ASSE 5130 study plan
ASSE 5130 · Give each week a clear focus.
8 weeks · About 6 hours per week
Cross-Connection Control Fundamentals and Regulations & Backflow Prevention Assembly Types and Applications
Define cross-connection, backflow, backsiphonage, and backpressure in your own words and diagram each condition
Map the regulatory chain from federal Safe Drinking Water Act authority down to state and local cross-connection programs, listing who enforces what
Classify the five backflow prevention method categories (air gap, RPZ, PVB, DCVA, AVB) by principle of operation and degree of hazard protected
Build a one-page hazard-rating reference that matches containment, isolation, and individual protection strategies to low, moderate, and high hazard scenarios
Your checkpoint
A two-page handwritten reference sheet covering key terms, the regulatory hierarchy, and the five method categories, scored against a self-made 20-item recall quiz at 80% or better
Backflow Prevention Assembly Types and Applications & Testing Procedures and Equipment
Sketch cross-section diagrams of RPZ, DCVA, PVB, AVB, and air gap assemblies labeling every component and its function
Explain the operating sequence of each assembly during normal flow, backsiphonage, and backpressure conditions
Match each assembly type to its allowable installation orientation, pit/underground restrictions, and hazard level
Identify the field-test connection points and test cock numbering on each assembly type from memory
Your checkpoint
A labeled diagram set of all five assembly types with a written normal-flow and failure-mode narrative for each, checked for accuracy against your training manual
Testing Procedures and Equipment
Assemble and zero a differential pressure test kit, verifying gauge calibration, hose condition, and needle movement
Execute the RPZ field test sequence (leakage, check valve 1, check valve 2, relief valve opening point) in correct order while narrating each step
Execute DCVA and PVB test sequences and record readings on a standard test form
Calculate allowable pressure drop values and recognize readings that indicate a failing check valve
Your checkpoint
Three complete practice test forms (one RPZ, one DCVA, one PVB) filled out to form standards with all readings within tolerance and no procedural omissions
Testing Procedures and Equipment & Troubleshooting, Repair, and Maintenance
Diagnose common failure signatures: relief valve dribbling, check valve not holding, and gauge drift, and state the corrective action for each
Disassemble, inspect, and reassemble an RPZ and a DCVA using the correct seat, disc, and O-ring replacement procedure
Perform a timed full test on each assembly type within a realistic field time window
Explain the difference between a field test failure and an installation defect that mimics a test failure
Your checkpoint
A troubleshooting log documenting at least six simulated fault conditions, the symptom observed, the diagnosis, and the corrective repair, plus one timed test per assembly type completed cleanly
Troubleshooting, Repair, and Maintenance & Installation Requirements and Site Surveys
Write the preventive maintenance schedule for each assembly type including inspection frequency and wear-part replacement intervals
Apply installation requirements for elevation, drainage, freeze protection, and accessibility to five different site scenarios
Determine correct assembly sizing and pressure loss considerations for a given flow demand
Identify the required clearances and orientation limits that cause most installation rejections
Your checkpoint
A site-survey checklist and a maintenance schedule template, each applied in writing to three hypothetical installations with a pass/fail installation determination for each
Installation Requirements and Site Surveys & Recordkeeping, Reporting, and Safety
Conduct a mock site survey of a real or imagined facility, locating every cross-connection and assigning a hazard rating
Select the appropriate assembly or method for each identified cross-connection and justify the choice in writing
Draft a complete test report and notification record that meets typical regulatory content requirements
List the personal protective equipment, confined-space, and water-quality safety practices required during testing and repair
Your checkpoint
A full mock site survey report with hazard inventory, recommended protection for each cross-connection, and a completed sample test report and notification form
Troubleshooting, Repair, and Maintenance & Recordkeeping, Reporting, and Safety & Cross-Connection Control Fundamentals and Regulations
Re-test every assembly type under time pressure and document any procedural errors for correction
Review recordkeeping retention rules, reporting timelines, and the consequences of noncompliance
Revisit regulation and liability questions you missed on earlier self-quizzes and close each gap
Practice explaining a failed test result to a property owner in plain language
Your checkpoint
A timed re-test of all five assembly types with zero critical errors, plus a corrected error log showing every previously missed concept resolved
Testing Procedures and Equipment & Backflow Prevention Assembly Types and Applications & Cross-Connection Control Fundamentals and Regulations & Troubleshooting, Repair, and Maintenance & Installation Requirements and Site Surveys & Recordkeeping, Reporting, and Safety
Take two full-length timed practice exams and score each by domain to find remaining weak areas
Drill only the lowest-scoring domain until practice accuracy reaches 85% or better
Recite the critical specifications, tolerances, and regulatory deadlines from memory without notes
Review your error log from all prior weeks and confirm every entry is closed
Your checkpoint
Two completed practice exams with domain score breakdowns, a final one-page cram sheet, and a closed error log with no open items
Milestones
Week 2: Name all five assembly types, their components, and their operating principles from memory with 90% accuracy on a self-quiz
Week 4: Complete one clean field test of each assembly type and correctly diagnose at least five of six seeded faults
Week 6: Produce a complete site survey report and a regulation-compliant test report with no missing required fields
Week 8: Score 85% or higher overall on two timed practice exams with no domain below 75%