BICSI Installer 2 Fiber study materials
BICSI Installer 2 Fiber study resources

BICSI Installer 2 Fiber study plan

BICSI Installer 2 Fiber · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Fiber Optic Theory and Transmission Principles

  • Define and correctly use core fiber terms: core, cladding, buffer, strength member, jacket, and numerical aperture

  • Calculate decibel loss and power budgets from given milliwatt and dBm values without a calculator aid

  • Compare multimode (OM1–OM5) and single-mode transmission behavior, including modal dispersion and attenuation at 850/1300/1310/1550 nm

  • Diagram the paths of light through step-index versus graded-index fiber and explain how each affects bandwidth

Your checkpoint

A one-page handwritten formula and term sheet plus 15 self-written worked power-budget problems, all scored at 90 percent or better on a self-check

Week 2

Fiber Optic Theory and Transmission Principles & Fiber Optic Cables, Components, and Hardware

  • Select the correct fiber cable type and jacket rating for a described environment (riser, plenum, outdoor, aerial, direct-burial)

  • Identify the internal construction layers of a loose-tube and tight-buffered cable from a written description and state the purpose of each

  • Match connector styles (LC, SC, ST, MPO) and polish geometries (PC, UPC, APC) to their typical applications and mating rules

  • Explain bend radius, crush resistance, and tensile rating as cable specifications and how each number is used on the job

Your checkpoint

A cable-and-connector selection matrix covering 10 realistic installation scenarios, each with a justified choice and a cited specification reason

Week 3

Fiber Optic Cables, Components, and Hardware & Cable Installation Practices (Pulling, Routing, and Support)

  • Plan a cable route that respects conduit fill, bend radius, and separation from power conductors

  • Sequence the steps of an indoor pull: pre-survey, pull planning, lubricant choice, tension monitoring, and slack management

  • Describe correct support hardware and spacing for horizontal and backbone cable, including J-hooks, trays, and innerduct

  • Explain how to protect fiber during aerial and underground installation, including messenger attachment and conduit placement

Your checkpoint

A written pull plan for a hypothetical two-floor building run that names hardware, support spacing, expected tension limits, and bend-radius checkpoints

Week 4

Cable Installation Practices (Pulling, Routing, and Support) & Splicing, Termination, and Connectorization

  • Demonstrate the mechanical splice and fusion splice sequences from memory, stating the purpose of each cleaning and cleaving step

  • Evaluate a cleave and splice-loss result and decide whether to accept, re-cleave, or re-splice

  • Prepare cable ends for termination: jacket stripping lengths, buffer removal, and strength-member trimming

  • Install and polish or field-terminate one connector style following a published procedure without skipping a step

Your checkpoint

A documented practice session log with at least five splices and three terminations, recording measured loss for each and a pass or fail judgment against a target threshold

Week 5

Splicing, Termination, and Connectorization

  • Assemble a complete termination kit list for a given connector type and explain what each tool is used for

  • Diagnose common termination defects such as air gaps, end-face scratches, epoxy voids, and offset cores from a written symptom description

  • Apply the correct inspection criteria for connector end-faces and decide pass or fail

  • Explain the difference in handling and loss expectations between field-installable, splice-on, and pigtail termination methods

Your checkpoint

A troubleshooting table of 10 termination defects, each with visible symptoms, likely cause, and corrective action, plus a complete tool and materials list for one connector type

Week 6

Testing, Measurement, and Troubleshooting

  • Set up and explain the reference method for an OLTS test, including one-jumper versus three-jumper referencing

  • Compute a link loss budget and compare measured results against it to declare pass or fail

  • Interpret OTDR traces by identifying events, splices, reflective connectors, and the end of fiber

  • Distinguish between testing for loss, length, and polarity, and select the right instrument for each

Your checkpoint

A completed test report for a practice link containing reference method used, measured loss per strand, calculated budget, OTDR event summary, and a pass or fail conclusion

Week 7

Testing, Measurement, and Troubleshooting & Safety, Codes, Standards, and Job Documentation

  • Apply laser safety, eye protection, and fiber-shard handling rules to a described work area and list the specific controls required

  • Identify the code and standard sources that govern installation, grounding, and fire-rated cable selection, and state what each covers

  • Explain confined-space, ladder, and elevated-work precautions relevant to a fiber installation

  • Produce job documentation that records as-built routing, test results, and labeling

Your checkpoint

A safety and documentation packet for one mock job: hazard list with controls, required labeling scheme, and a completed as-built and test-results summary

Week 8

Fiber Optic Theory and Transmission Principles & Fiber Optic Cables, Components, and Hardware & Cable Installation Practices (Pulling, Routing, and Support) & Splicing, Termination, and Connectorization & Testing, Measurement, and Troubleshooting & Safety, Codes, Standards, and Job Documentation

  • Re-derive every formula from memory and re-solve missed problems from weeks 1 through 7

  • Complete timed practice sets weighted to the published domain percentages and log the score per domain

  • Review the personal error log and rewrite the ten most-missed concepts in your own words

  • Rehearse the full installation workflow from survey to closeout as a single narrative without notes

Your checkpoint

A full-length timed practice exam score report by domain, plus a final one-page review sheet that lists every concept still flagged for review

Milestones

Week 2: Score 85 percent or better on a 25-question self-test covering domains 1 and 2, and correctly justify cable and connector choices in all 10 matrix scenarios

Week 4: Complete five splices and three terminations with documented loss values, and explain each pull-plan decision in the week 3 deliverable without referring to notes

Week 6: Produce a passing test report for a practice link using correct reference method and budget comparison, and correctly identify every event on a practice OTDR trace

Week 8: Score 80 percent or better overall on the timed practice exam with no single domain below 75 percent