ARE 5.0: PA study materials
ARE 5.0: PA study resources

ARE 5.0: PA flashcards

ARE 5.0: PA · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Solar azimuth
The horizontal angle of the sun measured clockwise from true north; paired with altitude it plots sun paths used to size overhangs and fins.
Rational method
Q = CiA estimates peak stormwater runoff, where Q is flow, C is the runoff coefficient, i is rainfall intensity, and A is the contributing drainage area.
Base flood elevation
The water surface elevation of the 1% annual chance flood, published on FEMA maps and used by local codes to set minimum first-floor heights and freeboard.
Heat island effect
Warmer urban temperatures caused by dark paving and roofs, sparse vegetation, and lost evaporative cooling; mitigated with high-albedo surfaces, trees, and green roofs.
Prevailing wind
The most frequent wind direction at a site, plotted on a wind rose; it drives natural ventilation design, windbreak placement, and pedestrian comfort studies.
Daylight factor
The ratio of interior illuminance at a point to simultaneous exterior illuminance under an unobstructed overcast sky, expressed as a percentage of exterior light.
Phase I ESA
A records review, site reconnaissance, and interviews identifying recognized environmental conditions; typically required before purchase or redevelopment of property with possible contamination.
Distance sound attenuation
In free space, sound level from a point source drops roughly 6 decibels each time the distance to the receiver doubles; barriers and berms add further reduction.
Floor area ratio
Gross building floor area divided by lot area; a zoning control limiting building bulk that operates independently of lot coverage and height limits.
Occupant load factor
A code table value of floor area per person used to compute occupant load, which in turn sizes egress width and exit counts; offices often use 100 sf/person.
Travel distance
The measured length of the egress path from the most remote point of a floor to an exit; the code caps it by occupancy group and construction type.
Common path of egress
The distance an occupant must travel before reaching a point where two independent egress directions become available.
Maximum ramp slope
In accessible routes, ramps may not exceed a 1:12 slope, and each run may rise no more than 30 inches before a level landing is required.
Type of construction
IBC classifications I through V describing the required fire resistance of structural elements; Type I is most fire resistive and Type V least.
Readily achievable barrier removal
The ADA standard for existing buildings: removing architectural barriers that is easily accomplishable and inexpensive without much difficulty or expense.
Nonconforming use
A use predating current zoning that may continue under a grandfather clause, but typically cannot expand and may not resume after extended discontinuance.
Contour interval
The constant vertical distance between adjacent contour lines on a topographic map; closely spaced lines indicate steep slopes and wide spacing indicates flat ground.
Cut and fill
Earthwork balancing soil excavated from the site against soil placed as fill; balanced grading minimizes hauling cost and unnecessary site disturbance.
Easement
A legal right to use another party's land for a specific purpose such as utilities or access; it burdens the site and must appear on the survey.
Metes and bounds
A property description using bearings, distances, and monumented points beginning at a known corner; common in older parcels and plats.
Bearing capacity
The maximum pressure soil can support without shear failure, established by geotechnical borings and used to size footings and determine foundation type.
Building efficiency ratio
Net usable area divided by gross floor area; it expresses how much building area serves the program rather than core, structure, and circulation.
Parking area rule of thumb
A rough planning figure of 300 to 350 square feet per car including drive aisle, used to test site capacity before a parking consultant refines the count.
Wetland delineation
A field survey by a qualified specialist locating wetland boundaries using soils, hydrology, and vegetation; it triggers federal and state permitting and buffer requirements.
Adjacency matrix
A grid scoring required relationships among program spaces; strong, weak, or undesired adjacencies are then translated into a bubble diagram.
Stacking diagram
A vertical arrangement showing which program functions occupy each floor, aligning structure, core locations, and mechanical zones before floor planning begins.
Net to gross
The ratio of assignable program area to total building area, with the difference absorbed by walls, core, circulation, and mechanical space.
Structural bay
The repetitive column spacing of a building frame; it constrains parking module fit, lease span, and the distribution of mechanical and electrical systems.
Lease span
The distance from the core or corridor to the exterior wall; it governs daylight penetration and the practical depth of lettable office space.
Adaptive reuse
Converting an existing building to a new use; it requires verifying floor-to-floor height, structural capacity, and egress against the new program's needs.
Building core
The clustered elevators, egress stairs, restrooms, and mechanical shafts serving every floor, typically occupying 15 to 25 percent of the plate area.
Thermal bridging
A heat flow path that bypasses insulation through framing, slab edges, or ties, lowering effective envelope performance; mitigated by continuous exterior insulation.