AK General Contractor flashcards
AK General Contractor · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Working capital
- Current assets minus current liabilities. It measures whether a contractor can pay short-term obligations such as payroll and supplier invoices while waiting for progress payments.
- Retainage
- A percentage withheld from each progress payment until completion. It is a receivable asset to the contractor, not lost revenue, and is released per contract terms.
- Contribution margin ratio
- Revenue minus variable costs, divided by revenue. Dividing fixed overhead by this ratio yields the break-even revenue volume for the company.
- Underbilling
- The excess of earned revenue over billings to date. It represents cash the contractor has earned but not yet invoiced, tying up working capital.
- Substantial completion
- The stage when work is sufficiently complete for the owner's intended use. It typically starts warranty periods and can trigger retainage release.
- Mechanics lien
- A statutory claim against real property for unpaid labor or materials. It must be recorded within a statutory period and usually requires prior notice.
- Change order
- A written modification signed by the owner adjusting scope, price, or time. Work outside contract scope should not proceed without one.
- Differing site conditions
- A contract clause allowing price or time adjustment when actual site conditions differ materially from those shown or reasonably anticipated in the documents.
- Board foot
- A lumber volume unit equal to thickness in inches times width in inches times length in feet, divided by twelve, calculated per piece.
- Waste factor
- A percentage added to net takeoff quantities to cover cutting, breakage, and offcuts. Common allowances are five to ten percent for framing lumber.
- Unit price bid
- A bid where the stated price per unit governs payment regardless of estimated quantity. Used where quantities are uncertain.
- Crew production rate
- The quantity of work a crew installs per labor hour. Dividing takeoff quantity by this rate gives required labor hours for the cost estimate.
- Critical path
- The longest duration sequence of dependent activities through a schedule network. Its total float is zero, so delay on it delays project completion.
- Total float
- The amount of time an activity can be delayed without delaying project completion. Calculated as late start minus early start, or late finish minus early finish.
- Fast-tracking
- Overlapping activities that were planned sequentially to shorten duration. It increases coordination risk and rework potential compared with normal sequencing.
- Schedule variance
- Earned value minus planned value. A negative result means less work was accomplished than scheduled at the data date.
- Soil swell
- The increase in volume when excavated bank soil is loosened for hauling. Truck loads are computed on the larger loose volume, not the in-place volume.
- Proctor test
- A laboratory test establishing maximum dry density and optimum moisture content for a soil. Field compaction is specified as a percentage of that density.
- Frost line
- The depth to which soil freezes seasonally. Footings must bear below it, or be frost-protected, to prevent frost heave movement.
- Competent person
- An individual capable of identifying existing and predictable hazards and authorized to take prompt corrective action, including daily excavation inspections.
- Water-cement ratio
- The mass of water divided by mass of cementitious material in a mix. Lowering it increases strength and reduces permeability and shrinkage cracking.
- Slump test
- A field test measuring concrete consistency by the settlement of a molded cone. It verifies workability against the approved mix design.
- Rebar cover
- The concrete thickness between the steel surface and the exterior face. It protects bars from corrosion and provides fire resistance.
- Nominal versus actual lumber
- Nominal size is the rough name; actual size is smaller after surfacing. A nominal two-by-four measures one and one-half by three and one-half inches.
- Rough opening
- The framed opening in a wall, sized larger than the finished door or window unit to allow for shimming, squaring, and adjustment during installation.
- Deflection limit
- A span-to-deflection ratio such as L/360 that caps how much a member may bend under load. It governs allowable joist and beam spans.
- Roof slope factor
- The multiplier converting plan area to sloped roof area, equal to the square root of rise squared plus run squared, divided by run.
- Ice dam membrane
- A self-adhering waterproof underlayment installed at roof eaves in cold climates, extending from the edge to a point inside the interior wall line.
- Vapor retarder placement
- In cold climates the vapor retarder goes on the warm side of the insulation, typically the interior face, to limit moisture entering the assembly.
- GFCI protection
- Ground-fault circuit interrupter protection required in bathrooms, kitchens, outdoors, and other wet locations to prevent shock from ground faults.
- Drain slope
- Gravity drainage requires a uniform fall on horizontal drain pipe, commonly one-quarter inch per foot for pipe three inches and smaller.
- Fall protection threshold
- In construction, fall protection such as guardrails, nets, or personal fall arrest is required at working heights of six feet or more.