Conflict of Interest

A situation in which an engineer's or architect's personal, financial, or family interest could improperly influence professional judgment, requiring disclosure and withdrawal from the affected decision.

Related: Professional Secrecy, Independence of Judgment
Professional Secrecy

The duty to keep confidential all client information, project data, and business details learned during professional work, releasing them only with consent or where law requires disclosure.

Related: Conflict of Interest, Code of Ethics
Code of Ethics

The published set of binding principles governing conduct of licensed engineers and architects, covering competence, honesty, public safety priority, fair competition, and respect for the profession's reputation.

Related: Professional Secrecy, Independence of Judgment
Independence of Judgment

The obligation to make technical decisions solely on professional grounds, free from pressure by clients, contractors, employers, or political actors that could compromise safety or quality.

Related: Conflict of Interest, Code of Ethics
Scope of Authorized Practice

The legally defined set of activities a licensed professional may perform, distinguishing reserved engineering and architectural work from tasks open to unlicensed technicians or contractors.

Related: Professional Seal, Licensure by Examination
Professional Seal

The registered stamp and signature applied to drawings and reports, certifying that the licensed professional prepared or supervised the work and accepts technical responsibility for it.

Related: Scope of Authorized Practice, Design Responsibility
Licensure by Examination

The process of obtaining the legal right to practice through verified education, supervised experience, and passing a state examination, after which the professional is entered in the public register.

Related: Scope of Authorized Practice, Continuing Professional Development
Continuing Professional Development

The mandatory accumulation of training hours, courses, and technical updates required to renew a professional licence and keep knowledge current with codes and technology.

Related: Licensure by Examination, Design Responsibility
Design Responsibility

The designer's legal duty for the adequacy, safety, and buildability of the design, including correction of errors discovered during construction and participation in acceptance of completed works.

Related: Professional Seal, Supervision of Works
Limit State Design

A design method verifying that a structure will not become unfit for use, checking ultimate states such as collapse and serviceability states such as excessive deflection or cracking under factored loads.

Related: Load Combination, Partial Safety Factor
Load Combination

A prescribed arrangement of simultaneous actions, with factors applied to permanent, variable, and accidental loads, used to verify a structure for a specific design situation.

Related: Limit State Design, Partial Safety Factor
Partial Safety Factor

A multiplier applied to loads or material strengths to cover uncertainty, variability, and the consequences of failure, producing design values used in limit state verification.

Related: Limit State Design, Load Combination
Seismic Base Shear

The total horizontal force assumed at the base of a structure during an earthquake, derived from the structure's mass, period, and the design spectral acceleration.

Related: Ductility Class, Limit State Design
Ductility Class

A classification of a structure's capacity to deform inelastically without collapse, which sets the permitted behaviour factor and detailing requirements in seismic design.

Related: Seismic Base Shear, Limit State Design
Bearing Capacity

The maximum pressure a foundation soil or rock can sustain without shear failure or excessive settlement, usually expressed as an allowable or design value per unit area.

Related: Settlement, Standard Penetration Test
Settlement

The downward movement of a foundation caused by compression of the supporting ground under load, assessed for both total magnitude and differential effects on the structure.

Related: Bearing Capacity, Liquefaction
Standard Penetration Test

An in-situ test in which a split-spoon sampler is driven into the ground by a falling hammer, the blow count indicating soil density and strength for foundation design.

Related: Bearing Capacity, Liquefaction
Liquefaction

Loss of soil strength when saturated loose sands or silts build up pore water pressure during shaking and behave temporarily like a liquid, damaging foundations and buried services.

Related: Settlement, Standard Penetration Test
Retaining Wall Earth Pressure

The lateral force exerted by retained soil on a wall, evaluated as active, at-rest, or passive depending on the wall's permitted movement and drainage conditions.

Related: Bearing Capacity, Settlement
Concrete Strength Class

A designation of concrete by its characteristic compressive cylinder or cube strength at 28 days, used as the basis for structural calculations and conformity assessment.

Related: Conformity Control, Water-Cement Ratio
Water-Cement Ratio

The mass ratio of water to cementitious material in a concrete mix, which strongly governs strength, permeability, and durability of the hardened concrete.

Related: Concrete Strength Class, Conformity Control
Conformity Control

The planned sampling and testing regime, including acceptance criteria and identity testing of delivered materials, used to demonstrate that construction meets specified requirements.

Related: Concrete Strength Class, Compaction Test
Compaction Test

A laboratory procedure determining the maximum dry density and optimum moisture content of soil or aggregate, used to set field compaction targets and acceptance limits.

Related: Conformity Control, Bearing Capacity
Thermal Transmittance

The rate of heat flow through a building element per unit area and temperature difference, combining all layers and surface resistances, expressed in watts per square metre kelvin.

Related: Thermal Bridging, Energy Performance Certificate
Thermal Bridging

A localized path of higher heat loss where geometry or materials create a break in insulation, such as balcony slabs or window lintels, increasing total building heat demand.

Related: Thermal Transmittance, Energy Performance Certificate
Energy Performance Certificate

A document rating a building's energy use and carbon emissions against a defined scale, required at sale or lease and accompanied by cost-effective improvement recommendations.

Related: Thermal Transmittance, Ventilation Rate
Ventilation Rate

The volume of outdoor air supplied to a space per unit time, set to control indoor pollutants, moisture, and carbon dioxide while limiting energy loss through conditioning.

Related: Energy Performance Certificate, Smoke Control System
Floor Area Ratio

The ratio of total gross floor area of a building to the area of the plot on which it stands, used by zoning rules to control development intensity.

Related: Building Line, Urban Plan
Building Line

A regulation line, set back from the plot boundary or street axis, beyond which a building may not project, controlling street width and frontage character.

Related: Floor Area Ratio, Urban Plan
Urban Plan

A legally binding document allocating land uses, densities, infrastructure corridors, and protected areas within a municipality, to which individual building permits must conform.

Related: Floor Area Ratio, Building Line
Building Permit

The official authorization issued after review of design documentation, allowing construction to begin and confirming the project complies with planning and technical regulations.

Related: Urban Plan, Supervision of Works
Critical Path Method

A scheduling technique identifying the longest chain of dependent activities, which determines project duration and where delay directly extends completion.

Related: Work Breakdown Structure, Supervision of Works
Work Breakdown Structure

A hierarchical decomposition of the project into manageable packages of work, forming the basis for cost estimating, scheduling, and assignment of responsibility.

Related: Critical Path Method, Bill of Quantities
Bill of Quantities

An itemized schedule of measured work quantities prepared from drawings, used for tendering, valuation of variations, and interim payment certificates.

Related: Work Breakdown Structure, Supervision of Works
Supervision of Works

The professional oversight of construction to verify conformity with design, specifications, and quality plans, including inspection, testing, and instruction on defects.

Related: Design Responsibility, Conformity Control
Hydraulic Grade Line

The profile of pressure head plus elevation along a pipeline or channel, showing where pressure falls below atmospheric and indicating the risk of cavitation or air entry.

Related: Stormwater Attenuation, Design Storm
Design Storm

A hypothetical rainfall event of specified depth, duration, and return period used to size drainage and flood protection works for an accepted level of risk.

Related: Stormwater Attenuation, Hydraulic Grade Line
Stormwater Attenuation

Temporary storage of surface runoff in tanks, basins, or porous areas so that discharge into receiving water is slowed to a permitted peak rate.

Related: Design Storm, Hydraulic Grade Line
Smoke Control System

An engineered arrangement of barriers, vents, or fans that keeps escape routes clear of smoke by limiting its spread or extracting it during a fire.

Related: Fire Compartment, Ventilation Rate
Fire Compartment

A space enclosed by fire-resisting walls, floors, and doors that limits fire and smoke spread for a defined period, allowing occupants to escape and firefighting to proceed.

Related: Smoke Control System, Emergency Egress Route
Emergency Egress Route

A continuous protected path from any point in a building to a place of safety, meeting requirements for travel distance, width, lighting, and door operation.

Related: Fire Compartment, Smoke Control System