BTEB Electrician (EIM) Exam study materials
BTEB Electrician (EIM) Exam study resources

BTEB Electrician (EIM) Exam case studies

BTEB Electrician (EIM) Exam · Put your knowledge to work in context.

The BTEB Electrician (EIM) credential is a Bangladeshi technical trade qualification awarded through the Bangladesh Technical Education Board for people who install, maintain and repair electrical wiring and equipment. It suits trainees leaving a technical school or polytechnic electrician course, apprentices working under a licensed electrician, and practising helpers who want formal recognition of their skills. The BTEB Electrician (EIM) Exam case studies are 5 cases and about 2,437 words.

1

RCD Tripping After a Kitchen Extension

A 230 V single-phase domestic installation has a 30 mA Type AC RCD protecting four final circuits: kitchen sockets, a ring final in the dining room, an outdoor lighting circuit, and an immersion heater. After a new dishwasher and a water heater were installed, the RCD trips intermittently, often at night and sometimes when nothing is switched on.

518 words, about 3 min
2

Cable Sizing for a Workshop Submain

A workshop is fed from a distribution board 38 m away by a three-core armoured cable clipped direct to a wall for 22 m, then in thermal insulation for 8 m, then in free air for 8 m. The load is a 400 V three-phase motor circuit drawing 45 A at full load with a starting current of six times full load for 8 seconds.

519 words, about 3 min
3

Motor Keeps Tripping Its Overload After a Rewind

A 15 kW, 400 V, three-phase, four-pole induction motor driving a conveyor is returned from a rewind. On restart it runs for about 12 minutes, then the thermal overload relay trips.

437 words, about 2 min
4

Neutral and Earth Combined in a Sub-board

During a periodic inspection of a small retail unit, you open a sub-distribution board fed from the main board by a four-core SWA cable. The sub-board has a separate earth bar, but you notice a short link between the neutral bar and the earth bar.

475 words, about 2 min
5

PLC-Controlled Pump Will Not Start After Sensor Replacement

A wastewater transfer pump is controlled by a PLC. The start condition is: high-level float AND low-level float NOT active AND no overload trip AND selector in AUTO.

488 words, about 2 min