- Minimum fall-arrest trigger
- Fall protection is required where a person could fall 2 m or more; systems include guardrails, scaffolds, and harnesses anchored to a rated point.
- Roof pitch ratio
- Pitch is rise over run, such as 1:4, and it sets minimum sarking laps and the tile and flashing types permitted for the roof.
- Sarking side lap
- Adjacent sarking sheets overlap at least 150 mm, with the upper sheet lapped over the lower so water runs down and away.
- Batten gauge
- Batten spacing equals tile length minus head lap; it must match the manufacturer's gauge so each course covers the tile below.
- Roof dead load
- Tiled roofs typically add 40 to 60 kg per square metre; confirm rafter and truss capacity before laying and spread tile stacks.
- Ridge cap mortar mix
- Ridge and hip caps are bedded in a stiff sand and cement mortar, commonly three parts sand to one part cement, or a flexible compound.
- Flashing lap rule
- Flashings are lapped so the higher element overlaps the lower by at least 150 mm, and no lap faces upward to collect water.
- Asbestos stop-work rule
- Suspect sheeting on older roofs must not be cut or disturbed; stop work and arrange identification and testing before proceeding.
- Eave overhang check
- Tiles usually project 40 to 50 mm past the fascia; too little causes water tracking back, too much risks breakage and poor appearance.
- Valley clearance
- Valley gutters must stay clear of tile and mortar so runoff is unobstructed; blockages cause backup and leaks under tiles.
- Tile head lap purpose
- The head lap is the overlap of one course over the next; it sheds water and its size depends on roof pitch and tile profile.
- Ladder safety ratio
- A leaning ladder is set at a 4:1 ratio, one unit out for every four units up, and secured at the top before use.
- Manual handling limit
- Team lifting is required when a load is too heavy or awkward for one person; tiles are handled in small, balanced stacks.
- Roof plan reading
- Plans show pitch, ridge and valley lines, penetration positions, and batten layout; check them before setting out any battens.
- Tile cutting control
- Cut tiles with a wet saw or score-and-break tool; wear eye and hearing protection and control silica dust with water or extraction.
- Terracotta versus concrete
- Terracotta tiles are fired clay and typically heavier and more porous than concrete tiles, which affects batten and rafter loading.
- Steel roof minimum pitch
- Corrugated steel commonly needs about 5 degrees with end laps, and roughly 3 degrees for continuous long sheets without end laps.
- Cladding cavity depth
- A drained and ventilated cavity of at least 20 mm sits behind wall cladding, with weep holes and base flashings for drainage.
- Shower membrane height
- Waterproofing extends at least 150 mm above the floor and 25 mm above the hob, with the floor graded toward the waste.
- Floor fall to waste
- Wet-area floors are graded between 1:80 and 1:100 to the waste so water drains and does not pond on the membrane.
- Tile quantity formula
- Tiles needed equal roof area divided by coverage per square metre, multiplied by one plus wastage, usually five to ten percent.
- Scaffold platform width
- A working platform is at least 450 mm wide, with a top guardrail at 900 to 1100 mm, a mid-rail, and a toe board.
- Penetration flashing
- Each pipe or vent penetration uses a collar or dektite flashing sized to the pipe and pitch, sealed against the tile profile.
- Repointing trigger
- Repointing is needed where ridge mortar has eroded about 10 mm or more; remove loose mortar and wet the surface before re-bedding.
- Wall cladding fixing
- Cladding is fixed to framing through the cavity with corrosion-rated fasteners at the manufacturer's spacing, allowing for movement.
- Gutter slope
- Gutters fall toward the outlet, commonly about 1:500, so water drains and does not stand and corrode the gutter.
- Downpipe sizing
- Downpipe capacity is matched to the roof catchment area and rainfall intensity; undersized downpipes cause overflow at the gutter.
- Insulation placement
- Roof insulation sits on the ceiling with clearance from downlights and flues; sarking may act as a radiant barrier beneath tiles.
- Skylight flashing
- Skylights use a proprietary flashing kit matched to roof pitch and profile, lapped into the tile courses above and below.
- Wet-area leak test
- After the membrane cures, the floor is flooded and left standing to check for leaks before tiling proceeds over it.
- Roof ventilation
- Ventilation at ridge and eaves reduces condensation under the roof; blocked vents cause moisture damage to battens and framing.
- Site waste handling
- Broken tiles and offcuts are separated for recycling or disposal, and silica dust and mortar waste are contained on site.