High Risk Work Licence - Concrete Placing Boom (PB) study materials
High Risk Work Licence - Concrete Placing Boom (PB) study resources

High Risk Work Licence - Concrete Placing Boom (PB) study plan

High Risk Work Licence - Concrete Placing Boom (PB) · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Operating principles, boom movements and safe positioning & Legislation, standards and duty of care

  • Explain how boom articulation, slewing and luffing change the load radius during a pour

  • Identify the duty-of-care obligations of the boom operator, the concrete pump operator and the site supervisor

  • Describe the legislative hierarchy that applies to concrete placing boom work and name the key instruments

  • Map three realistic scenarios where unsafe boom positioning breaches a duty of care

Your checkpoint

A one-page annotated diagram of boom movements linked to the duty-of-care holder for each movement

Week 2

Operating principles, boom movements and safe positioning & Hazard identification, risk assessment and control

  • Demonstrate the correct sequence for unfolding, positioning and folding a placing boom

  • Identify at least ten hazards specific to boom operation and rank them using a risk matrix

  • Apply the hierarchy of risk control to three of the highest-ranked hazards

  • Explain how to maintain safe clearance from powerlines, structures and personnel

Your checkpoint

A completed risk register with at least ten hazards, ratings and controls

Week 3

Concrete placing boom types, components and terminology & Pre-operational inspection, setup and stabilisation

  • Label the major components of a placing boom and state the function of each

  • Describe the difference between truck-mounted, trailer-mounted and stationary boom configurations

  • Perform a pre-operational inspection checklist in the correct order and record defects

  • Explain the setup and stabilisation requirements including outrigger deployment and ground bearing checks

Your checkpoint

A signed-off pre-operational inspection checklist completed against a simulated machine

Week 4

Load charts, capacities, reach and stability calculations & Pre-operational inspection, setup and stabilisation

  • Read a load chart and determine safe capacity at a given radius and boom configuration

  • Calculate the effect of counterweight, outrigger spread and ground conditions on stability

  • Identify the point at which a lift or reach becomes unsafe and state the corrective action

  • Explain how wind loading and concrete surcharge alter effective capacity

Your checkpoint

Worked solutions to five load-chart and stability problems with a written justification for each answer

Week 5

Communication, signal systems and teamwork & Emergency procedures, incident response and shutdown

  • Demonstrate standard hand signals and radio protocols used during a concrete pour

  • Describe how to establish and maintain communication between the operator, spotter and pour crew

  • Outline the emergency procedures for powerline contact, hydraulic failure and boom collapse

  • Explain the shutdown sequence after a normal pour and after an incident

Your checkpoint

A written communication plan and emergency response flowchart for a simulated pour

Week 6

Maintenance, inspection and defect reporting & Hazard identification, risk assessment and control

  • Distinguish between daily, periodic and major inspections and state who performs each

  • Describe how to report a defect and the process for tagging out defective equipment

  • Apply risk assessment to maintenance tasks including working at height and hydraulic isolation

  • Explain record-keeping requirements for inspections and maintenance

Your checkpoint

A defect report and maintenance log entry for three simulated faults

Week 7

Environmental and site-specific considerations & Legislation, standards and duty of care

  • Identify environmental factors including wind, heat, rain and ground conditions that affect boom operation

  • Describe site-specific considerations such as exclusion zones, traffic management and public safety

  • Explain how environmental conditions interact with legislative obligations to cease work

  • Outline the requirements for operating near live services and on sloping ground

Your checkpoint

An environmental and site-specific risk assessment for a pour in adverse conditions

Week 8

Legislation, standards and duty of care & Hazard identification, risk assessment and control & Concrete placing boom types, components and terminology & Pre-operational inspection, setup and stabilisation & Operating principles, boom movements and safe positioning & Load charts, capacities, reach and stability calculations & Communication, signal systems and teamwork & Emergency procedures, incident response and shutdown & Maintenance, inspection and defect reporting & Environmental and site-specific considerations

  • Complete a full-length practice exam under timed conditions

  • Review every incorrect answer and write a corrective note for each

  • Revisit the two weakest domains and summarise key points from memory

  • Confirm readiness against the assessment criteria for each domain

Your checkpoint

A timed practice exam result with a written review of all errors

Milestones

Week 2: Achieve at least 80% on a self-marked quiz covering boom movements and hazard control

Week 4: Correctly solve four of five load-chart and stability problems without reference material

Week 6: Produce a complete inspection, defect-reporting and maintenance record set for a simulated machine

Week 8: Score at least 85% on the timed practice exam with no domain below 70%