ASSE 5130 study materials
ASSE 5130 study resources

ASSE 5130 study plan

ASSE 5130 · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Cross-Connection Control Fundamentals and Regulations & Backflow Prevention Assembly Types and Applications

  • Define cross-connection, backflow, backsiphonage, and backpressure in your own words and diagram each condition

  • Map the regulatory chain from federal Safe Drinking Water Act authority down to state and local cross-connection programs, listing who enforces what

  • Classify the five backflow prevention method categories (air gap, RPZ, PVB, DCVA, AVB) by principle of operation and degree of hazard protected

  • Build a one-page hazard-rating reference that matches containment, isolation, and individual protection strategies to low, moderate, and high hazard scenarios

Your checkpoint

A two-page handwritten reference sheet covering key terms, the regulatory hierarchy, and the five method categories, scored against a self-made 20-item recall quiz at 80% or better

Week 2

Backflow Prevention Assembly Types and Applications & Testing Procedures and Equipment

  • Sketch cross-section diagrams of RPZ, DCVA, PVB, AVB, and air gap assemblies labeling every component and its function

  • Explain the operating sequence of each assembly during normal flow, backsiphonage, and backpressure conditions

  • Match each assembly type to its allowable installation orientation, pit/underground restrictions, and hazard level

  • Identify the field-test connection points and test cock numbering on each assembly type from memory

Your checkpoint

A labeled diagram set of all five assembly types with a written normal-flow and failure-mode narrative for each, checked for accuracy against your training manual

Week 3

Testing Procedures and Equipment

  • Assemble and zero a differential pressure test kit, verifying gauge calibration, hose condition, and needle movement

  • Execute the RPZ field test sequence (leakage, check valve 1, check valve 2, relief valve opening point) in correct order while narrating each step

  • Execute DCVA and PVB test sequences and record readings on a standard test form

  • Calculate allowable pressure drop values and recognize readings that indicate a failing check valve

Your checkpoint

Three complete practice test forms (one RPZ, one DCVA, one PVB) filled out to form standards with all readings within tolerance and no procedural omissions

Week 4

Testing Procedures and Equipment & Troubleshooting, Repair, and Maintenance

  • Diagnose common failure signatures: relief valve dribbling, check valve not holding, and gauge drift, and state the corrective action for each

  • Disassemble, inspect, and reassemble an RPZ and a DCVA using the correct seat, disc, and O-ring replacement procedure

  • Perform a timed full test on each assembly type within a realistic field time window

  • Explain the difference between a field test failure and an installation defect that mimics a test failure

Your checkpoint

A troubleshooting log documenting at least six simulated fault conditions, the symptom observed, the diagnosis, and the corrective repair, plus one timed test per assembly type completed cleanly

Week 5

Troubleshooting, Repair, and Maintenance & Installation Requirements and Site Surveys

  • Write the preventive maintenance schedule for each assembly type including inspection frequency and wear-part replacement intervals

  • Apply installation requirements for elevation, drainage, freeze protection, and accessibility to five different site scenarios

  • Determine correct assembly sizing and pressure loss considerations for a given flow demand

  • Identify the required clearances and orientation limits that cause most installation rejections

Your checkpoint

A site-survey checklist and a maintenance schedule template, each applied in writing to three hypothetical installations with a pass/fail installation determination for each

Week 6

Installation Requirements and Site Surveys & Recordkeeping, Reporting, and Safety

  • Conduct a mock site survey of a real or imagined facility, locating every cross-connection and assigning a hazard rating

  • Select the appropriate assembly or method for each identified cross-connection and justify the choice in writing

  • Draft a complete test report and notification record that meets typical regulatory content requirements

  • List the personal protective equipment, confined-space, and water-quality safety practices required during testing and repair

Your checkpoint

A full mock site survey report with hazard inventory, recommended protection for each cross-connection, and a completed sample test report and notification form

Week 7

Troubleshooting, Repair, and Maintenance & Recordkeeping, Reporting, and Safety & Cross-Connection Control Fundamentals and Regulations

  • Re-test every assembly type under time pressure and document any procedural errors for correction

  • Review recordkeeping retention rules, reporting timelines, and the consequences of noncompliance

  • Revisit regulation and liability questions you missed on earlier self-quizzes and close each gap

  • Practice explaining a failed test result to a property owner in plain language

Your checkpoint

A timed re-test of all five assembly types with zero critical errors, plus a corrected error log showing every previously missed concept resolved

Week 8

Testing Procedures and Equipment & Backflow Prevention Assembly Types and Applications & Cross-Connection Control Fundamentals and Regulations & Troubleshooting, Repair, and Maintenance & Installation Requirements and Site Surveys & Recordkeeping, Reporting, and Safety

  • Take two full-length timed practice exams and score each by domain to find remaining weak areas

  • Drill only the lowest-scoring domain until practice accuracy reaches 85% or better

  • Recite the critical specifications, tolerances, and regulatory deadlines from memory without notes

  • Review your error log from all prior weeks and confirm every entry is closed

Your checkpoint

Two completed practice exams with domain score breakdowns, a final one-page cram sheet, and a closed error log with no open items

Milestones

Week 2: Name all five assembly types, their components, and their operating principles from memory with 90% accuracy on a self-quiz

Week 4: Complete one clean field test of each assembly type and correctly diagnose at least five of six seeded faults

Week 6: Produce a complete site survey report and a regulation-compliant test report with no missing required fields

Week 8: Score 85% or higher overall on two timed practice exams with no domain below 75%