APMG Change Management Foundation study materials
APMG Change Management Foundation study resources

APMG Change Management Foundation cheat sheet

APMG Change Management Foundation · Keep the key ideas within reach.

Quick reference

Change and the individual

  • ADKAR sequence: Awareness → Desire → Knowledge → Ability → Reinforcement; each element must be achieved in order for the change to stick.

  • Kubler-Ross change curve stages commonly cited: shock/denial, anger, bargaining, depression and acceptance; individuals move through them at different speeds.

  • Bridges transition model phases: Ending (letting go), Neutral Zone (confusion and low productivity), New Beginning (commitment and new identity).

  • Beckhard-Harris change equation: D × V × F > R, where Dissatisfaction × Vision × First steps must exceed Resistance; if any factor is zero, the product is zero.

  • Lewin individual change: Unfreeze (create motivation), Change (learn and practise new behaviour), Refreeze (reinforce and sustain).

  • Resistance is a normal response; common sources include loss of control, loss of competence, loss of security and loss of social ties.

  • Training alone builds Knowledge, not Ability; Ability requires practice, coaching, time and removal of barriers.

  • Perceived personal impact, capability and support influence an individual's readiness to change.

Quick reference

Change and the organisation

  • Kotter's eight steps: urgency, guiding coalition, vision, communicate the vision, empower action, short-term wins, consolidate gains, anchor in culture.

  • Lewin organisational change: Unfreeze, Change, Refreeze; force-field analysis compares driving forces and restraining forces.

  • McKinsey 7S: Strategy, Structure, Systems, Shared values, Style, Staff, Skills; hard and soft elements must align.

  • Change types include incremental (small, continuous) and transformational (radical, discontinuous); punctuated equilibrium describes stability interrupted by radical change.

  • Change kaleidoscope (Balogun & Hope Hailey) analyses context, design choices and change management levers.

  • Projects deliver outputs; change management delivers outcomes and benefits through adoption and use.

  • Schein's culture levels: artefacts, espoused values, underlying assumptions; changing artefacts without addressing assumptions does not change culture.

  • Benefits management defines benefits, baselines them, and tracks realisation after go-live.

Quick reference

Stakeholder strategy

  • Stakeholder: any individual or group affected by, or able to affect, the change.

  • Mendelow power/interest grid: high power-high interest = manage closely; high power-low interest = keep satisfied; low power-high interest = keep informed; low-low = monitor.

  • Stakeholder salience model: power, legitimacy and urgency determine priority; definitive stakeholders have all three.

  • Stakeholder analysis records influence, attitude (support/oppose/neutral), impact and needs.

  • Engagement objectives range from inform and consult to involve, collaborate and empower.

  • Active and visible sponsorship from senior leaders is a top predictor of change success.

  • Resistance can be overt, covert, active or passive; address root causes such as loss of control or competence.

  • A stakeholder engagement plan specifies messages, channels, frequency, owner and feedback loop.

Quick reference

Communication and engagement

  • Communication plan elements: audience, message, channel, timing, sender and feedback mechanism.

  • Effective change messages are clear, concise, credible, relevant and repeated through multiple channels.

  • Engagement ladder: inform, consult, involve, collaborate, empower; higher levels increase ownership and require more effort.

  • Two-way communication with feedback reduces uncertainty and surfaces concerns that one-way messages hide.

  • Face-to-face channels suit complex or emotional messages; written channels suit detail and record.

  • Cascade communication through line managers risks distortion, so core messages must be consistent and reinforced.

  • WIIFM ('what's in it for me') links change messages to personal consequences and supports Awareness and Desire.

  • Silence creates rumour; communicate early even when details are incomplete.

Quick reference

Change impact

  • Impact analysis identifies changes to people, process, technology, structure and policy.

  • Change impact assessment rates severity, volume and timing of impacts per stakeholder group.

  • Gap analysis compares current state with future state; gaps become actions for transition and readiness.

  • Role impact covers tasks, skills, behaviours, workload and decision rights.

  • Business readiness covers process, systems, data, people and support such as training and help desk.

  • Adoption and usage are outcome metrics; training completion is an output metric.

  • Higher impact severity requires greater intervention effort in training, communication and support.

  • Cutover and go-live depend on readiness across all impact dimensions, not just technology.

Quick reference

Change readiness

  • Readiness = ability + willingness + capacity to adopt the change.

  • Readiness dimensions include leadership, sponsorship, culture, capacity, capability, engagement and change history.

  • Change fatigue from repeated or overlapping change reduces capacity and motivation.

  • Readiness assessment baselines awareness, desire, knowledge and ability, then is repeated at milestones.

  • Readiness criteria for go-live include training complete, support in place, communications done and risks managed.

  • Readiness metrics include awareness levels, training completion, adoption, resistance levels and sponsor activity.

  • Insufficient capacity (time, resources, attention) is a common cause of change saturation and failure.

  • Participation and engagement increase readiness; lack of involvement increases resistance.