BICSI Installer 2 Fiber study plan
BICSI Installer 2 Fiber · Give each week a clear focus.
8 weeks · About 7 hours per week
Fiber Optic Theory and Transmission Principles
Define and correctly use core fiber terms: core, cladding, buffer, strength member, jacket, and numerical aperture
Calculate decibel loss and power budgets from given milliwatt and dBm values without a calculator aid
Compare multimode (OM1–OM5) and single-mode transmission behavior, including modal dispersion and attenuation at 850/1300/1310/1550 nm
Diagram the paths of light through step-index versus graded-index fiber and explain how each affects bandwidth
Your checkpoint
A one-page handwritten formula and term sheet plus 15 self-written worked power-budget problems, all scored at 90 percent or better on a self-check
Fiber Optic Theory and Transmission Principles & Fiber Optic Cables, Components, and Hardware
Select the correct fiber cable type and jacket rating for a described environment (riser, plenum, outdoor, aerial, direct-burial)
Identify the internal construction layers of a loose-tube and tight-buffered cable from a written description and state the purpose of each
Match connector styles (LC, SC, ST, MPO) and polish geometries (PC, UPC, APC) to their typical applications and mating rules
Explain bend radius, crush resistance, and tensile rating as cable specifications and how each number is used on the job
Your checkpoint
A cable-and-connector selection matrix covering 10 realistic installation scenarios, each with a justified choice and a cited specification reason
Fiber Optic Cables, Components, and Hardware & Cable Installation Practices (Pulling, Routing, and Support)
Plan a cable route that respects conduit fill, bend radius, and separation from power conductors
Sequence the steps of an indoor pull: pre-survey, pull planning, lubricant choice, tension monitoring, and slack management
Describe correct support hardware and spacing for horizontal and backbone cable, including J-hooks, trays, and innerduct
Explain how to protect fiber during aerial and underground installation, including messenger attachment and conduit placement
Your checkpoint
A written pull plan for a hypothetical two-floor building run that names hardware, support spacing, expected tension limits, and bend-radius checkpoints
Cable Installation Practices (Pulling, Routing, and Support) & Splicing, Termination, and Connectorization
Demonstrate the mechanical splice and fusion splice sequences from memory, stating the purpose of each cleaning and cleaving step
Evaluate a cleave and splice-loss result and decide whether to accept, re-cleave, or re-splice
Prepare cable ends for termination: jacket stripping lengths, buffer removal, and strength-member trimming
Install and polish or field-terminate one connector style following a published procedure without skipping a step
Your checkpoint
A documented practice session log with at least five splices and three terminations, recording measured loss for each and a pass or fail judgment against a target threshold
Splicing, Termination, and Connectorization
Assemble a complete termination kit list for a given connector type and explain what each tool is used for
Diagnose common termination defects such as air gaps, end-face scratches, epoxy voids, and offset cores from a written symptom description
Apply the correct inspection criteria for connector end-faces and decide pass or fail
Explain the difference in handling and loss expectations between field-installable, splice-on, and pigtail termination methods
Your checkpoint
A troubleshooting table of 10 termination defects, each with visible symptoms, likely cause, and corrective action, plus a complete tool and materials list for one connector type
Testing, Measurement, and Troubleshooting
Set up and explain the reference method for an OLTS test, including one-jumper versus three-jumper referencing
Compute a link loss budget and compare measured results against it to declare pass or fail
Interpret OTDR traces by identifying events, splices, reflective connectors, and the end of fiber
Distinguish between testing for loss, length, and polarity, and select the right instrument for each
Your checkpoint
A completed test report for a practice link containing reference method used, measured loss per strand, calculated budget, OTDR event summary, and a pass or fail conclusion
Testing, Measurement, and Troubleshooting & Safety, Codes, Standards, and Job Documentation
Apply laser safety, eye protection, and fiber-shard handling rules to a described work area and list the specific controls required
Identify the code and standard sources that govern installation, grounding, and fire-rated cable selection, and state what each covers
Explain confined-space, ladder, and elevated-work precautions relevant to a fiber installation
Produce job documentation that records as-built routing, test results, and labeling
Your checkpoint
A safety and documentation packet for one mock job: hazard list with controls, required labeling scheme, and a completed as-built and test-results summary
Fiber Optic Theory and Transmission Principles & Fiber Optic Cables, Components, and Hardware & Cable Installation Practices (Pulling, Routing, and Support) & Splicing, Termination, and Connectorization & Testing, Measurement, and Troubleshooting & Safety, Codes, Standards, and Job Documentation
Re-derive every formula from memory and re-solve missed problems from weeks 1 through 7
Complete timed practice sets weighted to the published domain percentages and log the score per domain
Review the personal error log and rewrite the ten most-missed concepts in your own words
Rehearse the full installation workflow from survey to closeout as a single narrative without notes
Your checkpoint
A full-length timed practice exam score report by domain, plus a final one-page review sheet that lists every concept still flagged for review
Milestones
Week 2: Score 85 percent or better on a 25-question self-test covering domains 1 and 2, and correctly justify cable and connector choices in all 10 matrix scenarios
Week 4: Complete five splices and three terminations with documented loss values, and explain each pull-plan decision in the week 3 deliverable without referring to notes
Week 6: Produce a passing test report for a practice link using correct reference method and budget comparison, and correctly identify every event on a practice OTDR trace
Week 8: Score 80 percent or better overall on the timed practice exam with no single domain below 75 percent