API 653 key terms
API 653 · Get comfortable with the vocabulary.
- Shell course
- Related: One-foot method, Peaking, Annular plate
One horizontal ring of steel plates that forms part of the cylindrical side of a tank. Courses are stacked and welded to build the shell and are numbered from the bottom upward.
- Annular plate
- Related: Shell course, Critical zone, Soil-side corrosion
The ring of bottom plates that lies under and around the inside edge of the shell. It is usually thicker than the rest of the bottom and carries shell loads into the foundation.
- Peaking
- Related: Banding, Out-of-roundness, Shell course
A sharp outward bend or kink in the shell at a horizontal weld seam, caused by weld shrinkage. It is measured with a weld reinforcement gauge and limited because it concentrates stress.
- Banding
- Related: Peaking, Out-of-roundness
A flat or dished spot in the shell beside a horizontal weld seam, forming a band of distortion around the circumference. Like peaking, it is measured and limited to control shell stress.
- Out-of-roundness
- Related: Peaking, Banding, Shell course
Deviation of the shell from a true circle, taken as the difference between the largest and smallest radius at a given level. Excessive values make fit-up difficult and concentrate stresses.
- One-foot method
- Related: Variable-design-point method, Minimum acceptable thickness, Shell course
A shell thickness calculation in which each course is designed for the liquid head one foot above its bottom edge. It is the standard approach for most tanks and is used to compute minimum acceptable thickness.
- Variable-design-point method
- Related: One-foot method, Shell course
A shell thickness calculation used for large-diameter tanks in which the design point for each course is chosen to give the least required thickness. It accounts for the stiffening effect of lower courses.
- Shell settlement
- Related: Suitability-for-service assessment, Inspection interval
Downward movement of the shell caused by foundation compression or soil failure. Levels are taken at points around the circumference and compared with limits for uniform, planar-tilt, and out-of-plane settlement.
- Ultrasonic thickness measurement
- Related: Corrosion rate, Minimum acceptable thickness, Remaining life
A nondestructive method that sends high-frequency sound into steel and reads the echo return to determine remaining wall thickness. It is the main tool for mapping corrosion in shells, bottoms, and roofs.
- Magnetic flux leakage examination
- Related: Soil-side corrosion, Ultrasonic thickness measurement, Out of service
A bottom inspection method that magnetizes the floor and uses sensors to find where flux leaks out at areas of metal loss or pitting. Scanning is done from inside an empty tank.
- Vacuum box test
- Related: Insert plate, Ultrasonic thickness measurement
A leak test in which a soapy solution is applied to a weld, a clear box is sealed over it, and air is drawn out. Bubbles under the box reveal a through-thickness leak.
- Corrosion rate
- Related: Remaining life, Minimum acceptable thickness, Inspection interval
The speed at which metal thickness is lost, found by dividing the difference between two thickness readings taken on known dates by the elapsed time. It is normally reported in mils or millimeters per year.
- Minimum acceptable thickness
- Related: Remaining life, One-foot method, Corrosion rate
The smallest wall thickness a shell course, bottom plate, or roof may have while stresses stay within allowable limits for the design liquid level and product. It sets the trigger point for repair decisions.
- Remaining life
- Related: Corrosion rate, Inspection interval, Minimum acceptable thickness
The estimated time before a measured thickness falls to the minimum acceptable value, calculated by dividing the thickness above the minimum by the corrosion rate.
- Inspection interval
- Related: Remaining life, Risk-based inspection, Suitability-for-service assessment
The longest time allowed before the next internal or external inspection. It is set from corrosion rate, remaining life, and service conditions, and there is a ceiling on how far it can be extended.
- Risk-based inspection
- Related: Inspection interval, Suitability-for-service assessment
A planning method that ranks tanks and components by the likelihood and consequence of failure, then directs inspection effort where risk is highest instead of applying fixed intervals to every tank.
- Suitability-for-service assessment
- Related: Remaining life, Repair, Inspection interval
A documented evaluation by an inspector or engineer of whether a tank with known corrosion, cracks, or distortion can safely remain in service until the next scheduled inspection.
- Soil-side corrosion
- Related: Cathodic protection, Magnetic flux leakage examination
Metal loss on the underside of the tank bottom caused by moisture, soil chemistry, and bacteria. It cannot be seen from inside and is controlled by liners, release barriers, and cathodic protection.
- Hydrostatic test
- Related: Reconstruction, Alteration, Repair
Filling a tank with water to a stated level and holding it to prove structural adequacy and tightness. It is required after major repairs, alterations, and reconstruction before the tank returns to service.
- Critical zone
- Related: Lap patch, Insert plate, Shell course
The region where shell meets bottom: the shell plate within about three inches above the corner weld, that weld, and the adjoining bottom plate. It gets extra inspection and restricts certain repairs.
- Repair
- Related: Alteration, Insert plate, Lap patch
Work that restores a tank or component to sound condition without changing its size, design, or service. Replacing a corroded plate or fixing a roof are typical examples.
- Alteration
- Related: Repair, Reconstruction, Change of service
A change that affects the tank's physical configuration or design basis, such as raising shell height, changing diameter, adding a large opening, or switching to a more severe product. It needs engineering review.
- Reconstruction
- Related: Relocation, Hydrostatic test, Alteration
Dismantling a tank and erecting it again in whole or in major part, including new bottom, shell, or roof. The rebuilt tank must meet current design rules and be tested before service.
- Insert plate
- Related: Lap patch, Repair, Critical zone
A replacement plate cut to fit an area removed from shell, roof, or bottom and joined with full-penetration welds. It restores both strength and tightness where corrosion or cracking has taken metal.
- Lap patch
- Related: Insert plate, Weld build-up, Critical zone
A plate laid over a damaged area and welded around its edge without cutting out the original plate. Size, location, and thickness are restricted, and it is not allowed over the shell-to-bottom weld.
- Weld build-up
- Related: Lap patch, Insert plate
Adding layers of weld metal to a thinned surface to restore thickness. It is permitted only in limited areas and depths, using qualified procedures, because it can create hard zones and cracking.
- Hot tap
- Related: Hot work permit, Repair, Change of service
Cutting or drilling an opening into a tank or pipe that is still in service, using a special machine and valve so product does not escape. It needs a written procedure and strict safety controls.
- Change of service
- Related: Alteration, Suitability-for-service assessment, Hydrostatic test
Putting a tank into a product, temperature, or duty different from its original design. This triggers review of materials, thickness, vents, and testing before the tank is used again.
- Emergency vent
- Related: Maximum fill height, Overfill protection
A large-capacity vent that opens to relieve internal pressure when a tank is exposed to fire, protecting the shell and roof from overpressure. It is sized for the expected heat input.
- Overfill protection
- Related: Maximum fill height, Emergency vent
Alarms, level devices, and procedures that stop a tank from being filled above its safe limit. They keep product from overflowing into dikes, drains, or the environment.
- Cathodic protection
- Related: Soil-side corrosion, Out of service
Buried anodes or an impressed current that push a small electrical current onto the underside of a steel bottom, blocking the electrochemical reaction that causes soil-side corrosion.
- Confined space entry
- Related: Hot work permit, Out of service
Going into a tank, pit, or similar enclosure with limited entry and exit and poor natural air movement. It requires a permit, atmosphere testing, ventilation, an attendant, and rescue provisions.
- Hot work permit
- Related: Confined space entry, Hot tap
A written authorization to weld, cut, grind, or do other spark-producing work in a tank area after the space has been cleaned, tested for flammable gas, and isolated from product.
- Maximum fill height
- Related: Overfill protection, Emergency vent
The highest product level a tank may be filled to, established from shell thickness limits, freeboard, and overfill protection so that design stresses and containment are not exceeded.
- Out of service
- Related: Closure, Relocation, Confined space entry
The condition of a tank that has been emptied, cleaned, isolated, and taken out of product service, usually so it can be entered for inspection, repair, or permanent closure.
- Closure
- Related: Out of service, Record retention
Permanently ending a tank's service, either by cleaning and filling it with inert material or by removing it, with site restoration and final records completed as required for out-of-service tanks.
- Relocation
- Related: Reconstruction, Hydrostatic test, Record retention
Moving a tank to a new site by dismantling, transporting, and re-erecting it. The rebuilt tank is treated as reconstructed, so it needs current design review and a hydrostatic test.
- Record retention
- Related: Nameplate, Inspection interval, Closure
Keeping design, inspection, repair, and test records for each tank so its condition and history can be traced. Records support setting inspection intervals and proving compliance over the tank's life.
- Nameplate
- Related: Record retention, Shell course
A metal plate on the tank recording the design standard, nominal capacity, materials, and design conditions as built. Inspectors use it to confirm the original design basis.