Core Units of Competency - Roof Tiling

  • Safe work at height: for roof work, use a fall-arrest system or guardrail when there is a risk of falling 2 m or more; a 1.8 m lanyard must not allow a free fall that puts the worker below the platform edge.

  • Roof pitch is expressed as a ratio of rise to run (e.g. 1:4 = 14°); pitch determines the minimum lap of sarking and tiles, so verify pitch before selecting materials.

  • Sarking lap rule of thumb: side laps not less than 150 mm and end laps not less than 150 mm, with laps running down-slope so water sheds over the lower sheet.

  • Tile batten spacing is set by the tile manufacturer's gauge; the gauge equals the tile length minus the head lap, and battens must be fixed to each rafter with the specified nail or screw.

  • Load limits: tiled roofs commonly impose 40–60 kg/m² dead load; confirm truss/rafter capacity and keep point loads (stacks of tiles) spread over several rafters.

  • Bedding and pointing mortar for ridge caps is typically a 3:1 sand:cement mix; flexible pointing compounds are used where movement is expected.

  • Flashings: valley, apron, and step flashings must be lapped so the upper element overlaps the lower, with a minimum 150 mm cover and no upward-facing open laps.

  • Hazard controls: asbestos-containing sheeting may be present on re-roofs; stop work and arrange identification/testing before disturbing any suspect sheeting.

  • Quality check: after laying, verify straight ridge lines, even tile courses, correct overhang at eaves (usually 40–50 mm past the fascia), and clear, unobstructed valleys.

Quick reference

Elective Units of Competency - Roof Tiling

  • Terracotta and concrete tiles differ in porosity and weight; terracotta is typically heavier per m², so batten and rafter capacity must be rechecked when substituting tile types.

  • Metal roofing electives: minimum roof slope for corrugated steel is commonly 5° for sheets with end laps, and lower (about 3°) for continuous long-length sheets with no end laps.

  • Wall cladding electives require cavity construction: a drained and ventilated cavity of at least 20 mm behind the cladding, with weep holes and flashings at the base.

  • Waterproofing electives: a shower recess membrane must extend at least 150 mm above the floor and 25 mm above the hob, with the floor graded 1:80 to 1:100 to the waste.

  • Estimating: tile quantity = roof area ÷ (tile coverage per m²) × (1 + wastage); allow 5–10% wastage for hips, valleys, and cuts.

  • Scaffolding electives: a working platform must be at least 450 mm wide, and guardrails top rail 900–1100 mm with a mid-rail and toe board.

  • Solar/roof penetration electives: every penetration needs a dektite or collar flashing matched to the pipe diameter and roof pitch, sealed to the tile profile.

  • Restoration electives: repointing is required where mortar has eroded more than about 10 mm; re-bed only after removing loose mortar and wetting the substrate.