NSW Plumbing Licence study plan
NSW Plumbing Licence · Give each week a clear focus.
8 weeks · About 6 hours per week
Plumbing, draining and gasfitting
Map every Domain 1 topic area (sanitary drainage, water supply, gasfitting, ventilation, fixture connection) into a personal checklist with a confidence rating from 1 to 5
Explain the purpose and sizing logic of the sanitary drainage system, including fixture unit loading, trap seals and venting, in your own written notes
Solve 25 practice calculations on drain sizing, grade and fall, and record the method used for each
List the key compliance checks an inspector makes on a below-ground drainage installation before backfill
Your checkpoint
A 3-page Domain 1 summary sheet plus a scored 25-question self-test with every wrong answer corrected and annotated
Plumbing, draining and gasfitting
Describe the water supply system from meter to fixture, covering pressure, backflow prevention and cross-connection control
Compare the requirements for gas pipe sizing, purging and pressure testing across typical domestic installations
Diagnose five given fault scenarios (gurgling traps, poor hot water delivery, gas pressure drop) and write the likely cause and remedy for each
Draft a one-page inspection sequence for rough-in and fit-off stages of a combined plumbing and gasfitting job
Your checkpoint
A written fault-diagnosis portfolio of 10 scenarios with cause, remedy and the standard or clause that governs each
Roof plumbing
Break roof plumbing into its component systems: roof catchment, gutters, downpipes, flashing, sarking, rainwater disposal and overflow
Calculate catchment area, rainfall intensity and required gutter and downpipe capacity for three worked examples
Sketch the correct flashing detail for an abutment, a valley and a penetration, and label every layer
Identify the common causes of roof leaks and ponding and state the installation fix for each
Your checkpoint
A set of three fully worked roof drainage sizing calculations with sketched flashing details and a labelled leak-cause table
Roof plumbing
Explain the correct sequence for installing and testing a rainwater tank, overflow and charged system
Describe the requirements for metal roof sheeting, fixings, thermal movement and sarking in your own words
Complete a 30-question Domain 2 practice set under timed conditions
Review every incorrect answer and link it back to the relevant installation principle
Your checkpoint
A timed 30-question Domain 2 test scored at 80 percent or better, with a written correction log
Medical gas and mechanical services
Outline the medical gas chain of responsibility, from source to outlet, and the roles of the installer, verifier and certifier
Explain the identification, labelling, brazing and purge-testing requirements that distinguish medical gas work from general gasfitting
Describe the commissioning and verification documentation required before a medical gas system is handed over
Summarise the mechanical services essentials: ductwork, chilled and heating water, condensate drainage and plant connections
Your checkpoint
A two-page medical gas and mechanical services comparison chart covering materials, testing, identification and documentation requirements
Medical gas and mechanical services
Work through five medical gas non-conformance scenarios and state the corrective action and reporting obligation for each
Explain the pressure testing and leak testing regime for medical gas pipelines and how it differs from natural gas testing
Describe how condensate drainage and mechanical plant connections interact with the plumbing and drainage systems
Complete a 30-question Domain 3 practice set and record the reasoning for each answer
Your checkpoint
A 30-question Domain 3 practice set completed with a written justification for every answer and a list of knowledge gaps
Disconnection and reconnection of fixed electrical equipment
Define what counts as fixed electrical equipment for disconnection and reconnection and where the plumbing licence boundary sits
Explain safe isolation procedure, verification of de-energisation, tagging and the limits of work permitted without a full electrical licence
Describe the testing and documentation required before reconnecting equipment such as a storage water heater, pump or ducted unit
Identify the hazards of working near electrical installations in wet areas and state the controls for each
Your checkpoint
A one-page safe isolation and reconnection procedure with a checklist of tests, tags and records required before re-energising
Plumbing, draining and gasfitting & Roof plumbing & Medical gas and mechanical services & Disconnection and reconnection of fixed electrical equipment
Sit two full-length timed practice exams covering all four domains and record the score for each domain
Revisit the two weakest domains and rewrite the summary sheets for those areas from memory
Consolidate all four domain summary sheets into a single revision pack with the highest-risk facts highlighted
Build a final-week routine that revisits calculations, compliance checks and documentation requirements daily
Your checkpoint
A consolidated four-domain revision pack plus two scored mock exams with a written improvement plan for the final days
Milestones
Week 2: Score at least 75 percent on a self-written 40-question Domain 1 test and explain every drainage and gasfitting calculation without notes
Week 4: Score at least 80 percent on the timed Domain 2 test and produce all three roof drainage sizing calculations correctly
Week 6: Score at least 80 percent on the Domain 3 practice set and correctly state the medical gas verification and documentation requirements from memory
Week 7: Demonstrate the safe isolation and reconnection procedure end to end on paper, including every test, tag and record
Week 8: Achieve at least 80 percent overall on both full-length mock exams with no domain below 70 percent