AK General Contractor study materials
AK General Contractor study resources

AK General Contractor study plan

AK General Contractor · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Business and Financial Management & Contracting Law and Regulations

  • Explain how a contractor's chart of accounts separates direct job costs from overhead and general conditions

  • Compute break-even revenue and a target bid price from a given annual overhead figure, desired profit, and expected volume

  • Outline the lien and bond notice requirements that apply to a private commercial project in Alaska

  • Distinguish between a change order, a construction change directive, and a minor change in a typical contract

Your checkpoint

One-page cheat sheet listing the financial formulas and the statutory notice deadlines you must recall, with a worked break-even example.

Week 2

Contracting Law and Regulations & Business and Financial Management

  • Describe the contractor licensing and endorsement rules that apply to general contractors in Alaska

  • Identify the standard AIA contract families and what each document covers (owner-contractor, owner-architect, subcontract)

  • Summarize the payment and retainage provisions that govern progress payments on a typical commercial project

  • Calculate a retainage amount and the release timing for a given pay application

Your checkpoint

Completed 20-question self-quiz on contract law and financial management with a written explanation of every missed item.

Week 3

Estimating and Bidding & Project Management and Scheduling

  • Perform a quantity takeoff for concrete, formwork, and rebar from a set of plan dimensions

  • Build a bid summary that includes labor, material, equipment, subcontractor, overhead, and contingency line items

  • Convert a work breakdown structure into a network diagram and identify the critical path

  • Calculate float and explain how a delay to a critical-path activity affects the completion date

Your checkpoint

A complete sample bid package (takeoff, pricing, and bid summary) for a small commercial structure, plus a critical-path diagram for its schedule.

Week 4

Project Management and Scheduling & Site Work, Excavation, and Foundations

  • Prepare a short-interval look-ahead schedule and a resource-loaded labor histogram

  • Explain soil classification, bearing capacity, and the purpose of a geotechnical report

  • Describe excavation safety requirements, including sloping and shoring for trenches

  • Sequence foundation work from layout through backfill, including inspection hold points

Your checkpoint

A foundation-and-schedule package: a four-week look-ahead, a trench-safety plan, and a written sequence of operations for a spread-footing foundation.

Week 5

Concrete, Masonry, and Metals & Carpentry, Wood Framing, and Finish

  • Specify concrete mix design parameters (water-cement ratio, slump, air content) for given exposure conditions

  • Explain formwork removal timing and concrete curing requirements

  • Describe masonry wall ties, flashing, and weep-hole detailing at a cavity wall

  • Identify the structural steel bolting and welding inspection requirements for a typical connection

Your checkpoint

A detailing and inspection checklist covering concrete placement, masonry flashing, and steel connection inspection, with code references noted.

Week 6

Carpentry, Wood Framing, and Finish & Roofing, Thermal and Moisture Protection

  • Lay out a wood-frame floor and wall system, including stud spacing, headers, and sheathing nailing patterns

  • Explain roof underlayment, flashing, and ice-dam protection requirements for a cold-climate roof assembly

  • Describe the components of a building envelope and where the air, vapor, and water barriers belong

  • Compare steep-slope and low-slope roofing systems and their drainage requirements

Your checkpoint

A wall-and-roof assembly section drawing with every control layer labeled, plus a written justification for each layer's position.

Week 7

Roofing, Thermal and Moisture Protection & Mechanical, Electrical, and Plumbing Systems

  • Trace the path of a plumbing drain, waste, and vent system and identify required venting and trap-arm distances

  • Explain the purpose of a building's electrical service, panel schedule, and grounding and bonding system

  • Describe the basic components of an HVAC system and how duct sizing and equipment selection are determined

  • Identify the inspection and testing milestones required before systems are concealed

Your checkpoint

A one-page MEP coordination summary that lists the rough-in inspection sequence and the tests required before concealment.

Week 8

Safety, Environmental, and Occupational Requirements & Business and Financial Management & Contracting Law and Regulations

  • Apply the hierarchy of controls to a fall-protection and excavation scenario

  • Explain the employer's responsibilities under hazard communication, including SDS access and training

  • Describe erosion and sediment control and stormwater permit obligations on a construction site

  • Complete a timed mixed-domain practice exam and review every missed item

Your checkpoint

A final safety-and-environmental review sheet plus a scored 50-question practice exam with a written correction log for every missed question.

Milestones

Week 2: Score at least 80% on the 20-question contract and finance self-quiz, and correctly compute break-even and retainage without notes.

Week 4: Produce a complete sample bid package and a critical-path schedule that correctly identifies the driving path and total float.

Week 6: Explain every layer of the wall-and-roof assembly from memory and pass a 15-question detailing quiz at 80% or better.

Week 8: Score 80% or higher on the timed 50-question mixed practice exam and show a correction log covering every missed item.