API 653 study materials
API 653 study resources

API 653 cheat sheet

API 653 · Keep the key ideas within reach.

Quick reference

Tank Design and Construction

  • API 653 applies to aboveground steel storage tanks built to API 650 or API 12C whose internal design pressure does not exceed 2.5 psig (17 kPa gauge).

  • One-foot method shell thickness, US customary: t = 2.6D(H - 1)G/(SE); SI: t = 4.9D(H - 0.3)G/(SE), with H measured from the bottom of the course under consideration to the design liquid level.

  • Joint efficiency E for shell butt joints: 1.00 with full radiography, 0.85 with spot radiography, 0.70 with no radiography.

  • Minimum nominal plate thickness for new construction: shell 3/16 in. (5 mm) and bottom 1/4 in. (6 mm), exclusive of corrosion allowance.

  • Normal and emergency venting must be sized per API 2000; emergency vent capacity must cover fire exposure and abnormal vapor generation.

  • API 650 Appendix E governs seismic design and requires evaluation of impulsive and convective liquid components, shell compressive stress, sloshing wave height, and anchorage.

  • Frangible roof construction makes the roof-to-shell attachment the weak link so that overpressure lifts the roof and vents the tank before the shell-to-bottom joint fails.

  • Shell openings such as nozzles and manholes require reinforcement equal to the area removed, placed within the specified limits around the opening.

  • Changing shell height, diameter, or foundation changes the structural configuration and requires re-evaluation of shell thickness, stability, and anchorage.

Quick reference

Inspection, Examination, and Testing

  • External inspection intervals shall not exceed 5 years; intervals are shortened when corrosion rates or service conditions warrant.

  • Internal inspection interval shall not exceed 20 years and shall not exceed one-half the estimated remaining corrosion life of the shell or bottom.

  • Corrosion rate = (t previous - t current) / years between measurements; remaining life = (t current - minimum required thickness) / corrosion rate.

  • Minimum required thickness for each shell course is computed with the one-foot method using the liquid level expected at the next inspection, the product specific gravity, and the allowable stress.

  • Hydrostatic test: fill with water, hold typically 24 hours, then visually examine all welded joints and measure shell settlement; test water is normally at least 50 deg F (10 deg C).

  • Examination methods: radiography of butt welds, magnetic flux leakage or ultrasonic scanning of bottom plates, magnetic particle or liquid penetrant for surface flaws, and vacuum box testing of bottom lap welds.

  • Flaws found during inspection may be evaluated for continued service using the fitness-for-service procedures of API 579-1/ASME FFS-1.

  • Inspectors must have near vision corrected to Jaeger 1 at 12 in. and color vision adequate for the examination method used.

  • Pressure-vacuum vents and other relief devices shall be inspected and function-tested to confirm they open at the design settings.

Quick reference

Repair, Alteration, and Reconstruction

  • Repair restores a tank or part of a tank to a condition suitable for continued service; alteration changes structural design or configuration; reconstruction is reassembly of a tank that has been dismantled and relocated.

  • All welding for repairs, alterations, and reconstruction shall use welding procedures and welders qualified under ASME Boiler and Pressure Vessel Code Section IX.

  • Shell insert plates shall be at least 12 in. (300 mm) wide, have rounded corners, and be at least as thick as the minimum required at that location.

  • Peaking at vertical shell joints, measured with a 36 in. (900 mm) sweep board, shall not exceed 1/2 in. (13 mm).

  • Shell butt-weld repairs shall be examined by radiography to at least the extent required for the original joint.

  • A hydrostatic test is required after major repairs or alterations such as shell plate replacement, new or enlarged openings, or foundation work; the authorized inspector may waive testing for minor repairs where it is impractical.

  • Adding or enlarging a shell opening larger than 12 in. nominal pipe size, changing shell height, or changing the foundation are alterations requiring design re-evaluation.

  • Completed repairs and alterations are recorded on the nameplate or a supplemental plate and in the permanent tank records.

Quick reference

Operation, Maintenance, and Safety

  • Confined-space entry requires a permit, oxygen between 19.5 percent and 23.5 percent, flammable vapor below 10 percent of the lower explosive limit, and toxic gas within exposure limits per API 2015.

  • Hot work requires a permit, a combustible gas reading below 10 percent of the lower explosive limit, isolation of connected lines, and continuous atmospheric monitoring.

  • Initial filling is limited to about 3 ft/s (1 m/s) until the inlet is submerged, to control static charge generation.

  • Steel tank bottoms in soil are adequately protected when polarized to -0.85 V or more negative measured against a copper-copper sulfate reference electrode.

  • API 2350 requires overfill prevention including level alarms, an independent high-high sensor, and procedures to stop filling before overflow.

  • Routine water draw-off and sludge removal limit the water bottoms that drive pitting corrosion and underside corrosion.

  • Normal and emergency vents, flame arresters, and roof drains require routine inspection and cleaning to preserve design venting capacity.

  • The 5-year external inspection is supplemented by owner walk-arounds that check for leaks, settlement, coating breakdown, and secondary containment condition.

Quick reference

Decommissioning, Relocation, and Records

  • Out-of-service tanks shall be cleaned, gas-freed, and positively isolated from connected piping with blinds or a double block and bleed arrangement.

  • Before an out-of-service tank returns to service, the authorized inspector determines the inspection and testing required based on the reason and duration of the outage.

  • A dismantled and relocated tank is a reconstruction and must meet new-construction requirements for foundation, shell roundness, welding, and hydrostatic testing.

  • Reused shell plates must satisfy the minimum required thickness for the new service and be verified by thickness surveys before erection.

  • The original nameplate remains with the tank; reconstruction or relocation data are recorded on a new or supplemental nameplate attached near the original.

  • Construction, inspection, repair, and alteration records shall be maintained for the life of the tank and made available to the authorized inspector.

  • Inspection records include thickness measurements with locations and dates, calculated corrosion rates and remaining life, examination reports, and test results.

  • Permanently decommissioned tanks must be freed of product and sludge and then dismantled or left in a condition that prevents structural collapse and release of contained residues.