Commissioning Authority (CxA)
The individual or entity responsible for planning, organizing, and leading the commissioning process, independent of the design and construction contracts for commissioned systems.
Owner's Project Requirements
A written document describing the functional requirements and expectations of the owner for how the facility and its systems will be used and operated.
Basis of Design
The designer's written record of assumptions, calculations, and decisions that document how the design satisfies the Owner's Project Requirements.
Commissioning Plan
A document defining Cx scope, team roles, schedule, communication protocols, test procedures, and deliverable formats, updated as the project evolves.
ASHRAE Guideline 0
The guideline that describes the commissioning process for new construction, renovation, and existing buildings, defining phases, roles, and deliverables.
ASHRAE Standard 202
The standard specifying minimum commissioning process requirements that can be adopted as code language for new buildings and major renovations.
Pre-design Cx deliverables
Initial Owner's Project Requirements, initial Commissioning Plan, and identification of systems to be commissioned, produced during the pre-design phase.
Design review in Cx
Comparison of the Basis of Design against the Owner's Project Requirements to confirm each requirement is addressed and to flag gaps.
Measurable OPR criteria
Quantitative requirements such as temperature setpoints, ventilation rates, and energy targets that become acceptance benchmarks for functional performance testing.
OPR-BOD discrepancy log
A tracked record of differences between Owner's Project Requirements and Basis of Design, with assigned responsibility and resolution status.
Design review milestones
Checkpoints at schematic design, design development, and construction documents where Cx design review is performed against the OPR.
OPR change control
Owner approval is required to update the OPR; the CxA then evaluates impacts on Cx scope, test procedures, and acceptance criteria.
Cx specification section
Typically Division 01 Section 01 91 00, defining contractor responsibilities, submittals, testing obligations, and schedule impacts for commissioning.
Pre-functional checklist
A document verifying installation, static conditions, and readiness of equipment before functional performance testing, completed by the contractor and verified by the CxA.
Functional performance test
A test demonstrating that systems and components operate interactively and meet the Owner's Project Requirements under specified conditions.
FPT acceptance criteria
Predefined measurable conditions and results that determine whether a functional performance test passes or fails.
FPT test script content
Prerequisites, instrumentation, step-by-step procedures, acceptance criteria, and documentation requirements for a functional performance test.
Failure-mode testing
FPT coverage of alarms, safeties, interlocks, and off-design conditions to confirm the system responds as specified when components fail.
Deficiency log
A tracked record of failed tests and installation issues with responsible party, due date, and retest status until resolution.
FPT prerequisites
Conditions required before functional testing, including completed pre-functional checklists, calibrated instruments, trained operators, and stable system conditions.
Submittal review for Cx
CxA review of product data, shop drawings, and O&M data to confirm equipment and controls meet Basis of Design performance criteria.
Cx schedule requirement
The contractor must submit a construction Cx schedule and testing plan consistent with the Commissioning Plan and project schedule.
Contractor Cx responsibilities
Contractual obligations to participate in Cx activities, provide qualified personnel, complete checklists, and include Cx in subcontractor scopes.
CxA independence requirement
The Commissioning Authority must be independent of the design and construction contracts for commissioned systems to preserve objectivity.
Seasonal testing
Testing performed under conditions not achievable during initial FPT, such as peak heating, peak cooling, and shoulder-season changeover, within the warranty period.
Training verification
Confirmation that operator training occurred, documented through attendance records and evaluation of trainee understanding of operation and maintenance.
Systems manual
A compiled document containing OPR, BOD, equipment data, control sequences, as-built information, O&M procedures, and training records.
Final commissioning report
A document summarizing the Cx process, test results, unresolved issues, deferred seasonal testing, and the CxA's statement of compliance.
Post-acceptance Cx
Warranty-phase activities including seasonal testing completion, resolution of open issues, and periodic reviews of system performance.
Lessons-learned feedback
Information from the Cx process delivered to the owner for improving future projects and ongoing facility operation.
Construction Cx site observation
Periodic CxA site visits during construction to observe installation, track issues, and report progress to the owner.
O&M manual requirement
A specification requirement defining operation and maintenance documentation deliverables so training and documentation are contractually enforceable.