ARE 5.0: PA study materials
ARE 5.0: PA study resources

ARE 5.0: PA cheat sheet

ARE 5.0: PA · Keep the key ideas within reach.

Quick reference

Environmental & Contextual Conditions

  • Solar geometry: noon sun altitude = 90° − latitude ± 23.5° (plus at summer solstice, minus at winter solstice); azimuth is measured clockwise from true north.

  • Overhang rule of thumb: depth ≈ window height ÷ tan(noon altitude); size for the summer solstice to shade, then verify the winter solstice sun still penetrates for passive gain.

  • Prevailing winds are read from a wind rose; windbreaks placed perpendicular to the prevailing winter wind reduce infiltration, while openings oriented to summer breezes support natural ventilation.

  • Rational method for peak runoff: Q = C·i·A, where Q is peak flow (cfs), C is the runoff coefficient (dimensionless, 0.1–0.95), i is rainfall intensity (in/hr), and A is drainage area (acres).

  • FEMA flood zones: A and AE map the 1% annual chance flood (AE includes a published base flood elevation); V and VE are coastal high-hazard with wave action; X is moderate or minimal risk.

  • Sound from a point source drops about 6 dB per doubling of distance; a barrier or berm attenuates only if it breaks the line of sight between source and receiver.

  • Daylight factor = interior illuminance ÷ exterior illuminance under an unobstructed CIE overcast sky, expressed as a percent; roughly 2% is a common target for ordinary office work.

  • Heat island mitigation set: high-albedo/high-SRI roofs and paving, shade trees, green roofs, and pervious surfaces, which lower ambient temperature and reduce runoff volume.

  • Environmental site assessment sequence: Phase I (records review, site reconnaissance, interviews) precedes Phase II (soil and groundwater sampling); both precede brownfield redevelopment.

Quick reference

Codes & Regulations

  • Zoning math: floor area ratio = gross floor area ÷ lot area; lot coverage = building footprint ÷ lot area; both are zoning limits separate from building-code requirements.

  • Occupant load = floor area ÷ occupant load factor (e.g., 100 sf/person for business); egress width = occupant load × capacity factor (0.2 in per occupant for stairs, 0.15 in for other components under IBC).

  • IBC occupancy groups: A assembly, B business, E educational, F factory, H high hazard, I institutional, M mercantile, R residential, S storage, U utility.

  • IBC Types I–V run from most to least fire resistive; automatic sprinklers commonly allow area increases up to 200% and a one-story height increase, subject to the tables.

  • Accessible route minimums: 36 in clear width, 60 in turning space, ramp slope max 1:12 with a landing every 30 in of rise, walking surface cross slope max 1:48.

  • Reach ranges: unobstructed reach 15–48 in above the floor for both forward and side reach; obstructed high forward reach max 40 in.

  • Guards 42 in minimum at floor openings and open-sided elevated surfaces; handrails 34–38 in above stair nosings.

  • Zoning relief tools are distinct: variance (hardship), conditional/special use permit (listed use with conditions), and rezoning; Section 106 review applies to federal undertakings affecting historic properties.

  • Two means of egress are triggered by occupant load thresholds, common path limits, and travel distance limits that vary by occupancy and construction type.

Quick reference

Site Analysis & Programming

  • Slope = rise ÷ run, expressed as a percent; 5% is a comfortable walkable grade, and accessible routes cap running slope at 1:20 and cross slope at 1:48.

  • Contours: spacing is inversely proportional to slope (close = steep); a contour crossing a drainage swale forms a V pointing upstream.

  • Balanced cut and fill minimizes haul cost, but bank volume, loose volume, and compacted fill volume differ by swell and shrinkage factors.

  • Site inventory layers: boundary survey, topography, soils/geotech, vegetation, hydrology and floodplain, utilities, easements, views, noise sources, and solar access.

  • Net program area divided by the target efficiency yields required gross area; typical efficiency is 65–80% depending on building type and core size.

  • Parking planning figure: roughly 300–350 sf per space including drive aisle; verify against local ratios and count accessible spaces from the code table.

  • Stormwater rules commonly require post-development peak discharge and volume to match pre-development conditions, achieved with detention, infiltration, and pervious paving.

  • Utility feasibility: confirm invert elevations and capacity; a 4 in gravity sanitary line needs at least about 1/8 in per foot of fall (roughly 1%).

  • Wetlands, floodplains, and stream buffers constrain the buildable area; buffers of 25–100 ft are common and trigger federal or state permitting.

Quick reference

Building Analysis & Programming

  • Programming sequence: space list with net areas and occupancies → adjacency matrix → bubble diagram → block plan → schematic plan, adding dimensional constraint at each step.

  • Core components (elevators, egress stairs, restrooms, shafts) typically consume 15–25% of the floor plate; office net-to-gross efficiency is often 75–85%.

  • Structural bay sets the parking module: a double-loaded parking bay needs roughly 60 ft of column-free span to fit two rows of stalls plus a drive aisle.

  • Daylight and natural ventilation generally work with lease spans of 40–45 ft or less from core or corridor to exterior wall; deeper plates require mechanical or atrium strategies.

  • Floor-to-floor height = clear ceiling + structure + mechanical/electrical zone; verify against existing floor-to-floor dimensions in adaptive reuse.

  • A change of occupancy classification in an existing building triggers code evaluation of egress, fire resistance, sprinklers, and accessibility under the applicable existing-building code.

  • Elevator planning rule of thumb: about one elevator per 40,000–50,000 sf of office area, confirmed by a traffic analysis for the actual population.

  • Space planning check: assignable area plus walls, circulation, core, and mechanical must reconcile to the gross area used for cost and code calculations.

  • Envelope performance depends on continuity of insulation; thermal bridging at slab edges, balconies, and shelf angles degrades the assembly's effective R-value.