Structural Analysis and Design
Draw shear-force and bending-moment diagrams for simply supported, cantilever, and overhanging beams under point, uniform, and triangular loads without reference notes
Compute reactions and internal forces for statically indeterminate beams and frames using the force method and moment distribution
State and apply the equilibrium, compatibility, and constitutive relations that underlie every structural solution
Set up a personal one-page formula sheet covering beam diagrams, section properties, and deflection formulas
Your checkpoint
A worked problem set of 12 solved beam and frame problems (diagrams, reactions, and internal-force values) plus the one-page formula sheet, checked against at least two independent solutions
Structural Analysis and Design
Design a rectangular reinforced-concrete beam in bending and shear to a recognized code, showing every check
Explain the difference between ultimate limit state and serviceability limit state and compute a deflection check
Identify the failure modes of steel tension members, columns, and bolted/welded connections and select the governing check
Compare timber, masonry, steel, and concrete members qualitatively on strength, stiffness, and ductility
Your checkpoint
A design calculation package for one concrete beam and one steel column (loads, factored forces, member sizing, and all limit-state checks) with a short written justification of each governing mode
Geotechnical Engineering and Foundations
Classify soils by grain size and plasticity and derive the classification from a given gradation curve and Atterberg limits
Compute effective stress profiles with and without a water table and explain the principle of effective stress
Calculate bearing capacity of a shallow footing and check settlement against a permissible limit
Select a foundation type (spread footing, pile, raft) for three contrasting site descriptions and justify each choice
Your checkpoint
A site assessment report for a hypothetical three-layer soil profile: classification, effective-stress profile, bearing-capacity calculation, settlement estimate, and a recommended foundation type with justification
Professional Ethics, Legal Framework, and Practice Regulation & Architectural Design, Planning, and Urbanism
Outline the professional duties of the licensed engineer/architect regarding competence, conflict of interest, and public safety
Describe the typical legal path from design to building permit to occupancy and name the documents required at each stage
Draft a scope-of-services and fee proposal for a small residential project that allocates responsibility clearly
Apply basic urban planning parameters (plot ratio, coverage, setbacks, access) to a hypothetical parcel and test compliance
Your checkpoint
A complete mock project file for a small building: scope of services, fee proposal, permit-stage checklist, and a one-page compliance table showing plot ratio, coverage, and setback calculations against assumed zoning limits
Construction Materials, Testing, and Quality Control & Building Physics, Services, and Energy Efficiency
Design a concrete mix and a testing regime (slump, cube strength, sampling frequency) that meets a stated exposure class
Interpret a set of non-conforming test results and decide on acceptance, retest, or rejection with reasons
Compute a whole-building heat-loss estimate and check it against an energy-performance target
Explain the physics of moisture, condensation, and thermal bridging and propose a detail that avoids each problem
Your checkpoint
A quality-control dossier for one concrete pour (mix design, sampling plan, acceptance criteria, and a decision on a simulated failing result) plus a heat-loss and condensation-risk summary for a simple room
Construction Technology, Organization, and Management & Occupational Safety, Fire Protection, and Environmental Protection
Build a critical-path schedule for a small building and identify the float on each activity
Prepare a site layout and sequencing plan that accounts for access, storage, and crane or delivery constraints
Identify the principal occupational hazards for excavation, work at height, and lifting, and specify a control for each
Outline the fire-safety strategy for a multi-storey building: means of escape, compartmentation, and structural fire resistance
List the environmental-protection obligations on a construction site (dust, noise, waste, water) and the monitoring that proves compliance
Your checkpoint
An integrated construction plan for a small building: CPM schedule with float, site layout sketch, hazard register with controls, and a fire-safety and environmental-compliance summary
Public Infrastructure, Transportation, and Water Systems
Compute the capacity of a simple water-supply or drainage system and check it against design demand
Explain the design logic of a road cross-section (lanes, shoulders, drainage, pavement layers) and size the pavement for a stated traffic load
Describe how stormwater runoff is estimated and how a retention or infiltration measure reduces peak flow
Identify the interfaces between a building project and public infrastructure (connections, rights of way, utilities) and the approvals each requires
Your checkpoint
A one-page infrastructure brief for a hypothetical development: water demand and pipe sizing, stormwater runoff estimate with a retention measure, road cross-section parameters, and a list of utility approvals needed
Professional Ethics, Legal Framework, and Practice Regulation & Structural Analysis and Design & Geotechnical Engineering and Foundations & Construction Materials, Testing, and Quality Control & Building Physics, Services, and Energy Efficiency & Architectural Design, Planning, and Urbanism & Construction Technology, Organization, and Management & Public Infrastructure, Transportation, and Water Systems & Occupational Safety, Fire Protection, and Environmental Protection
Complete two full-length timed mock exams under exam conditions and score them by domain
Diagnose the three weakest domains from mock results and close each gap with targeted practice
Recite from memory the key formulas and code-based limits flagged as high-frequency across all domains
Assemble a final one-page summary sheet per domain for last-week review
Your checkpoint
Two scored mock exams with a written error analysis (domain scores, error causes, corrective actions) and nine one-page domain summary sheets
Milestones
Week 2: Can solve an unseen beam and an unseen member-design problem end to end within 20 minutes each, with all limit-state checks shown
Week 4: Can produce a permit-stage checklist and a zoning-compliance table for an unseen parcel without notes, scoring at least 80% on a self-made 20-question quiz covering domains 1 and 6
Week 6: Can build a CPM network with correct float and list fire-safety and hazard controls for an unseen project scenario, scoring at least 75% on a self-made 25-question quiz covering domains 4, 5, 7, and 9
Week 8: Achieved at least 70% overall on both timed mock exams with no single domain below 60%, and every diagnosed weak area has a documented corrective action