OBC On-site Sewage Systems study materials
OBC On-site Sewage Systems study resources

OBC On-site Sewage Systems study plan

OBC On-site Sewage Systems · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Ontario Building Code Act and Div. B Part 8 Administration, Scope, and Definitions & Sewage Characteristics, Flows, and Design Basis

  • Map the Division B Part 8 structure and state the purpose of each subsection in your own words

  • Distinguish the roles of the Building Code Act, the code, and permits in the approval sequence

  • Define 20 core Part 8 terms from memory and flag any you cannot define precisely

  • Calculate daily design flow for three worked examples: a 3-bedroom dwelling, a cottage, and a small commercial occupancy

  • List the sewage strength categories and match each to its typical source

Your checkpoint

A one-page definitions and design-flow cheat sheet with 20 terms and 3 solved flow calculations

Week 2

Distribution and Dispersal Systems (Leaching Beds, Filter Beds, Mounds) & Site Evaluation and Soil/Site Conditions

  • Compare leaching beds, filter beds, and mounds on loading rate, depth to limiting layer, and site suitability

  • Size a leaching bed from a given design flow and soil percolation class

  • Interpret a soil profile description and identify the limiting layer and its depth

  • Explain how slope, bedrock, and high water table constrain system selection

  • Sketch a plan view and cross-section of a leaching bed with dimensions labelled

Your checkpoint

Two fully dimensioned system sketches (plan and section) with sizing calculations shown

Week 3

Distribution and Dispersal Systems (Leaching Beds, Filter Beds, Mounds) & Treatment Units, Tanks, and Pretreatment

  • Compute distribution laterals, orifice sizing, and bed area for a given flow and soil

  • Describe the sequence of treatment in a septic tank and the function of each compartment

  • Explain the purpose and maintenance implications of effluent filters and dosing

  • Identify common tank defects and the conditions that require rejection at inspection

  • Relate pretreatment performance to required dispersal area

Your checkpoint

A worked design package for one hypothetical lot: tank selection, bed sizing, and lateral layout

Week 4

Site Evaluation and Soil/Site Conditions & Setbacks, Clearances, and Location Requirements

  • Perform a full site evaluation from a written site description and record all constraints

  • Apply setback distances to wells, property lines, watercourses, and buildings from memory

  • Resolve three conflict scenarios where setbacks force a layout change

  • Explain how clearance requirements differ for tanks versus dispersal areas

  • Document a site plan with all setbacks annotated

Your checkpoint

A completed site evaluation worksheet and setback-annotated site plan for a sample property

Week 5

Pumps, Dosing, and Hydraulic Controls & Distribution and Dispersal Systems (Leaching Beds, Filter Beds, Mounds)

  • Calculate total dynamic head for a dosing system including static lift and friction loss

  • Select a pump duty point that fits a required dose volume and rate

  • Explain how dose volume relates to bed resting and distribution uniformity

  • Troubleshoot three described pump and control faults from symptoms alone

  • Describe alarm and high-water control logic and its inspection points

Your checkpoint

A pump and dosing calculation sheet with TDH, dose volume, and a justified pump selection

Week 6

Treatment Units, Tanks, and Pretreatment & Installation, Inspection, and Maintenance Requirements

  • Sequence the installation steps for a tank and bed from excavation to backfill

  • List the inspection hold points and what must be verified at each

  • Draft a maintenance schedule covering tank pumping, filter service, and bed monitoring

  • Identify the top five installation errors and their long-term consequences

  • Explain how to verify as-built compliance against the approved plan

Your checkpoint

An inspection checklist with hold points plus a homeowner maintenance schedule

Week 7

Plans, Permits, and Documentation & Ontario Building Code Act and Div. B Part 8 Administration, Scope, and Definitions

  • Assemble a complete permit application package for a sample project

  • Identify the documents, drawings, and calculations a reviewer expects to see

  • Explain the inspection and final approval pathway after permit issuance

  • Describe record-keeping obligations and what as-built documentation must capture

  • Spot three deficiencies in a deliberately incomplete application

Your checkpoint

A mock permit submission package with a deficiency log noting what was missing and why

Week 8

Distribution and Dispersal Systems (Leaching Beds, Filter Beds, Mounds) & Treatment Units, Tanks, and Pretreatment & Setbacks, Clearances, and Location Requirements & Sewage Characteristics, Flows, and Design Basis

  • Complete a timed 60-question mixed practice set across all domains

  • Review every missed item and write the underlying rule in your own words

  • Re-derive the five most common calculations without notes

  • Recite key setback distances and sizing rules from memory

  • Rank your remaining weak areas and schedule targeted review before exam day

Your checkpoint

A scored practice exam with a written error log and a final two-week review priority list

Milestones

Week 2: Can size a leaching bed and identify the limiting layer from a soil description without notes

Week 4: Can produce a setback-compliant site plan and state the key clearance distances from memory

Week 6: Can walk through a full installation sequence and name each inspection hold point

Week 8: Scores 80 percent or better on the mixed timed practice set