Inspection and Test Plan (ITP)

A project-specific document listing inspections, tests, and acceptance records in sequence, with hold, witness, and review points identified so the inspector and manufacturer know what evidence is required before work advances.

Related: Hold Point, Witness Point, Review Point
Hold Point

A step in the inspection and test plan where manufacturing must stop until the inspector completes the required check and records approval; work cannot proceed without documented release.

Related: Inspection and Test Plan (ITP), Witness Point, Source Inspection
Witness Point

A scheduled inspection or test that the inspector may observe but that does not stop production if the inspector is absent; the manufacturer proceeds and records the result.

Related: Hold Point, Inspection and Test Plan (ITP)
Review Point

A document or record check performed by the inspector at a defined stage, where production may continue but the record must be reviewed and accepted before final release.

Related: Inspection and Test Plan (ITP), Document Control
Pre-Inspection Meeting

A meeting before work begins where the manufacturer, purchaser, and inspector confirm the inspection and test plan, specifications, hold points, communication paths, and reporting expectations to prevent later misunderstandings.

Related: Inspection and Test Plan (ITP), Surveillance Level
Surveillance Level

The amount and frequency of inspection activity assigned to a supplier or product, ranging from periodic visits to continuous presence, based on risk, criticality, and prior performance.

Related: Source Inspection, Pre-Inspection Meeting
Source Inspection

Inspection performed at the manufacturer's or supplier's facility while the product is being fabricated, allowing verification of processes and concealed characteristics before shipment rather than relying only on receiving inspection.

Related: Surveillance Level, In-Process Inspection
Sampling Plan

A defined rule stating how many units or measurements to examine from a lot and the acceptance number, used to make a statistically based decision about the whole lot.

Related: Acceptance Criteria, In-Process Inspection
Inspection Checklist

A structured list of items, characteristics, and records the inspector must verify during a visit, helping ensure consistent coverage and complete documentation of observations and results.

Related: Inspection and Test Plan (ITP), Records Retention
In-Process Inspection

Verification performed during manufacturing at defined stages, rather than only at final acceptance, to catch deviations while they can still be corrected economically.

Related: First Article Inspection, Special Process
First Article Inspection

A thorough verification of the first production item against all drawing and specification requirements, establishing that the process, tooling, and inspection methods can produce conforming work.

Related: In-Process Inspection, Dimensional Inspection
Welding Procedure Specification (WPS)

A written, qualified document that specifies welding variables such as process, filler metal, joint design, preheat, and heat input so welders can produce joints meeting the required mechanical and quality properties.

Related: Procedure Qualification Record (PQR), Welder Performance Qualification
Procedure Qualification Record (PQR)

A record of the tests and variables used to qualify a welding procedure specification; it documents that a test weld met the required mechanical and nondestructive examination results.

Related: Welding Procedure Specification (WPS), Heat Treatment
Welder Performance Qualification

Evidence that an individual welder can produce sound welds using a specific process and position, usually demonstrated by test coupons that pass visual and mechanical examinations.

Related: Welding Procedure Specification (WPS), Non-Destructive Examination (NDE)
Heat Treatment

Controlled heating and cooling of material or a fabricated component to achieve specified properties, relieve residual stresses, or meet code requirements, with temperature and time recorded for verification.

Related: Pyrometry, Procedure Qualification Record (PQR)
Pyrometry

The measurement and control of temperatures in furnaces and heat-treating equipment, including calibration of instruments and surveys that demonstrate uniform temperature within the qualified work zone.

Related: Heat Treatment, Calibration
Positive Material Identification (PMI)

A field or shop technique, often using X-ray fluorescence or optical emission, that verifies the chemical composition or alloy identity of material before it is installed or released.

Related: Material Traceability, Mill Test Report (MTR)
Material Traceability

The ability to link finished components to their originating heat, lot, or batch through markings and records, so material certification and process history can be retrieved later.

Related: Mill Test Report (MTR), Manufacturer's Data Report (MDR)
Calibration

Comparison of an instrument or gauge against a reference standard of known accuracy, with results documented, to establish that measurements used for acceptance are reliable.

Related: Pyrometry, Dimensional Inspection
Special Process

A manufacturing process whose results cannot be fully verified by later inspection, such as welding, heat treatment, coating, or nondestructive examination, requiring qualification of procedures and personnel.

Related: Welding Procedure Specification (WPS), Non-Destructive Examination (NDE), Heat Treatment
Coating Inspection

Verification of surface preparation, application conditions, and dry-film thickness of protective coatings, including checks for cleanliness, adhesion, and continuity required by the specification.

Related: Visual Inspection, Acceptance Criteria
Non-Destructive Examination (NDE)

Methods such as radiographic, ultrasonic, magnetic particle, and liquid penetrant testing that examine material or welds for discontinuities without destroying the component, performed by qualified personnel under approved procedures.

Related: Welder Performance Qualification, Acceptance Criteria, Special Process
Hydrostatic Test

A pressure test in which a vessel, pipe, or component is filled with water and pressurized above its design pressure to demonstrate structural integrity and leak tightness before acceptance.

Related: Acceptance Criteria, Non-Destructive Examination (NDE)
Dimensional Inspection

Measurement of product features such as size, shape, and position against drawing tolerances using calibrated tools, fixtures, or coordinate measuring equipment.

Related: Calibration, First Article Inspection
Visual Inspection

Examination of surfaces, joints, and workmanship by eye, sometimes aided by magnification or lighting, to detect defects such as cracks, porosity, undercut, corrosion, or coating damage.

Related: Coating Inspection, Acceptance Criteria
Acceptance Criteria

The specified limits, tolerances, and test results that determine whether a product or process conforms; they must be defined before inspection so decisions are consistent and defensible.

Related: Nonconformance Report (NCR), Inspection and Test Plan (ITP)
Mill Test Report (MTR)

A supplier document reporting the chemical composition and mechanical properties of a material heat, used to confirm that the delivered product meets the purchase specification.

Related: Material Traceability, Positive Material Identification (PMI)
Certificate of Conformance (CoC)

A signed statement declaring that the supplied product or service conforms to specified requirements, supported by records that the manufacturer retains and makes available on request.

Related: Mill Test Report (MTR), Manufacturer's Data Report (MDR)
Punch List

A documented list of outstanding minor deficiencies or incomplete items found near completion, tracked until corrected and verified, allowing final acceptance to proceed.

Related: Nonconformance Report (NCR), Manufacturer's Data Report (MDR)
Nonconformance Report (NCR)

A formal record describing a detected nonconformity, its location, extent, and disposition, used to control nonconforming product and trigger investigation or corrective action.

Related: Corrective Action, Concession/Deviation, Punch List
Corrective Action

Action taken to eliminate the cause of a detected nonconformity so it does not recur, distinct from containment or rework, and usually verified for effectiveness.

Related: Root Cause Analysis, Nonconformance Report (NCR)
Root Cause Analysis

A structured investigation to identify the underlying process or system weakness that allowed a nonconformity, rather than only the immediate symptom, so effective corrective action can be chosen.

Related: Corrective Action, Nonconformance Report (NCR)
Document Control

A system ensuring that current specifications, procedures, drawings, and forms are approved, distributed, and available at the point of use, while obsolete versions are withdrawn.

Related: Records Retention, Quality Management System (QMS)
Records Retention

A defined schedule for keeping inspection reports, test records, certifications, and quality records for the period required by contract, code, or regulation.

Related: Document Control, Manufacturer's Data Report (MDR)
Manufacturer's Data Report (MDR)

A compiled report of manufacturing, inspection, and test records for a finished component, submitted to the purchaser as evidence that all specified requirements were met.

Related: Mill Test Report (MTR), Records Retention, Certificate of Conformance (CoC)
Quality Management System (QMS)

The organizational structure, procedures, and resources established to direct and control quality, including planning, control of documents, inspection, nonconformance handling, and continual improvement.

Related: Document Control, Corrective Action, API Monogram
Concession/Deviation

A documented, approved departure from a specification or drawing requirement, usually limited in scope and time, granted before or after production with purchaser or engineering agreement.

Related: Nonconformance Report (NCR), Acceptance Criteria
API Monogram

A licensed mark applied to products manufactured under API specifications, indicating that the manufacturer's quality system and product meet API licensing requirements and that authorized inspection has occurred.