BiH Engineering & Architecture Licensure Exam flashcards
BiH Engineering & Architecture Licensure Exam · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Chamber licence requirement
- In Bosnia and Herzegovina, engineers and architects must hold an entity chamber licence to sign designs or supervise works. Practicing unlicensed is a punishable misdemeanour under entity construction laws.
- Conflict of interest rule
- A licensed professional may not review, certify, or approve work in which they, their employer, or a close associate holds a financial interest. Disclosure and withdrawal are required.
- Professional liability insurance
- Designers and supervisors carry liability for defects arising from their professional error. Insurance covers such claims and is often a condition for public procurement participation and chamber practice.
- Design resistance formula
- Eurocode design resistance is R_d = R_k/γ_M, where R_k is the characteristic resistance and γ_M the material partial factor. The ultimate limit state requires the design effect E_d ≤ R_d.
- Degree of static indeterminacy
- For a plane frame, the degree of indeterminacy equals (3m + r) − (3j + c), where m is members, r reactions, j joints, and c released conditions. A zero result means the structure is statically determinate.
- Second-order effects threshold
- Global second-order (P-Δ) effects may be neglected only when the elastic critical load factor α_cr is at least 10. Below that threshold, amplified or full second-order analysis is required.
- Seismic behaviour factor q
- The behaviour factor q reduces elastic seismic forces to account for ductile energy dissipation. Higher q assumes greater ductility, and capacity design then enforces a ductile failure hierarchy.
- Terzaghi bearing capacity equation
- Drained ultimate bearing capacity is q_ult = c'·N_c + q'·N_q + 0.5·γ'·B·N_γ. Bearing capacity factors depend on the friction angle; undrained clay uses N_c about 5.14.
- Effective stress principle
- Effective stress equals total stress minus pore water pressure: σ' = σ − u. Strength and stiffness parameters c', φ', and E' are expressed in effective terms for drained soil conditions.
- Consolidation settlement formula
- For normally consolidated clay, one-dimensional settlement is S = C_c/(1+e_0)·H·log10((σ'_0+Δσ)/σ'_0). C_c is the compression index, H the layer thickness, and σ'_0 the initial effective stress.
- Liquefaction susceptibility screening
- Saturated loose sands below the water table with corrected blow counts (N1)60 below roughly 15–20 and groundwater shallower than about 10 m are potentially liquefiable under strong earthquake shaking.
- Concrete cylinder-cube strength relation
- Characteristic cylinder strength is approximately 0.8 times characteristic cube strength: f_ck,cyl ≈ 0.8·f_ck,cube. Design strength is f_cd = α_cc·f_ck/γ_C with γ_C about 1.5.
- Proctor compaction acceptance
- The Proctor test gives maximum dry density and optimum moisture content. Field compaction is accepted when measured dry density reaches typically 95–98 percent of the Proctor maximum at controlled moisture.
- Rebar tensile test outputs
- A reinforcing steel tensile test yields the yield strength R_eH, the tensile strength R_m, and elongation at maximum force A. These values must meet the declared class, for example B500B.
- Concrete conformity testing
- Concrete strength conformity per EN 206 is assessed on groups of cube or cylinder results using characteristic strength criteria and a minimum individual result, not on a single specimen alone.
- Thermal transmittance U-value
- Thermal transmittance is U = 1/R_total, where R_total sums layer resistances d/λ plus surface resistances. Lower U means better insulation; national rules set maximum U-values per element.
- Glaser interstitial condensation check
- The Glaser method compares vapour pressure with saturation pressure across each layer of an assembly. If vapour pressure exceeds saturation, interstitial condensation occurs; a warm-side vapour barrier is the usual remedy.
- Ventilation heat loss formula
- Ventilation heat loss is Q_v = ρ·c_p·V̇·ΔT, where V̇ is airflow rate and ΔT the indoor-outdoor temperature difference. Mechanical heat recovery reduces the effective loss substantially.
- Energy performance certificate classes
- An energy performance certificate rates a building from A (best) to G (worst) using primary energy and CO2 indicators. Nearly zero-energy building targets apply to new construction.
- Floor area ratio
- Floor area ratio equals total gross floor area divided by plot area. Together with the built-up area coefficient and height limits, it controls development intensity under the urbanistic plan.
- Accessibility ramp slope limit
- Accessible ramps are limited to about 1:20 slope, with steeper 1:12 permitted only for short runs. Landings, handrails, tactile guidance, and minimum clear widths are also required.
- Spatial plan hierarchy in BiH
- Planning documents run from state and entity spatial plans through cantonal and municipal spatial plans to detailed urbanistic (regulatory) plans. Each lower level must conform to the higher-level plan.
- Total float in CPM
- Total float equals latest start minus earliest start, or latest finish minus earliest finish. Activities with zero total float lie on the critical path and determine project duration.
- Earned value indices
- Cost performance index is EV/AC and schedule performance index is EV/PV. A value below 1.0 signals cost overrun or schedule slippage respectively; above 1.0 indicates favourable performance.
- Inspection and test plan
- An inspection and test plan defines hold points, witness points, and records for each construction activity. Non-conformities are logged and must be closed before handover.
- Horizontal curve radius formula
- Minimum horizontal curve radius is R = V²/(127·(e + f)), where V is design speed in km/h, e the superelevation, and f the side friction factor. Vertical curves rely on stopping sight distance.
- Rational method runoff
- For small catchments, peak runoff is Q = C·i·A, where C is the runoff coefficient, i rainfall intensity, and A catchment area. Urban drainage design return periods are typically 2–10 years.
- Self-cleansing sewer velocity
- Wastewater sewers should reach about 0.6–1.0 m/s at minimum flow to avoid solids deposition, while avoiding excessive scour at peak flow. Design flow adds peak factor and infiltration to dry-weather flow.
- Hierarchy of safety controls
- Risk controls are applied in order: eliminate the hazard, substitute, use engineering controls, apply administrative controls, and finally personal protective equipment as the last line of defence.
- Excavation shoring threshold
- Excavations deeper than about 1.5 m require shoring, battering, or another engineered support. Daily inspection, edge protection, and keeping spoil back from the edge are mandatory.
- Passive and active fire protection
- Passive measures include compartmentation, fire doors, and protected escape routes; active measures include detection, sprinklers, and hydrants. Structural fire resistance is rated in minutes such as R 60.
- Environmental impact assessment trigger
- Major projects require EIA screening and, where applicable, a full environmental impact assessment with public consultation before approval. Mitigation measures become binding permit conditions.