ARE 5.0: PA flashcards
ARE 5.0: PA · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Solar azimuth
- The horizontal angle of the sun measured clockwise from true north; paired with altitude it plots sun paths used to size overhangs and fins.
- Rational method
- Q = CiA estimates peak stormwater runoff, where Q is flow, C is the runoff coefficient, i is rainfall intensity, and A is the contributing drainage area.
- Base flood elevation
- The water surface elevation of the 1% annual chance flood, published on FEMA maps and used by local codes to set minimum first-floor heights and freeboard.
- Heat island effect
- Warmer urban temperatures caused by dark paving and roofs, sparse vegetation, and lost evaporative cooling; mitigated with high-albedo surfaces, trees, and green roofs.
- Prevailing wind
- The most frequent wind direction at a site, plotted on a wind rose; it drives natural ventilation design, windbreak placement, and pedestrian comfort studies.
- Daylight factor
- The ratio of interior illuminance at a point to simultaneous exterior illuminance under an unobstructed overcast sky, expressed as a percentage of exterior light.
- Phase I ESA
- A records review, site reconnaissance, and interviews identifying recognized environmental conditions; typically required before purchase or redevelopment of property with possible contamination.
- Distance sound attenuation
- In free space, sound level from a point source drops roughly 6 decibels each time the distance to the receiver doubles; barriers and berms add further reduction.
- Floor area ratio
- Gross building floor area divided by lot area; a zoning control limiting building bulk that operates independently of lot coverage and height limits.
- Occupant load factor
- A code table value of floor area per person used to compute occupant load, which in turn sizes egress width and exit counts; offices often use 100 sf/person.
- Travel distance
- The measured length of the egress path from the most remote point of a floor to an exit; the code caps it by occupancy group and construction type.
- Common path of egress
- The distance an occupant must travel before reaching a point where two independent egress directions become available.
- Maximum ramp slope
- In accessible routes, ramps may not exceed a 1:12 slope, and each run may rise no more than 30 inches before a level landing is required.
- Type of construction
- IBC classifications I through V describing the required fire resistance of structural elements; Type I is most fire resistive and Type V least.
- Readily achievable barrier removal
- The ADA standard for existing buildings: removing architectural barriers that is easily accomplishable and inexpensive without much difficulty or expense.
- Nonconforming use
- A use predating current zoning that may continue under a grandfather clause, but typically cannot expand and may not resume after extended discontinuance.
- Contour interval
- The constant vertical distance between adjacent contour lines on a topographic map; closely spaced lines indicate steep slopes and wide spacing indicates flat ground.
- Cut and fill
- Earthwork balancing soil excavated from the site against soil placed as fill; balanced grading minimizes hauling cost and unnecessary site disturbance.
- Easement
- A legal right to use another party's land for a specific purpose such as utilities or access; it burdens the site and must appear on the survey.
- Metes and bounds
- A property description using bearings, distances, and monumented points beginning at a known corner; common in older parcels and plats.
- Bearing capacity
- The maximum pressure soil can support without shear failure, established by geotechnical borings and used to size footings and determine foundation type.
- Building efficiency ratio
- Net usable area divided by gross floor area; it expresses how much building area serves the program rather than core, structure, and circulation.
- Parking area rule of thumb
- A rough planning figure of 300 to 350 square feet per car including drive aisle, used to test site capacity before a parking consultant refines the count.
- Wetland delineation
- A field survey by a qualified specialist locating wetland boundaries using soils, hydrology, and vegetation; it triggers federal and state permitting and buffer requirements.
- Adjacency matrix
- A grid scoring required relationships among program spaces; strong, weak, or undesired adjacencies are then translated into a bubble diagram.
- Stacking diagram
- A vertical arrangement showing which program functions occupy each floor, aligning structure, core locations, and mechanical zones before floor planning begins.
- Net to gross
- The ratio of assignable program area to total building area, with the difference absorbed by walls, core, circulation, and mechanical space.
- Structural bay
- The repetitive column spacing of a building frame; it constrains parking module fit, lease span, and the distribution of mechanical and electrical systems.
- Lease span
- The distance from the core or corridor to the exterior wall; it governs daylight penetration and the practical depth of lettable office space.
- Adaptive reuse
- Converting an existing building to a new use; it requires verifying floor-to-floor height, structural capacity, and egress against the new program's needs.
- Building core
- The clustered elevators, egress stairs, restrooms, and mechanical shafts serving every floor, typically occupying 15 to 25 percent of the plate area.
- Thermal bridging
- A heat flow path that bypasses insulation through framing, slab edges, or ties, lowering effective envelope performance; mitigated by continuous exterior insulation.