High Risk Work Licence - Concrete Placing Boom (PB) flashcards
High Risk Work Licence - Concrete Placing Boom (PB) · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- PB licence requirement
- A concrete placing boom operator must hold a current high risk work licence for the boom type; employers must verify the licence before allowing operation.
- Primary duty of care
- The PCBU must ensure health and safety so far as reasonably practicable, including providing safe plant, training, supervision and safe systems of work.
- Hierarchy of control
- Risk controls ranked from most to least effective: eliminate, substitute, engineer, administrative, then PPE as the last line of defence.
- Risk assessment formula
- Risk equals likelihood multiplied by consequence; controls must reduce risk to as low as reasonably practicable before work proceeds.
- Overhead power line distance
- Legislated exclusion distances apply near power lines (commonly 4 m for low voltage and greater for high voltage); de-energise or isolate where possible.
- Wind speed limit
- Stop boom operations when wind exceeds the manufacturer's rated limit, commonly 20 m/s or 38 km/h; monitor with an anemometer.
- Truck-mounted boom
- A concrete placing boom mounted on a truck chassis with outriggers, used for mobile pumping and placing of concrete on site.
- Separate placing boom
- A boom mounted on a mast or tower independent of the pump, used where access is restricted or a fixed placing position is required.
- Slew ring
- The bearing that allows the turret and boom to rotate horizontally; it must be inspected for wear, cracks and loose bolts.
- End hose
- The flexible hose at the boom tip, typically 3-5 m long, secured with a safety sling or whip check to prevent uncontrolled movement.
- Pre-start inspection
- A documented check of fluids, leaks, structure, pins, outriggers, tyres and safety devices before each use; defects must be recorded.
- Outrigger setup
- Extend outriggers fully onto pads on firm level ground; confirm the spirit level is within tolerance before raising the boom.
- Ground bearing pressure
- Outrigger load in kilonewtons divided by pad area in square metres gives pressure in kilopascals; increase pad area to reduce pressure.
- Load chart use
- The load chart gives maximum allowable load at a given radius and boom configuration; never exceed the rated capacity for the current setup.
- Stability moment
- Moment equals load multiplied by radius; overturning occurs when the load moment exceeds the resisting moment of the base and counterweight.
- Boom reach definition
- Reach is the horizontal distance from the slew centre to the end hose; capacity decreases as radius increases.
- Smooth boom operation
- Operate the boom smoothly to avoid sudden starts and stops that cause load swing, hose whip and structural stress on the boom.
- No personnel under boom
- No personnel may stand under the boom or in the concrete discharge area; barricade the exclusion zone before the pour begins.
- Boom not a crane
- Never use the concrete placing boom as a crane or hoist, and never allow personnel to ride on the boom or end hose.
- Designated signal person
- Only one designated signal person should direct the operator; all others relay through that person to avoid conflicting signals.
- Stop signal authority
- Any person may give a stop signal; the operator must comply immediately and not resume until the signal is cleared.
- Radio communication test
- Test radio communication before the pour, use a dedicated channel, and stop work if communication is lost until it is restored.
- Emergency stop procedure
- Activate the emergency stop, stop the pump, and lower the boom to a safe position if possible before evacuating and calling for help.
- Power line contact response
- Keep everyone clear, do not touch the machine, call the electricity authority, and evacuate to the safe distance until declared safe.
- Incident notification
- Serious injuries, dangerous incidents and fatalities must be reported to the regulator within the prescribed timeframe, commonly 24-48 hours.
- Daily inspection record
- The daily pre-start inspection must be documented and retained; safety-critical defects require the machine to be tagged out and removed from service.
- Critical inspection points
- Structural welds, pins, bolts, hydraulic hoses, slew ring and outriggers are critical inspection points requiring competent person assessment.
- Defect reporting
- Defects must be reported to the supervisor and recorded; safety-critical defects require the machine to be removed from service until repaired.
- Ground condition check
- Before setup, check for soft spots, voids, excavations, underground services and recently filled ground that could reduce bearing capacity.
- Concrete washout control
- Contain concrete washout to prevent environmental contamination; never discharge washout water to stormwater drains or waterways.
- Public exclusion zone
- Barricade the exclusion zone and keep the public clear of the boom and discharge area throughout the pour.
- Site access planning
- Plan site access for the boom, outriggers, concrete trucks and washout, and implement traffic management before the pour begins.