AMPP S-CAT · Give each week a clear focus.
8 weeks · About 6 hours per week
Spray Coating Application
Explain the spray coating process from surface prep handoff through cure, in your own written words
Identify the major spray coating equipment components and state the function of each
Define key spray coating terminology (atomization, transfer efficiency, film build) without notes
List the common spray coating defects and match each to a likely cause
Your checkpoint
A one-page written summary of the spray coating workflow with a labeled equipment-component list
Spray Coating Application
Describe how atomization works and how air pressure, fluid pressure, and viscosity interact
Compare spray gun types and state when each is appropriate
Explain how gun distance, angle, and speed affect film thickness and finish quality
Calculate a simple wet-film-to-dry-film thickness conversion from a given volume-solids value
Your checkpoint
A completed worksheet of 10 film-thickness and transfer-efficiency calculations with worked steps
Spray Coating Application
Diagnose common defects (sags, runs, orange peel, dry spray) from written symptom descriptions
Recommend corrective actions for each defect you diagnosed
Explain how environmental conditions (temperature, humidity, airflow) affect spray application
Describe proper gun cleaning and maintenance procedures and why each step matters
Your checkpoint
A defect-diagnosis table listing at least 8 defects with symptoms, causes, and corrective actions
Spray Coating Application
Walk through a full spray coating job sequence and justify each decision
Explain coating selection considerations and how they drive application parameters
Describe multi-coat and recoat window requirements and the consequences of missing them
Identify which spray coating variables most affect quality and cost
Your checkpoint
A written end-to-end spray coating job plan for a hypothetical part, including parameters and rationale
Surface Preparation
List surface preparation methods and state the standard or specification each satisfies
Explain how surface profile and cleanliness are measured and what acceptable results look like
Describe the consequences of inadequate surface preparation on coating performance
Sequence the steps of a complete surface preparation process from bare substrate to ready-to-coat
Your checkpoint
A surface preparation checklist covering method, standard reference, measurement, and acceptance criteria
Surface Preparation & Spray Coating Application
Match surface preparation choices to coating and service-environment requirements
Explain how surface prep errors surface later as coating failures
Integrate surface prep steps into the spray coating workflow you planned in week 4
Identify inspection points between surface prep and coating application
Your checkpoint
A revised integrated prep-to-coat workflow with inspection hold points marked
Safety and Inspection
Identify the primary safety hazards in spray coating and surface preparation operations
Explain required personal protective equipment and when each item is needed
Describe ventilation, fire, and confined-space considerations relevant to spray operations
List inspection and test methods used to verify coating quality and state what each measures
Your checkpoint
A safety and inspection reference sheet covering hazards, PPE, and at least 6 inspection test methods
Spray Coating Application & Surface Preparation & Safety and Inspection
Answer practice questions across all three domains and score each domain separately
Review every missed item and write the correct reasoning for each
Re-state the highest-weight spray coating concepts from memory
Build a final one-page summary sheet of the facts you most often missed
Your checkpoint
A scored practice exam with a written review log of every missed question and a final summary sheet
Milestones
Week 2: Complete 10 film-thickness calculations with at least 8 correct and explain each error
Week 4: Deliver the full spray coating job plan and pass a self-quiz on Domain 1 concepts at 80% or higher
Week 6: Produce the integrated prep-to-coat workflow and correctly match 8 of 10 prep-to-coating scenarios
Week 8: Score 80% or higher overall on a full practice exam, with no domain below 70%