OBC Act and Part 8 Administration, Scope, and Definitions

  • The Building Code Act, 1992 authorizes the building code, the chief building official (CBO), inspectors, and enforcement; Part 8 of Division B contains the sewage system rules.

  • A sewage system is defined as a system for the treatment and disposal of sewage serving one lot, including treatment units, distribution piping, and dispersal components.

  • Part 8 applies to systems with a design capacity of 10,000 L/day or less; larger systems fall outside Part 8 and require other approvals.

  • A building permit is required before constructing, extending, altering, or repairing a sewage system; the permit is issued by the principal authority (municipality or board of health).

  • The CBO may require plans, specifications, and a site evaluation report before issuing a permit; incomplete applications may be refused.

  • A sewage system shall not be used or covered until it has been inspected and the inspector has given authorization to cover or use it.

  • Where a system is found unsafe or non-compliant, the CBO may issue an order to remedy, which may require repair, replacement, or disconnection.

  • Owner obligations include maintaining the system, keeping records of maintenance, and ensuring the system is not overloaded beyond its design capacity.

Quick reference

Site Evaluation and Soil/Site Conditions

  • A site evaluation identifies soil texture, depth to bedrock, depth to water table, slope, and lot size; these determine the feasible system type and size.

  • Soil permeability is assessed by percolation testing or by texture classification; percolation rate (T-time) is expressed in minutes per 25 mm of water drop.

  • Depth of unsaturated soil beneath the dispersal trench bottom must be adequate; shallow bedrock or high water table requires a raised or mound system.

  • Slope affects system selection: steep slopes require special design, and slopes over about 30 percent generally require an engineered design.

  • A minimum setback from wells, surface water, property lines, and buildings applies; these distances are set in Part 8 and must be verified on site.

  • Soil with very slow permeability (high T-time) or very fast permeability (sandy, coarse) may need a filter bed or mound to provide adequate treatment.

  • Seasonal high water table shall be determined from soil mottling, monitoring wells, or local records; it sets the elevation of the trench bottom.

  • Lot size and reserve area must allow a replacement system; a reserve area of comparable size to the primary area is typically required.

Quick reference

Sewage Characteristics, Flows, and Design Basis

  • Design flow for a single-family dwelling is typically based on 1,000 to 1,500 L/day, or a per-bedroom or per-person allowance set by Part 8.

  • Daily flow estimates use fixture counts, occupancy, and water-use assumptions; non-residential flows are based on use type and occupant load.

  • Typical residential sewage strength is about 200 to 300 mg/L BOD5 and 200 to 300 mg/L suspended solids; grease and solids settle in the tank.

  • The design basis includes peak flow, organic loading, and hydraulic loading; the dispersal area is sized from the daily flow and soil loading rate.

  • Hydraulic loading rate is the volume applied per unit area per day and depends on soil texture and the treatment level provided.

  • A garbage grinder, high-flow fixtures, or a hot tub increases flow and organic load and must be included in the design basis.

  • Infiltration and inflow from footing drains or roof leaders shall not be connected to the sewage system; clear water connections are prohibited.

  • Design flow for a dwelling is based on the number of bedrooms or fixture units; the greater of the calculated flow and the minimum allowance applies.

Quick reference

Treatment Units, Tanks, and Pretreatment

  • A septic tank provides primary treatment by settling and flotation; typical liquid retention time is at least 24 hours at design flow.

  • Minimum tank capacity is set by Part 8 and is typically 3,600 L for a single-family dwelling, with additional capacity for extra bedrooms or fixtures.

  • Tanks must be watertight, have accessible inspection ports, and be constructed of durable materials such as concrete, fiberglass, or polyethylene.

  • Sludge and scum accumulate; the tank must be pumped when the combined sludge and scum depth reaches about one-third of the tank depth.

  • A two-compartment tank or a tank with an effluent filter improves solids retention and protects the dispersal field.

  • Effluent filters capture fine solids and must be cleaned regularly; a blocked filter can cause backup into the building.

  • Aerobic treatment units (ATUs) provide secondary treatment and require continuous power, regular maintenance, and effluent quality monitoring.

  • Grease interceptors are required for commercial kitchens and other high-grease sources before discharge to the sewage system.

Quick reference

Distribution and Dispersal Systems (Leaching Beds, Filter Beds, Mounds)

  • A leaching bed consists of distribution pipe in gravel-filled trenches; trench bottom area is sized from the daily flow and the soil loading rate.

  • Distribution pipe shall be level or uniformly sloped, with perforations placed downward, and shall be surrounded by specified aggregate and geotextile.

  • A filter bed uses a sand or other filter medium to provide additional treatment where soil is marginal; effluent is applied to the filter surface or buried.

  • A mound system raises the dispersal area above natural grade using a sand fill; it is used where the water table or bedrock is close to the surface.

  • Trench spacing, sidewall overlap, and aggregate depth are specified in Part 8; trench width and spacing affect the effective absorption area.

  • Serial and distribution box layouts must provide equal flow to each trench; a distribution box must be level and accessible.

  • A reserve area of equal size must be identified and protected from construction traffic and future building expansion.

  • Dispersal systems shall not be located in areas subject to flooding or where surface water ponds over the trenches.

Quick reference

Pumps, Dosing, and Hydraulic Controls

  • A pump chamber is sized to provide the required dose volume and to prevent pump short-cycling; the dose volume is typically the volume of the distribution pipe plus a fraction of the daily flow.

  • Dosing distributes effluent in controlled batches, improving treatment and resting the soil between doses.

  • Pump selection is based on total dynamic head (static lift plus friction losses) and the required dose rate.

  • Check valves and isolation valves are required on the discharge line to prevent backflow and to allow maintenance.

  • Alarms and high-level floats are required to warn of pump failure or high water in the chamber.

  • Controls shall be accessible, protected from water, and include a manual override for testing and emergency operation.

  • A pump chamber must be watertight and sized to hold the dose plus emergency storage; the alarm float is set below the inlet invert.

  • Gravity distribution is preferred where elevation allows; pumping is used where the site cannot achieve gravity flow.

Quick reference

Setbacks, Clearances, and Location Requirements

  • Minimum setbacks from wells, surface water, property lines, and buildings are specified in Part 8 and must be measured horizontally from the system component.

  • A leaching bed shall not be located closer than the specified distance to a watercourse, lake, or pond; the setback protects surface water quality.

  • Setbacks to drinking-water wells are larger than to other features because of contamination risk; the required distance depends on well type.

  • Systems shall not be located under driveways, parking areas, or buildings, and must be accessible for maintenance and inspection.

  • Clearances from foundation drains, water lines, and buried utilities must be maintained to prevent cross-contamination and damage.

  • The system shall be located so that effluent does not surface or drain onto neighbouring property.

  • Setbacks from property lines apply to the entire system, including the reserve area, and must be shown on the site plan.

  • Where a variance is requested, the principal authority may require additional treatment or an engineered design to compensate for reduced setbacks.

Quick reference

Installation, Inspection, and Maintenance Requirements

  • Installation must follow the approved plans; any change requires approval before construction continues.

  • Inspections are required at specified stages: before covering the tank, before covering the distribution piping, and at final completion.

  • The installer must notify the inspector when the work is ready for inspection and must not cover work before authorization.

  • Maintenance includes regular tank pumping, filter cleaning, pump testing, and inspection of the dispersal area for ponding or odour.

  • A maintenance plan and record-keeping are required for systems with mechanical components such as pumps and ATUs.

  • The owner shall ensure the system is operated within its design capacity and shall not discharge prohibited wastes such as grease, solvents, or clear water.

  • Signs of failure include surfacing effluent, odour, slow drains, and soggy ground over the dispersal area; these require prompt repair.

  • As-built records and maintenance records should be retained and transferred to a new owner on sale of the property.

Quick reference

Plans, Permits, and Documentation

  • A permit application includes a site plan, design drawings, specifications, and the site evaluation report.

  • The site plan must show the lot boundaries, buildings, wells, watercourses, setbacks, the system layout, and the reserve area.

  • Design drawings must show tank size and location, distribution layout, pipe sizes and slopes, and pump chamber details where applicable.

  • The designer must be qualified; where required, drawings must be sealed by a professional engineer or designer.

  • A permit is valid for a specified period; work must commence within the time allowed and be completed within the permit term.

  • Changes to approved plans require an amendment to the permit before the work proceeds.

  • A final inspection and approval are required before the system is placed in service; the approval documents the as-built condition.

  • Records of permits, inspections, and maintenance must be kept and made available to the principal authority on request.