Mistake 1

Treats the nameplate AFUE as if it were the efficiency the system actually delivers in the house, and uses it to predict fuel use or to justify not measuring anything in the field.

AFUE is a laboratory annualized rating that assumes a specific duct and cycling environment; candidates memorize it as a single 'efficiency number' and never connect it to distribution losses, oversizing, or standby losses in the actual building.

What to do instead

Distinguish clearly between rated AFUE, steady-state combustion efficiency measured at the flue, and delivered seasonal performance. Explain that duct loss, cycling loss, and oversizing are separate deductions, and demonstrate how to combine a measured steady-state efficiency with run-time and load data.

Mistake 2

Evaluates the house only as an enclosure (R-values, air sealing, windows) and never connects envelope pressure dynamics, stack effect, and exhaust ventilation to the operation of the heating appliance.

Fundamentals and building science are studied as separate subjects, so candidates answer insulation questions correctly and then fail questions that require linking a tight house, a bath fan, and a natural-draft appliance.

What to do instead

Practice reasoning through the house as one pressure system: identify the thermal boundary and the pressure boundary, rank the driving forces (stack, wind, mechanical exhaust), and trace how each changes pressure at the appliance location before answering.

Mistake 3

Runs combustion safety tests with the combustion appliance zone left in its normal condition instead of establishing the worst-case depressurization scenario first.

Candidates are anxious to get a flue reading and skip the setup steps; closing interior doors, energizing every exhaust fan, and running the dryer feel like optional extras rather than the condition that defines the test.

What to do instead

Follow a fixed worst-case sequence every time: close exterior openings and interior doors per protocol, operate all exhaust devices and the air handler, then measure and record CAZ pressure relative to outdoors before running the appliance. Compare the result to the program threshold and document the configuration used.

Mistake 4

Records raw flue CO in ppm and compares it against ambient indoor CO or a limit, without converting to an air-free value.

The meter displays two numbers and the candidate reads the CO field only; the dilution effect of excess air on flue CO concentration is not intuitive, so the conversion step is forgotten under time pressure.

What to do instead

Always pair the CO reading with a measured O2 (or CO2) reading and compute air-free CO as measured CO multiplied by 20.9 divided by (20.9 minus measured O2). Record measured CO, O2, and air-free CO together, and state that air-free CO is the number compared against limits.

Mistake 5

Accepts a furnace or boiler installation because it 'looks fine,' without checking vent connector category, slope, clearance to combustibles, or whether the appliance is approved for the venting configuration present.

Candidates inspect visually and stop at obvious defects like a disconnected pipe; they do not cross-check the nameplate category (I, II, III, IV) against the actual vent material, routing, and clearance requirements.

What to do instead

Build a nameplate-first habit: read category, input, and venting instructions, then verify each item in sequence (material compatibility, slope back to the chimney, single-wall clearances, termination, combined vent capacity). Write findings as pass/fail against the manufacturer instruction rather than as general impressions.

Mistake 6

Declares the heat exchanger acceptable based on a visual look with a flashlight, or declares it failed based on a single CO reading, with no structured evidence either way.

Heat exchanger assessment is treated as a binary visual judgment, and candidates are unaware that limited-access visual inspection alone cannot clear a concealed section and that CO alone cannot condemn one.

What to do instead

Use the manufacturer's inspection procedure and accessible openings, document exactly what was and was not visible, and support conclusions with before/after blower combustion analysis, temperature rise versus nameplate range, and a documented limitation statement when the exchanger cannot be fully examined.

Mistake 7

Clocks the gas meter while other appliances are firing, reads the wrong dial, or uses a short timing interval, then reports the result as the appliance input rate.

The clocking procedure is memorized as a formula but not as a procedure; candidates rush the timing and forget to isolate other gas users or to correct for the dial multiplier and gas heating value.

What to do instead

Shut off other gas appliances, confirm the dial size being timed, time at least two full revolutions or a long enough interval for accuracy, then compute input as 3600 divided by seconds, multiplied by cubic feet per revolution, multiplied by the local heating value. Compare with the nameplate input and note any derate.

Mistake 8

Takes temperature rise with a single probe placed anywhere in the supply plenum, before the appliance has stabilized, and compares it to the nameplate range.

Speed and convenience dominate; candidates do not realize that supply air temperature stratifies across the plenum and that rise is meaningless until the system reaches steady state.

What to do instead

Let the appliance run 10 to 15 minutes to steady state, average multiple supply readings across the plenum, measure return air in a representative location upstream of the blower, and compare the difference to the nameplate range, correcting for altitude where required.

Mistake 9

Measures static pressure at convenient test ports or in only one plenum, then reports total external static pressure without regard to where the coil, filter, and blower sit in the airstream.

The candidate treats static pressure as a single number to be captured rather than a quantity defined by measurement location; supply-side readings taken downstream of a coil or return readings taken after a filter change the meaning of the result.

What to do instead

State the measurement points explicitly: supply plenum between the heat exchanger or coil and the first takeoff, and return plenum between the filter and the blower. Add the absolute values of the two readings, and note which components fall inside the measured envelope so the result can be compared to the blower performance table.

Mistake 10

Completes a test or service visit and documents only the final numbers, omitting baseline conditions, ambient CO, weather, door and fan positions, model and serial numbers, and the before-and-after values that justify a recommendation.

Documentation is treated as paperwork done after the technical work; candidates do not see that an undocumented test condition cannot be reproduced, defended, or used by the next technician.

What to do instead

Use a fixed data sheet completed during testing, not afterward, capturing appliance identification, ambient CO and CAZ pressure, test conditions, all measured values before and after work, and any limitations or deferred items. Review the sheet for completeness before leaving the site.