PAQE · Keep the key ideas within reach.

Quick reference

Pre-Design and Programming

  • Net assignable area (NASF) excludes circulation, mechanical, and structure; gross area includes everything measured to the outside face of exterior walls.

  • Efficiency ratio = net assignable area ÷ gross area; office buildings typically run 0.65–0.80, and the ratio drives the gross area budget once NASF is programmed.

  • Space program = sum of individual space requirements (area × quantity) plus growth factor and unassigned support space; verify against benchmark area-per-person or area-per-workstation data.

  • Adjacency matrix scores required proximity between functional groups; a bubble diagram translates the matrix into a blocking diagram before any floor plan geometry is fixed.

  • Occupant load for egress is computed from program use, not from furniture count: use the code table value (sf/occupant) for the occupancy classification of each space.

  • Programming precedes design and answers what, how much, and how well; it does not fix building form, which belongs to schematic design.

  • Interview-based programming (functional, then technical, then executive) reduces late scope change; document each space's function, users, equipment, and environmental criteria.

  • A written program of requirements is a contract baseline; changes after owner sign-off should be tracked as scope changes with schedule and fee impact.

Quick reference

Site and Environmental Analysis

  • Solar azimuth and altitude are read from a sun-path diagram for the project latitude; shadow angles at 9 a.m., noon, and 3 p.m. on 21 June and 21 December define the shading envelope.

  • Runoff by the rational method: Q = C·i·A, where C is the runoff coefficient (0.9 pavement, 0.3 lawn), i is rainfall intensity, and A is area; detention volume sizes to the difference between pre- and post-development peaks.

  • FAR (floor area ratio) = total gross floor area ÷ site area; lot coverage = building footprint ÷ site area; both are zoning limits independent of each other.

  • Setback plus height limit plus sky-exposure plane together govern the buildable envelope; check each separately because the most restrictive governs.

  • Prevailing winter and summer wind directions come from climate data (wind rose), not from intuition; they set inlet/outlet orientation for natural ventilation.

  • Slope categories: 0–4% gentle, 4–10% moderate, over 10% constrains vehicle access and requires retaining or stepped foundations.

  • Site soil borings and a geotechnical report establish bearing capacity, groundwater elevation, and expansive or compressible strata before foundation selection.

  • Stormwater best management practice hierarchy: infiltrate, evapotranspire, detain, then discharge; green roofs, bioswales, and permeable paving reduce the required pipe size.

Quick reference

Building Planning and Massing

  • Floor-to-floor height = ceiling height + plenum depth + structural depth + finish; mechanical and structural zones must be added, not assumed inside the ceiling.

  • Core-to-facade distance controls daylight and egress travel: office depth per side typically 12–15 m (40–50 ft) for useful daylight and code-compliant travel distance.

  • Massing options are compared on gross floor area yield, envelope-to-floor-area ratio, orientation, and structural regularity; a compact form reduces envelope but restricts daylight.

  • Structural bay module (e.g., 8–9 m) should be set before plan geometry; it drives column-free parking efficiency and column placement below.

  • Vertical transportation: elevator count and speed follow population per floor, handling capacity (typically 12–15% of population in 5 minutes), and interval target.

  • Building height and area limits from the code table depend on construction type and sprinkler protection; increasing construction type or adding sprinklers permits larger area.

  • Daylight factor = interior illuminance ÷ unobstructed exterior horizontal illuminance × 100; a 2% factor is a common target for side-lit offices.

  • Zoning envelope checks: height, setback, FAR, coverage, and open space; a massing model fails if any one limit is exceeded, not the average.

Quick reference

Building Systems and Structural Integration

  • Structural depth rule of thumb: steel beam span/20, reinforced concrete beam span/12, one-way slab span/28, two-way slab span/33 (in consistent units, for preliminary sizing only).

  • Load path must be continuous: gravity load travels slab → beam → girder → column → footing → soil; every transfer must be shown on a framing plan.

  • Live load reductions are permitted per code for large tributary areas but never below the code minimum; snow, wind, and seismic loads are not reduced by tributary area.

  • Lateral systems: braced frames are stiff and economical but block openings; moment frames allow openness but drift more; shear walls suit residential and concrete cores.

  • Seismic detailing requires ductile connections and a continuous lateral system; soft-story and plan irregularity trigger stricter analysis.

  • Mechanical shaft area is roughly 1–3% of gross floor area for offices; central plant space and electrical rooms must be located before structure is fixed.

  • Coordination sequence: structure first, then large ducts and mains, then branch piping and conduit; a clash check at each milestone prevents ceiling-height loss.

  • Expansion joints in structure, envelope, and finishes must align vertically; a structural joint not carried through the facade causes cracking and water entry.

Quick reference

Building Envelope and Environmental Control Systems

  • U-factor measures conductance (lower is better); R-value = 1/U measures resistance; assembly U is calculated from layer resistances plus film coefficients, not by adding R-values of only insulation.

  • Thermal bridging through slab edges, balconies, and steel studs degrades assembly performance; a continuous insulation layer outside the structure breaks the bridge.

  • Condensation control: keep the vapor retarder on the warm side of the insulation in cold climates; in mixed climates, place it where winter and summer conditions both tolerate it.

  • Air barrier continuity is separate from the vapor retarder; air leakage carries far more moisture than diffusion in most assemblies.

  • Glazing performance: SHGC controls solar heat gain, VLT controls daylight; a low SHGC with high VLT reduces cooling load without darkening the interior.

  • Psychrometrics: comfort zone is roughly 20–26 °C and 30–60% RH; the psychrometric chart plots dry-bulb, wet-bulb, humidity ratio, and enthalpy for system sizing.

  • VAV systems vary air volume at constant supply temperature; fan power scales with the cube of speed, so VFD control yields large energy savings at part load.

  • Economizer uses outdoor air for free cooling when outdoor enthalpy is below return air; it is required above a code threshold of cooling capacity.

Quick reference

Life Safety, Accessibility, and Code Compliance

  • Occupant load = floor area ÷ occupant load factor; egress width = occupant load × width factor (commonly 5 mm or 0.2 in per occupant for level components, more for stairs).

  • Two exits are generally required when occupant load exceeds the code threshold or travel distance is exceeded; exits must be remote from each other by a specified separation.

  • Exit access travel distance is measured along the path of travel to the nearest exit, not in a straight line; dead-end corridors are limited by occupancy.

  • Stair width is measured between handrails; handrails project into the required width and must be accounted for on both sides.

  • Accessible route: 1:12 maximum ramp slope, 1500 mm (60 in) turning space, 815–1220 mm (32–48 in) clear width, and 760 mm (30 in) minimum clear door width per accessible leaf.

  • Accessible parking: one van-accessible space per six accessible spaces, with an access aisle of 2440 mm (96 in) for van spaces.

  • Fire-resistance ratings apply to structural members, shafts, and exit enclosures by construction type; opening protectives (doors, glazing) carry a fraction of the wall rating.

  • Sprinkler protection usually permits increased travel distance, reduced exit separation, and larger area; verify each allowance in the adopted code edition.

Quick reference

Building Materials, Assemblies, and Specifications

  • Specification divisions follow MasterFormat: Division 03 Concrete, 04 Masonry, 05 Metals, 06 Wood, 07 Thermal and Moisture, 08 Openings, 09 Finishes, 22 Plumbing, 23 HVAC, 26 Electrical.

  • Prescriptive specifications state products and methods; performance specifications state required results and leave means to the contractor; most projects mix both.

  • Concrete strength is specified by 28-day compressive strength (f'c); slump and air content are separate acceptance criteria for workability and durability.

  • Steel: ASTM A992 is the common structural shape grade (Fy = 345 MPa / 50 ksi); A36 (Fy = 250 MPa / 36 ksi) is used where weldability and cost favor it.

  • Wood design uses allowable stress or LRFD with adjustment factors for duration, moisture, and size; engineered lumber spans farther than sawn lumber of the same depth.

  • Mockups verify assembly performance (water, air, thermal) before full installation; a tested mockup is a quality benchmark, not a sample.

  • Submittals (shop drawings, product data, samples) are contractor documents reviewed by the architect for design intent; review does not relieve the contractor of responsibility.

  • Substitution requests must be evaluated against the specified performance and appearance; approval of a substitute is a change to the contract documents.

Quick reference

Construction Documentation and Project Delivery

  • Drawing set order: cover and general notes, life safety and code plans, demolition, plans, elevations, sections, enlarged details, schedules, and specifications.

  • AIA A101 is the owner-contractor agreement; B101 is owner-architect; A201 is the general conditions; these define roles, payment, and changes.

  • Design-bid-build: owner contracts separately with architect and contractor; design-build: one entity holds design and construction; CM at risk: constructor joins early with a guaranteed maximum price.

  • Bidding documents include drawings, specifications, addenda, bid form, and instructions to bidders; addenda issued during bidding become part of the contract.

  • Payment application and certification: the architect certifies amounts due based on observed progress, not on the contractor's unilateral claim.

  • Change order modifies scope, price, or time and requires owner approval; a construction change directive orders work before price is agreed.

  • Punch list documents incomplete or defective work at substantial completion; substantial completion starts warranty periods and owner use.

  • Record documents reflect as-built conditions; they are not the same as the contract documents and do not change the contract unless formally issued as a change.

Quick reference

Professional Practice, Ethics, and Business Management

  • Standard of care: the architect owes the skill and care ordinarily provided by professionals under similar circumstances, not a guarantee of perfection.

  • Fee structures: percentage of construction cost, lump sum, hourly, and cost plus fixed fee; scope, schedule, and risk allocation drive which is appropriate.

  • Profit = revenue − direct labor − indirect (overhead) costs; utilization rate = direct hours ÷ total hours; multiplier = billing rate ÷ direct hourly cost.

  • Scope creep is controlled by a written agreement defining basic services and additional services, with a documented change process.

  • Conflict of interest requires disclosure and, where unavoidable, written consent; the architect must not accept compensation from contractors on the same project.

  • Professional liability insurance covers errors and omissions; it is claims-made, so the policy in force when the claim is made responds.

  • Licensure is by jurisdiction; the architect seals and signs documents only for work they are competent to perform and legally authorized to stamp.

  • Ethical obligations include competence, honesty in reporting, confidentiality of client information, and avoiding misrepresentation of qualifications or project experience.