Quick reference

Arizona Statutes, Rules, and Contractor Licensing

  • A.R.S. § 32-1151 requires a contractor's license issued by the Registrar of Contractors (ROC) to bid or contract for work totaling $1,000 or more in labor and materials.

  • License classifications pair a scope letter with a trade number: R = residential, C = commercial, L = dual; the air conditioning and refrigeration trade number is 39, so R-39, C-39, and L-39 are the HVAC licenses.

  • A written complaint must be filed with the ROC within two years after the act or omission that caused the alleged damage.

  • A.R.S. § 12-552 imposes an eight-year statute of repose on latent construction defects, running from the date of substantial completion.

  • Residential contractors must maintain a surety bond and pay into the Residential Contractors' Recovery Fund; bond or fund problems are grounds for license suspension.

  • The license number must appear on all advertising, bids, contracts, and permits issued to the contractor.

  • A home solicitation sale (contract signed at the buyer's residence) carries a three-business-day right of cancellation.

  • Unlicensed contracting is a class 1 misdemeanor on a first offense and may be elevated to a class 6 felony on a subsequent offense.

Quick reference

Refrigeration Theory, Refrigerants, and System Components

  • One ton of refrigeration = 12,000 Btu/h = 200 Btu/min, roughly the heat absorbed by melting one ton of ice in 24 hours.

  • Saturation temperature is the boiling/condensing temperature for a given pressure; superheat = actual vapor temperature minus saturation temperature at the same pressure.

  • Subcooling = saturation temperature at condensing pressure minus liquid-line temperature, measured at the condenser outlet.

  • Sensible load: Q = 1.08 × CFM × ΔT. Latent load: Q = 0.68 × CFM × Δgrains. Total load: Q = 4.5 × CFM × Δh.

  • The four required components of any vapor-compression circuit are compressor, condenser, metering device, and evaporator.

  • Metering devices: fixed orifice/piston (charge-critical, superheat varies with load), TXV (modulates to hold constant superheat), and electronic expansion valve (EEV, controlled by a stepper motor).

  • R-410A is a near-azeotropic 50/50 blend of R-32 and R-125 with zero ozone-depletion potential; typical pressures are about 118 psig at 40°F evaporating and 317 psig at 100°F condensing.

  • Latent heat of vaporization of water is about 1,070 Btu/lb at 32°F and about 970 Btu/lb at 212°F; condensate removal therefore drives a large share of the latent load.

Quick reference

HVAC Equipment: Heating, Cooling, and Ventilation Units

  • AFUE is the seasonal efficiency of fuel-fired heating equipment: about 80% for atmospheric non-condensing furnaces and 90%+ for condensing units.

  • A condensing furnace adds a secondary heat exchanger that condenses flue-gas water vapor, produces acidic condensate requiring a trap and neutralizer, and vents in PVC.

  • Heat pump balance point is the outdoor temperature where compressor capacity equals building heat loss; below that point supplemental heat must make up the difference.

  • Defrost is initiated by coil temperature, time, or demand controls and is terminated by coil temperature or pressure; the auxiliary heat is energized during defrost to temper supply air.

  • Gas manifold pressure is typically 3.5 in. w.c. for natural gas and 10-11 in. w.c. for propane, verified with a manometer.

  • Nameplate temperature rise must bracket the measured supply-minus-return temperature difference; a rise above the range signals low airflow.

  • Nominal airflow is 400 CFM per ton; 350 CFM per ton is used where greater latent removal is wanted in humid climates.

  • Direct evaporative coolers lower dry-bulb temperature by adding moisture and are effective in low-humidity Arizona climates; effectiveness is typically 70-85%.

Quick reference

Electrical Systems, Motors, and Controls

  • Ohm's law: V = I × R. Power: P = V × I = I² × R. Any two known values determine the third.

  • Branch-circuit conductors, disconnects, and controllers must be sized at not less than 125% of the motor's nameplate full-load current.

  • Running overload protection is separate from branch short-circuit protection and is sized from the nameplate or the manufacturer's published data.

  • An equipment disconnecting means must be installed within sight of the equipment and generally within 50 feet.

  • Low-voltage control wiring is Class 2: R to W energizes heat, R to Y energizes cooling, R to G energizes the indoor fan, and C is the common.

  • A PSC motor has a run capacitor in the start winding and no centrifugal switch; an ECM is a brushless DC motor that maintains programmed airflow as static pressure changes.

  • Start and run capacitors are rated in microfarads, usually with a tolerance of ±6% to ±10%; a bulged or leaking case means replacement.

  • GFCI protection is required for receptacles in garages, basements, outdoors, and within 6 feet of a sink.

Quick reference

Ductwork, Air Distribution, and Ventilation

  • Equal friction duct sizing holds pressure drop constant, commonly 0.1 in. w.c. per 100 feet of effective length, along the longest run.

  • External static pressure is the sum of supply and return static measured at the air handler; most residential units are rated at 0.5 in. w.c. total.

  • Typical velocities: supply trunk 700-900 fpm, branch ducts 400-600 fpm, return grille face 300-500 fpm.

  • Flex duct must be fully extended and supported; each bend should have a centerline radius of at least one duct diameter, and sag greatly increases resistance.

  • ACCA Manual D sizes the duct system; Manual T selects and locates registers, grilles, and diffusers.

  • Nominal airflow is 400 CFM per ton of cooling capacity, and room-by-room airflows should come from the Manual J room loads.

  • Duct joints should be sealed with mastic or listed tape; leaks in attic ducts in Arizona add both sensible and latent load to the equipment.

  • Return air must be ducted from each pressure-balanced zone; a single central return can starve rooms with closed doors.

Quick reference

Piping, Tubing, Brazing, and Soldering

  • Copper-to-copper joints are brazed with 5% silver-phosphorus filler (silfos) without flux; brass, steel, or dissimilar joints require flux and higher-silver filler such as 15%.

  • A low flow of dry nitrogen (about 2-3 CFM) is passed through the tubing during brazing to displace oxygen and prevent internal copper oxide scale.

  • ACR copper is cleaned, purged, and capped at the factory; refrigeration-grade tubing should be used instead of plumbing-grade copper.

  • Evacuation standard for a new system is 500 microns or lower, held with the pump isolated to confirm the vacuum does not rise.

  • Triple evacuation uses nitrogen breaks between pulls to remove moisture from the system.

  • Suction-line oil traps are installed at the base and top of long vertical risers, roughly every 15-20 feet of rise, to return oil to the compressor.

  • Suction lines are insulated with closed-cell insulation of at least 3/4-inch wall to prevent condensation and capacity loss.

  • Flare fittings must be made with refrigerant-rated tools and torqued to the manufacturer's specification with a torque wrench, not by feel.

Quick reference

Load Calculation, System Sizing, and Design Principles

  • ACCA Manual J calculates room-by-room loads, Manual S selects the equipment, Manual D sizes the ducts, and Manual T selects the air-distribution devices.

  • Total load = sensible load + latent load; equipment is selected on total capacity, and the equipment sensible heat ratio must match the calculated SHR.

  • SHR = sensible load ÷ total load; an oversized unit with a high SHR leaves the space humid because runtime is too short to remove moisture.

  • Design temperatures come from ASHRAE or Manual J tables; summer design dry-bulb values above 100°F apply across most of Arizona.

  • Infiltration is estimated from construction tightness, blower-door ACH50, or Manual J default values rather than guesswork.

  • Air density falls with altitude; at 5,000 feet the density correction factor is about 0.83, and gas heating input is derated roughly 4% per 1,000 feet above sea level.

  • Duct gain and loss must be added when ducts run through attics, which is standard practice in Arizona and can add significant load.

  • The "one ton per 500 square feet" shortcut is not a load calculation and routinely produces oversized equipment.

Quick reference

Jobsite and Occupational Safety

  • EPA Section 608 certification is required to purchase refrigerant and service appliances: Type I small appliances, Type II high pressure, Type III low pressure, or Universal.

  • A refrigerant recovery cylinder must never be filled above 80% of its water capacity; the fill is controlled by weight on a scale.

  • Liquid refrigerant contacting skin causes frostbite; PPE includes goggles or a face shield, gloves, and long sleeves, and refrigerant vapor displaces oxygen in enclosed spaces.

  • OSHA fall protection is triggered at 6 feet in construction and 4 feet in general industry, using guardrails, personal fall arrest, or nets.

  • Ladder setup uses the 4:1 rule (1 foot out per 4 feet of height) and the ladder must extend 3 feet above the landing surface.

  • Lockout/tagout requires the disconnect to be opened, locked, tagged, and the circuit verified dead with a meter before work begins.

  • Nitrogen cylinders require a pressure regulator; full cylinder pressure (about 2,200 psi) will rupture refrigerant tubing if applied directly.

  • Heat illness prevention in Arizona heat uses water, rest, shade, and gradual acclimatization, with work/rest cycles adjusted to temperature.

Quick reference

Business Management, Estimating, and Project Administration

  • Gross margin % = (price − cost) ÷ price × 100; markup % = (price − cost) ÷ cost × 100. A 25% margin equals a 33.3% markup.

  • Break-even volume = fixed overhead ÷ gross margin ratio; labor should be priced using a burdened rate (wage × a burden factor of roughly 1.25-1.45).

  • An Arizona preliminary 20-day notice must be given within 20 days of first furnishing labor or materials to preserve mechanics' lien rights on a project.

  • Only a written, signed change order modifies contract scope, price, or schedule; unbilled extra work is generally uncollectible.

  • Retainage of 5-10% is commonly withheld until substantial or final completion and must be tracked in the project budget.

  • Cash flow depends on progress billing schedules, material deposits, and the timing of supplier and subcontractor payments.