BiH Engineering & Architecture Licensure Exam study materials
BiH Engineering & Architecture Licensure Exam study resources

BiH Engineering & Architecture Licensure Exam study plan

BiH Engineering & Architecture Licensure Exam · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Structural Analysis and Design

  • Draw shear-force and bending-moment diagrams for simply supported, cantilever, and overhanging beams under point, uniform, and triangular loads without reference notes

  • Compute reactions and internal forces for statically indeterminate beams and frames using the force method and moment distribution

  • State and apply the equilibrium, compatibility, and constitutive relations that underlie every structural solution

  • Set up a personal one-page formula sheet covering beam diagrams, section properties, and deflection formulas

Your checkpoint

A worked problem set of 12 solved beam and frame problems (diagrams, reactions, and internal-force values) plus the one-page formula sheet, checked against at least two independent solutions

Week 2

Structural Analysis and Design

  • Design a rectangular reinforced-concrete beam in bending and shear to a recognized code, showing every check

  • Explain the difference between ultimate limit state and serviceability limit state and compute a deflection check

  • Identify the failure modes of steel tension members, columns, and bolted/welded connections and select the governing check

  • Compare timber, masonry, steel, and concrete members qualitatively on strength, stiffness, and ductility

Your checkpoint

A design calculation package for one concrete beam and one steel column (loads, factored forces, member sizing, and all limit-state checks) with a short written justification of each governing mode

Week 3

Geotechnical Engineering and Foundations

  • Classify soils by grain size and plasticity and derive the classification from a given gradation curve and Atterberg limits

  • Compute effective stress profiles with and without a water table and explain the principle of effective stress

  • Calculate bearing capacity of a shallow footing and check settlement against a permissible limit

  • Select a foundation type (spread footing, pile, raft) for three contrasting site descriptions and justify each choice

Your checkpoint

A site assessment report for a hypothetical three-layer soil profile: classification, effective-stress profile, bearing-capacity calculation, settlement estimate, and a recommended foundation type with justification

Week 4

Professional Ethics, Legal Framework, and Practice Regulation & Architectural Design, Planning, and Urbanism

  • Outline the professional duties of the licensed engineer/architect regarding competence, conflict of interest, and public safety

  • Describe the typical legal path from design to building permit to occupancy and name the documents required at each stage

  • Draft a scope-of-services and fee proposal for a small residential project that allocates responsibility clearly

  • Apply basic urban planning parameters (plot ratio, coverage, setbacks, access) to a hypothetical parcel and test compliance

Your checkpoint

A complete mock project file for a small building: scope of services, fee proposal, permit-stage checklist, and a one-page compliance table showing plot ratio, coverage, and setback calculations against assumed zoning limits

Week 5

Construction Materials, Testing, and Quality Control & Building Physics, Services, and Energy Efficiency

  • Design a concrete mix and a testing regime (slump, cube strength, sampling frequency) that meets a stated exposure class

  • Interpret a set of non-conforming test results and decide on acceptance, retest, or rejection with reasons

  • Compute a whole-building heat-loss estimate and check it against an energy-performance target

  • Explain the physics of moisture, condensation, and thermal bridging and propose a detail that avoids each problem

Your checkpoint

A quality-control dossier for one concrete pour (mix design, sampling plan, acceptance criteria, and a decision on a simulated failing result) plus a heat-loss and condensation-risk summary for a simple room

Week 6

Construction Technology, Organization, and Management & Occupational Safety, Fire Protection, and Environmental Protection

  • Build a critical-path schedule for a small building and identify the float on each activity

  • Prepare a site layout and sequencing plan that accounts for access, storage, and crane or delivery constraints

  • Identify the principal occupational hazards for excavation, work at height, and lifting, and specify a control for each

  • Outline the fire-safety strategy for a multi-storey building: means of escape, compartmentation, and structural fire resistance

  • List the environmental-protection obligations on a construction site (dust, noise, waste, water) and the monitoring that proves compliance

Your checkpoint

An integrated construction plan for a small building: CPM schedule with float, site layout sketch, hazard register with controls, and a fire-safety and environmental-compliance summary

Week 7

Public Infrastructure, Transportation, and Water Systems

  • Compute the capacity of a simple water-supply or drainage system and check it against design demand

  • Explain the design logic of a road cross-section (lanes, shoulders, drainage, pavement layers) and size the pavement for a stated traffic load

  • Describe how stormwater runoff is estimated and how a retention or infiltration measure reduces peak flow

  • Identify the interfaces between a building project and public infrastructure (connections, rights of way, utilities) and the approvals each requires

Your checkpoint

A one-page infrastructure brief for a hypothetical development: water demand and pipe sizing, stormwater runoff estimate with a retention measure, road cross-section parameters, and a list of utility approvals needed

Week 8

Professional Ethics, Legal Framework, and Practice Regulation & Structural Analysis and Design & Geotechnical Engineering and Foundations & Construction Materials, Testing, and Quality Control & Building Physics, Services, and Energy Efficiency & Architectural Design, Planning, and Urbanism & Construction Technology, Organization, and Management & Public Infrastructure, Transportation, and Water Systems & Occupational Safety, Fire Protection, and Environmental Protection

  • Complete two full-length timed mock exams under exam conditions and score them by domain

  • Diagnose the three weakest domains from mock results and close each gap with targeted practice

  • Recite from memory the key formulas and code-based limits flagged as high-frequency across all domains

  • Assemble a final one-page summary sheet per domain for last-week review

Your checkpoint

Two scored mock exams with a written error analysis (domain scores, error causes, corrective actions) and nine one-page domain summary sheets

Milestones

Week 2: Can solve an unseen beam and an unseen member-design problem end to end within 20 minutes each, with all limit-state checks shown

Week 4: Can produce a permit-stage checklist and a zoning-compliance table for an unseen parcel without notes, scoring at least 80% on a self-made 20-question quiz covering domains 1 and 6

Week 6: Can build a CPM network with correct float and list fire-safety and hazard controls for an unseen project scenario, scoring at least 75% on a self-made 25-question quiz covering domains 4, 5, 7, and 9

Week 8: Achieved at least 70% overall on both timed mock exams with no single domain below 60%, and every diagnosed weak area has a documented corrective action