CAPM · Give each week a clear focus.
8 weeks · About 6 hours per week
Project Management Fundamentals and Core Concepts
List and restate in your own words all 12 project management principles and match each to one real project you have observed
Differentiate predictive, iterative, incremental, and agile life cycles by drawing the shape of each
Map the 8 project performance domains to the principle list and note where they overlap
Summarize the four PMI Code of Ethics and Professional Conduct values with one workplace scenario each
Your checkpoint
A one-page hand-drawn map of 12 principles, 8 performance domains, and 4 life-cycle types, plus a 30-question self-quiz scored at 75% or higher
Project Management Fundamentals and Core Concepts
Contrast project, program, portfolio, and product management with a table of defining characteristics
Compare functional, matrix, and projectized organizational structures by authority, reporting, and PM influence
Explain the responsibilities of the project manager, sponsor, team, and other stakeholders in each structure
Describe how enterprise environmental factors and organizational process assets shape a project
Identify what tailoring and benefits realization mean in the context of delivering value
Your checkpoint
A 25-card flashcard set covering roles, structures, and artifacts, with a written 1-page summary of how structure changes PM authority
Project Management Fundamentals and Core Concepts & Business Analysis Frameworks
Walk through each of the 8 performance domains and state two activities a project manager performs in each
Define business analysis and explain how the BA role interacts with the project manager role
Outline the steps of a needs assessment and construct a simple business case with costs, benefits, and a go/no-go recommendation
Identify stakeholders for a sample project and classify them by influence and interest
Your checkpoint
A written mini business case (1-2 pages) for a fictional project with a stakeholder register of at least 10 entries
Business Analysis Frameworks
Sequence the requirements life-cycle stages from elicitation through traceability, prioritization, and approval
Select appropriate elicitation techniques (interviews, workshops, observation, surveys, document analysis) for given scenarios
Construct a requirements traceability matrix linking business needs to requirements to deliverables
Distinguish business requirements, stakeholder requirements, solution requirements, and transition requirements
Explain how product design and benefits realization connect requirements to value delivery
Your checkpoint
A completed requirements traceability matrix for the week-3 business case with at least 12 requirements categorized by type and priority
Agile Frameworks/Methodologies
Summarize the Agile Manifesto values and principles and translate each into a team behavior
Compare Scrum, Kanban, and XP by roles, ceremonies, artifacts, and when each fits
Describe servant leadership and contrast it with command-and-control management
Explain how business analysis work is performed on an agile team, including backlog refinement and just-in-time requirements
Your checkpoint
A three-column comparison matrix of Scrum, Kanban, and XP plus a one-page reflection on how the BA role changes in agile
Agile Frameworks/Methodologies & Predictive, Plan-Based Methodologies
Draft user stories with acceptance criteria and split an epic into at least six stories
Estimate using story points and relative sizing, then explain velocity and burndown to a stakeholder
Describe hybrid approaches and justify when a predictive life cycle is preferred over an agile one
Decompose project scope into a work breakdown structure with at least three levels
Identify dependencies and sequence activities into a network diagram with a critical path
Your checkpoint
A product backlog of 10 stories with acceptance criteria, plus a WBS and network diagram for the same project showing the critical path and total duration
Predictive, Plan-Based Methodologies
Build a cost baseline and calculate planned value, earned value, cost variance, schedule variance, CPI, and SPI from given data
Forecast estimate at completion and interpret whether a project is ahead or behind and over or under budget
Outline quality management processes and match quality tools to common defects
Identify, analyze, and plan responses to risks using a risk register with probability and impact ratings
Summarize procurement and stakeholder engagement planning in a predictive project
Your checkpoint
A worked EVM problem set of 15 calculations with written interpretations, plus a 10-item risk register with response strategies
Project Management Fundamentals and Core Concepts & Predictive, Plan-Based Methodologies & Agile Frameworks/Methodologies & Business Analysis Frameworks
Complete at least two timed full-length practice exams under test conditions
Log every missed question by domain and root cause (knowledge gap, misread, or terminology)
Re-study the two weakest domains using targeted review notes
Recite the exam structure, domain weightings, and question-format rules from memory
Build a one-page pre-exam review sheet of formulas, definitions, and principle names
Your checkpoint
A scored practice-exam log showing at least 80% on the final attempt, plus a completed one-page pre-exam review sheet
Milestones
Week 2: Explain all 12 principles and 8 performance domains aloud without notes, and score 75%+ on a 30-question Domain 1 quiz
Week 4: Complete the requirements traceability matrix and pass a 20-question mixed Domain 1 and Domain 4 quiz at 75%+
Week 6: Produce a backlog, WBS, and network diagram for one project and score 75%+ on a 20-question mixed Domain 3 and Domain 2 quiz
Week 8: Score 80%+ on a timed full-length practice exam and show a written weak-area remediation log covering every missed domain