AMPP S-CAT study materials
AMPP S-CAT study resources

AMPP S-CAT study plan

AMPP S-CAT · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Spray Coating Application

  • Explain the spray coating process from surface prep handoff through cure, in your own written words

  • Identify the major spray coating equipment components and state the function of each

  • Define key spray coating terminology (atomization, transfer efficiency, film build) without notes

  • List the common spray coating defects and match each to a likely cause

Your checkpoint

A one-page written summary of the spray coating workflow with a labeled equipment-component list

Week 2

Spray Coating Application

  • Describe how atomization works and how air pressure, fluid pressure, and viscosity interact

  • Compare spray gun types and state when each is appropriate

  • Explain how gun distance, angle, and speed affect film thickness and finish quality

  • Calculate a simple wet-film-to-dry-film thickness conversion from a given volume-solids value

Your checkpoint

A completed worksheet of 10 film-thickness and transfer-efficiency calculations with worked steps

Week 3

Spray Coating Application

  • Diagnose common defects (sags, runs, orange peel, dry spray) from written symptom descriptions

  • Recommend corrective actions for each defect you diagnosed

  • Explain how environmental conditions (temperature, humidity, airflow) affect spray application

  • Describe proper gun cleaning and maintenance procedures and why each step matters

Your checkpoint

A defect-diagnosis table listing at least 8 defects with symptoms, causes, and corrective actions

Week 4

Spray Coating Application

  • Walk through a full spray coating job sequence and justify each decision

  • Explain coating selection considerations and how they drive application parameters

  • Describe multi-coat and recoat window requirements and the consequences of missing them

  • Identify which spray coating variables most affect quality and cost

Your checkpoint

A written end-to-end spray coating job plan for a hypothetical part, including parameters and rationale

Week 5

Surface Preparation

  • List surface preparation methods and state the standard or specification each satisfies

  • Explain how surface profile and cleanliness are measured and what acceptable results look like

  • Describe the consequences of inadequate surface preparation on coating performance

  • Sequence the steps of a complete surface preparation process from bare substrate to ready-to-coat

Your checkpoint

A surface preparation checklist covering method, standard reference, measurement, and acceptance criteria

Week 6

Surface Preparation & Spray Coating Application

  • Match surface preparation choices to coating and service-environment requirements

  • Explain how surface prep errors surface later as coating failures

  • Integrate surface prep steps into the spray coating workflow you planned in week 4

  • Identify inspection points between surface prep and coating application

Your checkpoint

A revised integrated prep-to-coat workflow with inspection hold points marked

Week 7

Safety and Inspection

  • Identify the primary safety hazards in spray coating and surface preparation operations

  • Explain required personal protective equipment and when each item is needed

  • Describe ventilation, fire, and confined-space considerations relevant to spray operations

  • List inspection and test methods used to verify coating quality and state what each measures

Your checkpoint

A safety and inspection reference sheet covering hazards, PPE, and at least 6 inspection test methods

Week 8

Spray Coating Application & Surface Preparation & Safety and Inspection

  • Answer practice questions across all three domains and score each domain separately

  • Review every missed item and write the correct reasoning for each

  • Re-state the highest-weight spray coating concepts from memory

  • Build a final one-page summary sheet of the facts you most often missed

Your checkpoint

A scored practice exam with a written review log of every missed question and a final summary sheet

Milestones

Week 2: Complete 10 film-thickness calculations with at least 8 correct and explain each error

Week 4: Deliver the full spray coating job plan and pass a self-quiz on Domain 1 concepts at 80% or higher

Week 6: Produce the integrated prep-to-coat workflow and correctly match 8 of 10 prep-to-coating scenarios

Week 8: Score 80% or higher overall on a full practice exam, with no domain below 70%