CAPM flashcards
CAPM · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Project
- A temporary endeavor undertaken to create a unique product, service, or result, with a defined start and end, distinct from ongoing operations.
- Project charter
- Document issued by the sponsor that formally authorizes the project, names the project manager, and states high-level scope, objectives, budget, and risks.
- Project management office
- Organizational unit that standardizes project governance; types are supportive (low control), controlling (moderate control), and directive (manages projects directly with high control).
- Functional organization
- Structure grouped by specialty where the project manager has little authority, staff report to one functional manager, and coordination across departments happens through those managers.
- Tuckman ladder
- Model of team development with five stages - forming, storming, norming, performing, adjourning - where productivity peaks at performing and the team disbands at adjourning.
- Stakeholder register
- Document recording identified stakeholders with their roles, contact information, requirements, expectations, influence, and potential impact, used to plan how to engage each.
- Triple constraint
- Interrelated constraints of scope, schedule, and cost (with quality) that must be balanced; changing one typically requires adjusting at least one of the others.
- Conflict resolution methods
- Five approaches: collaborate/problem-solve and compromise yield win-win outcomes; force, avoid, and accommodate are win-lose; collaboration best supports lasting resolution.
- Work breakdown structure
- Deliverable-oriented hierarchical decomposition of the total project scope; the lowest level is a work package, and the 100 percent rule requires children fully represent the parent.
- Critical path
- Longest duration path through the project network with zero total float; it determines the shortest possible project duration, and any delay on it extends the finish date.
- Total float
- Time an activity can be delayed without delaying the project finish date; calculated as late start minus early start or late finish minus early finish.
- Three-point estimating
- Technique using optimistic, most likely, and pessimistic estimates; PERT beta formula (O+4M+P)/6; standard deviation is (P-O)/6; triangular average is (O+M+P)/3.
- Cost performance index
- Earned value ratio CPI = EV/AC; greater than 1.0 means work is costing less than planned, below 1.0 means cost overrun, equal to 1.0 means on budget.
- Estimate at completion
- Forecast of total project cost; when current cost performance continues, EAC = BAC/CPI; other forms apply when variances are atypical or expected to cease.
- Contingency reserve
- Time or money set aside for identified risks (known unknowns), owned and used by the project manager; management reserve covers unknown unknowns and typically needs sponsor approval.
- Risk response strategies
- For threats: avoid, transfer, mitigate, escalate, accept. For opportunities: exploit, share, enhance, escalate, accept. Selection depends on risk exposure and risk appetite.
- Agile Manifesto values
- Four values: individuals and interactions over processes and tools; working software over comprehensive documentation; customer collaboration over contract negotiation; responding to change over following a plan.
- Sprint
- Timeboxed Scrum iteration of one to four weeks, commonly two, at the end of which a potentially releasable, Done product increment is produced.
- Product owner
- Scrum role accountable for maximizing product value by managing and ordering the product backlog, defining items clearly, and representing stakeholder needs to the development team.
- Daily scrum
- Fifteen-minute timeboxed event for the development team to inspect progress toward the sprint goal and adapt the plan for the next 24 hours.
- Definition of Done
- Shared, explicit checklist of quality criteria an increment must satisfy to be considered complete; it is distinct from the acceptance criteria of individual backlog items.
- Kanban WIP limits
- Caps on how many items may be in progress at each workflow stage; they expose bottlenecks, discourage multitasking, and support a pull-based flow of work.
- Velocity
- Amount of work, often measured in story points, a team completes per iteration; used to forecast future capacity and never to compare different teams.
- Burndown chart
- Graph of remaining work versus time for an iteration or release; a downward trend to zero shows progress, while a flat or rising line suggests scope or impediment problems.
- Business analysis
- Set of activities that identify business needs and recommend solutions delivering value to stakeholders, bridging business problems and the teams that build solutions.
- BACCM core concepts
- Business Analysis Core Concept Model's six concepts: change, need, solution, stakeholder, value, and context; every business analysis task is considered in relation to all six.
- Requirements classification
- Categories: business requirements (why the change), stakeholder requirements (who needs what), solution requirements (functional and non-functional), and transition requirements (temporary, needed only to implement).
- Elicitation techniques
- Methods for drawing out requirements, including interviews, workshops, focus groups, observation or job shadowing, surveys, document analysis, brainstorming, and prototyping.
- Requirements traceability matrix
- Grid linking each requirement to its source, business need, design components, and test cases, supporting impact analysis, coverage checks, and verification.
- MoSCoW prioritization
- Prioritization scheme with Must have, Should have, Could have, and Won't have this time; used to agree scope when time is fixed and trade-offs are needed.
- INVEST criteria
- Heuristic for good user stories: Independent, Negotiable, Valuable, Estimable, Small, and Testable; guides splitting large items into backlog-ready stories.
- Kano model
- Classifies product features as must-be, performance, delighter, indifferent, or reverse, based on how their presence affects customer satisfaction; guides prioritization of requirements.