ARE 5.0: CE study materials
ARE 5.0: CE study resources

ARE 5.0: CE flashcards

ARE 5.0: CE · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Bid bond
A surety instrument submitted with a bid that guarantees the bidder will enter the contract and furnish the required bonds; typically 5 to 10 percent of the bid amount.
Performance bond
A surety bond equal to 100 percent of the contract sum that protects the owner if the contractor fails to complete the work according to the contract.
Payment bond
A bond that protects the owner from mechanics' liens by guaranteeing the contractor pays subcontractors, laborers, and suppliers; usually 100 percent of the contract sum.
Guaranteed maximum price
A cost-plus contract with a ceiling: the contractor's compensation may not exceed the stated GMP, and savings below the GMP are shared per the contract.
Unit price contract
A contract in which work is paid per measured unit of material or labor, used when quantities cannot be precisely determined at bid time.
Critical path float
Float equals late start minus early start, or late finish minus early finish; activities with zero total float lie on the critical path.
Value engineering
A structured cost-reduction review of design or construction alternatives; contract clauses set who may propose changes and how resulting savings are shared.
Addendum
A written modification to the bidding documents issued before the bid deadline that becomes part of the contract documents and must be acknowledged on the bid form.
Observation report
A dated written record of site conditions and work progress that is factual and informational; it does not direct the contractor to change the work.
Architect's site visit
A visit made at intervals appropriate to the stage of work to observe general conformance with the contract documents; visits are not continuous and do not guarantee quality.
Means and methods
Construction means, methods, techniques, sequences, and procedures are controlled solely by the contractor; the architect's observation does not supervise or approve them.
Shop drawing review stamp
The architect's review confirms conformance with the design concept only; it does not relieve the contractor of responsibility for dimensions, quantities, and field conditions.
Safety responsibility
Site safety, OSHA compliance, and protection of persons and property are the contractor's responsibility; the architect has no duty to supervise safety programs.
Nonconforming work
Work that does not conform to the contract documents must be rejected promptly in writing, and the contractor must correct it at its own cost.
Mock-up
A full-size physical sample built on site for the architect's approval of workmanship and appearance before the related work proceeds.
Hazardous materials discovered
When the architect finds hazardous materials, affected work stops, the owner and contractor are notified in writing, and the owner engages a specialist.
Request for information
A contractor's written question about the contract documents; the architect must answer promptly, and the answer becomes part of the contract documents.
Change order
A written instrument signed by the owner, architect, and contractor that authorizes a change in scope, contract sum, or contract time.
Construction change directive
A written order by the owner and architect directing a change when price and time are not yet agreed; the contractor must proceed and pricing is resolved later.
Architect's supplemental instruction
A minor written clarification or interpretation issued by the architect that does not change contract sum or time; used instead of a change order.
Application for payment
The contractor's periodic request for payment, typically AIA G702 with a G703 continuation sheet, which the architect reviews and certifies to the owner.
Retainage
A percentage, usually 5 to 10 percent, withheld from each progress payment until substantial or final completion to protect the owner.
Conditional lien waiver
A waiver that becomes effective only when the stated payment is actually received; it is used for progress and final payments to release lien rights.
Excusable delay
A delay beyond the contractor's control, such as severe weather or owner-caused events, that may justify a time extension but usually not additional cost.
Substantial completion
The stage when the work is sufficiently complete for the owner's intended use; it starts warranty periods and typically triggers partial release of retainage.
Punch list
A list of minor incomplete or deficient items identified at substantial completion that the contractor must correct before final completion is certified.
Certificate of occupancy
Issued by the local building authority, it confirms the completed building complies with code and is legally usable for its occupancy classification.
Final payment
Payment made after final inspection and the architect's final certificate for payment, contingent on lien waivers, consent of surety, and complete closeout documents.
Consent of surety
The surety's written agreement to final payment, confirming bonded obligations are satisfied; often a prerequisite to releasing final payment and retainage.
As-built documents
Record drawings the contractor marks up to show actual installed conditions, including all changes, and delivers to the owner at closeout.
Post-occupancy evaluation
A structured review conducted roughly six to twelve months after occupancy to assess performance, user satisfaction, and lessons learned for future projects.
Attic stock
Extra materials the contractor delivers to the owner at closeout so damaged or worn components can later be replaced with matching products.