Steel reinforcing bars placed in concrete to carry tensile and shear stresses that concrete alone cannot resist, positioned per the structural drawings.

Related: Footing, Control Joint
Control Joint

A planned groove or weakened plane in concrete or masonry that forces cracking to occur at a chosen location instead of randomly across the surface.

Related: Rebar
Mortar Joint

The layer of mortar between masonry units that bonds them together and affects the wall's strength, water resistance, and appearance.

Related: Control Joint
Stud

A vertical framing member in a wall, typically wood or light-gauge steel spaced at regular intervals, that supports sheathing and transfers loads.

Related: Header, Sheathing
Header

A horizontal framing member placed over an opening such as a door or window to carry loads from above and transfer them to adjacent framing.

Related: Stud
Sheathing

The panel or board layer fastened over wall, roof, or floor framing that provides a nailing base, adds structural bracing, and forms a base for finishes.

Related: Stud, Underlayment
Underlayment

A material layer installed over the subfloor or roof deck and beneath the finished surface to provide a smooth base, moisture barrier, or cushion.

Related: Sheathing, Flashing
Flashing

Sheet metal or other material installed at roof edges, valleys, and penetrations to direct water away and prevent leaks at vulnerable joints.

Related: Underlayment, Vapor Barrier
Vapor Barrier

A low-permeability material that limits the movement of water vapor through an assembly, helping prevent condensation and moisture damage inside walls and roofs.

Related: Flashing
Rough-In

The first phase of mechanical, electrical, and plumbing work, installing pipes, ducts, and wiring inside walls and floors before finishes are applied.

Related: Cleanout
Cleanout

An accessible fitting or opening in a drain line that allows a plumber to remove blockages without demolishing finished walls or floors.

Related: Rough-In
Lockout/Tagout

A safety procedure that isolates energy sources and applies locks and tags so equipment cannot be energized or started while workers service it.

Related: Competent Person, Personal Protective Equipment
Competent Person

A worker designated by the employer who, through training and experience, is capable of identifying hazards and has authority to take prompt corrective action.

Related: Excavation Protective System, Lockout/Tagout
Excavation Protective System

Sloping, benching, shoring, or shielding used in trenches and excavations to protect workers from cave-ins and falling soil.

Related: Competent Person
Personal Protective Equipment

Gear such as hard hats, safety glasses, gloves, and fall protection worn by workers to reduce exposure to workplace hazards.

Related: Lockout/Tagout, Competent Person