High Risk Work Licence - Concrete Placing Boom (PB) study materials
High Risk Work Licence - Concrete Placing Boom (PB) study resources

High Risk Work Licence - Concrete Placing Boom (PB) cheat sheet

High Risk Work Licence - Concrete Placing Boom (PB) · Keep the key ideas within reach.

Quick reference

Legislation, standards and duty of care

  • A concrete placing boom (PB) is high risk work; the operator must hold a current PB licence for the boom's configuration, and employers must verify it before allowing operation.

  • Primary duty holders: the person conducting a business or undertaking (PCBU) must ensure health and safety so far as reasonably practicable; officers exercise due diligence; workers take reasonable care and follow safe systems.

  • PCBUs must manage risks using the hierarchy of control: eliminate, substitute, engineer, administratively control, then PPE as the last line.

  • High risk work licensing requires written evidence of competency, and licences must be produced on request to an inspector or employer.

  • Designers, manufacturers, importers and suppliers must ensure plant is safe and without risks when used as intended, including adequate information and guarding.

  • Registration or notification requirements may apply to certain plant; the PB must be inspected and maintained per the manufacturer and applicable plant regulations.

  • Consultation with workers and their representatives is mandatory when identifying hazards and making decisions about risk controls.

  • Incident notification: serious injuries, dangerous incidents and fatalities must be reported to the regulator within the prescribed timeframe (commonly 24-48 hours depending on jurisdiction).

  • Records of licences, inspections, maintenance, training and risk assessments must be retained and made available to regulators.

Quick reference

Hazard identification, risk assessment and control

  • Key PB hazards: contact with overhead power lines, boom collapse or structural failure, overturning, crushing during setup, concrete hose whip, falls from height, and manual handling.

  • Overhead power line control: maintain the legislated exclusion distance (e.g., 4 m for low voltage, greater for high voltage) and use spotters; de-energise or isolate where possible.

  • Risk assessment formula: risk = likelihood × consequence; controls must reduce risk to as low as reasonably practicable (ALARP).

  • Ground bearing pressure must be checked against the outrigger load and soil bearing capacity; use mats or pads if the ground is soft or unknown.

  • Exclusion zones under and around the boom must be barricaded; no personnel under the boom or concrete discharge area.

  • Wind speed limits: stop operations when wind exceeds the manufacturer's rated limit (commonly 20 m/s or 38 km/h for many booms); monitor with an anemometer.

  • Concrete hose whip and blockages can cause serious injury; use whip checks and never stand in line with a pressurised hose.

  • Fatigue, heat stress and noise are common environmental hazards; manage with rotation, hydration and hearing protection.

Quick reference

Concrete placing boom types, components and terminology

  • Types: truck-mounted boom (boom pump), separate placing boom on a mast or tower, and trailer-mounted or stationary booms.

  • Articulating sections are called the boom; the number of sections (e.g., 3, 4, 5) determines reach and flexibility.

  • Key components: pedestal or turret, slewing ring, boom sections, hydraulic rams, outriggers, counterweight, hopper, and delivery pipes.

  • The concrete pump (piston or rotor) delivers concrete through the pipeline to the boom's end hose.

  • Reach is measured as horizontal and vertical reach from the slew centre; the load chart is specific to the boom configuration.

  • The end hose is typically 3-5 m long and must be secured with a safety sling or whip check.

  • Slew, luff (raise/lower) and telescope are the primary boom motions; each has rated speed and limits.

  • Outriggers transfer load to the ground; the outrigger spread and pad size determine the effective bearing area.

  • The pipeline must be earthed or bonded where required, and the boom must be kept clear of electrical conductors.

Quick reference

Pre-operational inspection, setup and stabilisation

  • Pre-start checks: hydraulic fluid levels, leaks, hose condition, structural cracks, pin and bolt security, outrigger pads, tyre condition and pressure, and safety devices.

  • Verify the load chart, radius indicator, anemometer, horn, lights and emergency stop function before operation.

  • Setup: position the boom on firm, level ground; extend outriggers fully on pads; check the spirit level is within tolerance.

  • Ground bearing: confirm the soil bearing capacity exceeds the calculated outrigger pressure; use timber or steel mats to spread load.

  • Check for overhead power lines, underground services, excavations and slopes within the boom's reach and outrigger footprint.

  • Barricade the exclusion zone; confirm the concrete supply, washout area and access routes are clear.

  • Complete a documented pre-operational checklist and record any defects; do not operate if a safety-critical defect is found.

  • Ensure the boom is not set up over excavations, trenches or recently filled ground without engineering verification.

Quick reference

Operating principles, boom movements and safe positioning

  • Operate the boom smoothly; avoid sudden starts and stops that cause load swing and hose whip.

  • Keep the boom within the rated load chart for the current configuration; never exceed the maximum radius or capacity.

  • Position the boom so the end hose is over the pour area; avoid dragging the hose through concrete or over obstructions.

  • Maintain communication with the pour crew and spotter; stop immediately if the signal is unclear or personnel enter the exclusion zone.

  • Never allow personnel to ride on the boom or end hose; never use the boom as a crane or hoist.

  • Keep the boom clear of power lines, structures, scaffolding and other plant; maintain the legislated exclusion distances.

  • Monitor wind, ground conditions and outrigger stability continuously; stop if conditions change.

  • When finished, retract and stow the boom per the manufacturer's sequence and wash out the pipeline safely.

Quick reference

Load charts, capacities, reach and stability calculations

  • The load chart gives the maximum allowable load at a given radius and boom configuration; always use the chart for the specific boom model.

  • Moment (stability) = load × radius; overturning occurs when the load moment exceeds the counterweight and base moment.

  • Outrigger load = (total weight × distance to centre of gravity) / outrigger base dimension; check against ground bearing capacity.

  • Ground bearing pressure (kPa) = outrigger load (kN) / pad area (m²); increase pad area to reduce pressure.

  • Reach is the horizontal distance from the slew centre to the end hose; capacity decreases as radius increases.

  • The boom's own weight, pipeline and concrete in the pipe must be included in the load calculation.

  • Never add counterweight or modify the boom; stability depends on the manufacturer's design.

  • If the load chart is missing or illegible, do not operate until the correct chart is obtained.

Quick reference

Communication, signal systems and teamwork

  • Standard signals: hand signals, radio, or whistle; the operator must stop when a signal is unclear.

  • Only one designated signal person should direct the operator; all others must relay through that person.

  • Radio communication must be tested before the pour; use a dedicated channel and clear, standard phrases.

  • The spotter monitors the boom, exclusion zone, power lines and ground conditions, and has authority to stop the operation.

  • Emergency stop signal: any person may give a stop signal; the operator must comply immediately.

  • Communication must continue throughout the pour; loss of communication means stop until restored.

  • Brief the pour crew on the exclusion zone, hose handling and emergency procedures before starting.

Quick reference

Emergency procedures, incident response and shutdown

  • Emergency stop: activate the E-stop, stop the pump, and lower the boom to a safe position if possible.

  • Power line contact: keep everyone clear, do not touch the machine, call the electricity authority, and evacuate to the safe distance.

  • Boom collapse or structural failure: evacuate the area, isolate the machine, and do not re-enter until made safe by a competent person.

  • Injury or fatality: provide first aid, call emergency services, secure the scene, and notify the regulator within the required timeframe.

  • Fire: use the appropriate extinguisher, shut down the pump and hydraulics, and evacuate if the fire cannot be controlled.

  • Hydraulic hose failure: stop the pump, lower the boom safely, and isolate the hydraulic system before repair.

  • Post-incident: preserve evidence, record statements, and do not return the machine to service until inspected and cleared.

  • Shutdown sequence: stop the pump, wash out the pipeline, retract and stow the boom, lower outriggers, and secure the machine.

Quick reference

Maintenance, inspection and defect reporting

  • Daily pre-start inspection is required before each use; record the results and any defects.

  • Periodic inspections (e.g., monthly, quarterly, annual) must follow the manufacturer's schedule and applicable regulations.

  • Structural welds, pins, bolts, hydraulic hoses, slew ring and outriggers are critical inspection points.

  • Safety devices (limit switches, radius indicators, anemometer, E-stop) must be tested and functional.

  • Defects must be reported to the supervisor and recorded; safety-critical defects require the machine to be tagged out and removed from service.

  • Maintenance must be performed by competent persons using manufacturer-approved parts and procedures.

  • Records of maintenance, repairs and inspections must be retained and available for review.

  • Do not operate a machine with an expired inspection or an unresolved safety-critical defect.

Quick reference

Environmental and site-specific considerations

  • Ground conditions: check for soft spots, voids, excavations, underground services and recently filled ground before setup.

  • Weather: monitor wind speed, lightning, heavy rain and temperature; stop operations when conditions exceed limits.

  • Overhead and underground services: locate and mark all services; maintain exclusion distances and use spotters.

  • Site access: ensure adequate space for the boom, outriggers, concrete trucks and washout; plan traffic management.

  • Washout: contain concrete washout to prevent environmental contamination; never discharge to stormwater.

  • Noise and dust: manage with appropriate controls and monitor exposure for workers and neighbours.

  • Public safety: barricade the exclusion zone and keep the public clear of the boom and discharge area.

  • Environmental spills: contain and report fuel or hydraulic oil spills per site procedures.