CAPM study materials
CAPM study resources

CAPM study plan

CAPM · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Project Management Fundamentals and Core Concepts

  • List and restate in your own words all 12 project management principles and match each to one real project you have observed

  • Differentiate predictive, iterative, incremental, and agile life cycles by drawing the shape of each

  • Map the 8 project performance domains to the principle list and note where they overlap

  • Summarize the four PMI Code of Ethics and Professional Conduct values with one workplace scenario each

Your checkpoint

A one-page hand-drawn map of 12 principles, 8 performance domains, and 4 life-cycle types, plus a 30-question self-quiz scored at 75% or higher

Week 2

Project Management Fundamentals and Core Concepts

  • Contrast project, program, portfolio, and product management with a table of defining characteristics

  • Compare functional, matrix, and projectized organizational structures by authority, reporting, and PM influence

  • Explain the responsibilities of the project manager, sponsor, team, and other stakeholders in each structure

  • Describe how enterprise environmental factors and organizational process assets shape a project

  • Identify what tailoring and benefits realization mean in the context of delivering value

Your checkpoint

A 25-card flashcard set covering roles, structures, and artifacts, with a written 1-page summary of how structure changes PM authority

Week 3

Project Management Fundamentals and Core Concepts & Business Analysis Frameworks

  • Walk through each of the 8 performance domains and state two activities a project manager performs in each

  • Define business analysis and explain how the BA role interacts with the project manager role

  • Outline the steps of a needs assessment and construct a simple business case with costs, benefits, and a go/no-go recommendation

  • Identify stakeholders for a sample project and classify them by influence and interest

Your checkpoint

A written mini business case (1-2 pages) for a fictional project with a stakeholder register of at least 10 entries

Week 4

Business Analysis Frameworks

  • Sequence the requirements life-cycle stages from elicitation through traceability, prioritization, and approval

  • Select appropriate elicitation techniques (interviews, workshops, observation, surveys, document analysis) for given scenarios

  • Construct a requirements traceability matrix linking business needs to requirements to deliverables

  • Distinguish business requirements, stakeholder requirements, solution requirements, and transition requirements

  • Explain how product design and benefits realization connect requirements to value delivery

Your checkpoint

A completed requirements traceability matrix for the week-3 business case with at least 12 requirements categorized by type and priority

Week 5

Agile Frameworks/Methodologies

  • Summarize the Agile Manifesto values and principles and translate each into a team behavior

  • Compare Scrum, Kanban, and XP by roles, ceremonies, artifacts, and when each fits

  • Describe servant leadership and contrast it with command-and-control management

  • Explain how business analysis work is performed on an agile team, including backlog refinement and just-in-time requirements

Your checkpoint

A three-column comparison matrix of Scrum, Kanban, and XP plus a one-page reflection on how the BA role changes in agile

Week 6

Agile Frameworks/Methodologies & Predictive, Plan-Based Methodologies

  • Draft user stories with acceptance criteria and split an epic into at least six stories

  • Estimate using story points and relative sizing, then explain velocity and burndown to a stakeholder

  • Describe hybrid approaches and justify when a predictive life cycle is preferred over an agile one

  • Decompose project scope into a work breakdown structure with at least three levels

  • Identify dependencies and sequence activities into a network diagram with a critical path

Your checkpoint

A product backlog of 10 stories with acceptance criteria, plus a WBS and network diagram for the same project showing the critical path and total duration

Week 7

Predictive, Plan-Based Methodologies

  • Build a cost baseline and calculate planned value, earned value, cost variance, schedule variance, CPI, and SPI from given data

  • Forecast estimate at completion and interpret whether a project is ahead or behind and over or under budget

  • Outline quality management processes and match quality tools to common defects

  • Identify, analyze, and plan responses to risks using a risk register with probability and impact ratings

  • Summarize procurement and stakeholder engagement planning in a predictive project

Your checkpoint

A worked EVM problem set of 15 calculations with written interpretations, plus a 10-item risk register with response strategies

Week 8

Project Management Fundamentals and Core Concepts & Predictive, Plan-Based Methodologies & Agile Frameworks/Methodologies & Business Analysis Frameworks

  • Complete at least two timed full-length practice exams under test conditions

  • Log every missed question by domain and root cause (knowledge gap, misread, or terminology)

  • Re-study the two weakest domains using targeted review notes

  • Recite the exam structure, domain weightings, and question-format rules from memory

  • Build a one-page pre-exam review sheet of formulas, definitions, and principle names

Your checkpoint

A scored practice-exam log showing at least 80% on the final attempt, plus a completed one-page pre-exam review sheet

Milestones

Week 2: Explain all 12 principles and 8 performance domains aloud without notes, and score 75%+ on a 30-question Domain 1 quiz

Week 4: Complete the requirements traceability matrix and pass a 20-question mixed Domain 1 and Domain 4 quiz at 75%+

Week 6: Produce a backlog, WBS, and network diagram for one project and score 75%+ on a 20-question mixed Domain 3 and Domain 2 quiz

Week 8: Score 80%+ on a timed full-length practice exam and show a written weak-area remediation log covering every missed domain