PAQE study plan
PAQE · Give each week a clear focus.
8 weeks · About 7 hours per week
Building Systems and Structural Integration & Building Envelope and Environmental Control Systems
Map the full building-systems scope of Domains 4 and 5 into a one-page outline covering structure, MEP, and envelope, and rate your confidence per subtopic
Explain how structural bay sizing, span, and floor-to-floor height constrain planning and massing, using three worked numeric examples
Compare structural systems (steel frame, cast-in-place concrete, mass timber, load-bearing masonry) on span, depth, cost, and coordination impact for a mid-rise office
Trace how envelope assembly choices (curtain wall, punched windows, rainscreen, precast) interact with mechanical loads and condensation control
List the environmental control systems (VAV, fan coil, radiant, displacement, VRF) and the ceiling and shaft space each demands
Your checkpoint
A two-page systems cheat sheet with a comparison table for at least five structural and five HVAC systems, plus a self-rated confidence grid for Domains 4 and 5
Building Systems and Structural Integration & Building Envelope and Environmental Control Systems
Calculate zone-level space requirements for mechanical rooms, electrical closets, and vertical shafts as a percentage of gross floor area, and test against two building types
Describe the sequence of structural and MEP coordination during design development and identify the three most common clash sources
Explain envelope thermal performance concepts (U-value, thermal bridging, dew point, vapor retarder placement) and apply them to a cold and a hot-humid climate
Compare natural ventilation, mixed-mode, and full mechanical strategies for energy, occupant comfort, and code implications
Interpret how fire-rated shaft, stair pressurization, and smoke control requirements shape core layout
Your checkpoint
A worked space-planning worksheet allocating mechanical and electrical area for a 10-story, 30,000 sq ft office and a 6-story residential building, with assumptions stated
Life Safety, Accessibility, and Code Compliance & Building Planning and Massing
Classify occupancies and construct the allowable height and area calculation for a mixed-occupancy building, including separation and sprinkler trade-offs
Diagram egress paths for three building types, verifying travel distance, common path, dead-end corridor, and exit width requirements
Apply accessibility requirements to a restroom, a stair, and a sloped site entry, listing the governing clearances
Explain how massing decisions (floor plate depth, core position, setbacks) affect daylight, egress, and code compliance
Compare planning options for daylighting, views, and solar control on an east-west oriented site
Your checkpoint
An annotated massing and egress diagram set (three sketches) with a code-citation table for height, area, travel distance, and accessible route decisions
Pre-Design and Programming & Site and Environmental Analysis
Write a programming brief that converts a client's functional needs into net and gross area targets with adjacency and efficiency ratios
Perform a site analysis covering solar path, prevailing wind, topography, drainage, noise, and access, and translate each finding into a design response
Compare zoning envelope calculations (setbacks, FAR, height limit, lot coverage) across two hypothetical parcels
Explain how pre-design research on codes, utilities, and geotechnical conditions reduces later design risk
Distinguish programming methods (questionnaires, interviews, observation, benchmarking) and state when each is appropriate
Your checkpoint
A complete pre-design package for one hypothetical project: program area tabulation, adjacency matrix, site analysis diagram, and zoning envelope summary
Building Materials, Assemblies, and Specifications & Construction Documentation and Project Delivery
Explain how specifications are organized under MasterFormat and how drawing and specification responsibilities divide
Describe the three-part SectionFormat structure and write a sample specification section for one assembly
Compare material and assembly selection criteria including durability, embodied carbon, fire performance, and maintenance
Distinguish delivery methods (design-bid-build, CM at risk, design-build, IPD) by risk allocation, schedule, and cost certainty
Sequence construction documents from schematic design through construction administration, naming the key deliverable at each phase
Your checkpoint
A written sample specification section (one page) plus a delivery-method comparison matrix scoring four methods on cost, schedule, risk, and owner control
Construction Documentation and Project Delivery & Professional Practice, Ethics, and Business Management
Outline the architect's responsibilities during bidding, submittal review, RFI response, and punch list, and identify the limits of authority in each
Explain standard AIA-style owner-architect and owner-contractor agreement structures and how compensation methods differ
Apply professional ethics principles to three conflict scenarios: undisclosed conflict of interest, contractor pressure on a submittal, and unsafe design pressure
Describe the architect's standard of care and how negligence differs from warranty or guarantee language
Identify business management essentials including fee structures, staffing multipliers, and profitability tracking
Your checkpoint
A written response to three ethics and practice scenarios, each with a decision, the governing principle, and the documentation step
Pre-Design and Programming & Site and Environmental Analysis & Building Planning and Massing & Life Safety, Accessibility, and Code Compliance
Re-solve five missed-question scenarios from earlier weeks without notes and record the reasoning path
Integrate programming, site, massing, and code decisions into one coherent design narrative for a single project
Practice rapid code lookups for egress, occupancy, and accessible route questions under time pressure
Identify personal weak subtopics across the four lighter domains and rank them by likely exam weight
Explain how early decisions in these domains cascade into systems and envelope consequences
Your checkpoint
A one-page integrated design narrative for a single project linking program, site, massing, and code decisions, plus a ranked list of five weak subtopics
Building Systems and Structural Integration & Building Envelope and Environmental Control Systems & Life Safety, Accessibility, and Code Compliance & Construction Documentation and Project Delivery & Professional Practice, Ethics, and Business Management
Take two full-length timed practice exams and log every error by domain and error type
Re-teach the five highest-frequency error patterns using source material and write corrected explanations
Review all previously produced deliverables and consolidate them into a single reference index
Build a final-week memory sheet of code thresholds, system rules of thumb, and contract roles
Set a test-day plan covering timing strategy, question triage, and flagging approach
Your checkpoint
A scored practice exam log with error analysis by domain plus a one-page final memory sheet and test-day timing plan
Milestones
Week 2: Can state mechanical and electrical area allocations as a percentage of gross area for two building types and justify them, and can explain condensation control in both a cold and hot-humid envelope assembly without notes
Week 4: Can produce a complete pre-design package from memory structure: program tabulation, adjacency matrix, site analysis, and zoning envelope, and can compute allowable height and area for a mixed-occupancy building with sprinkler trade-offs
Week 6: Can write a compliant three-part specification section and resolve three ethics scenarios with a stated decision and documentation step, and can name the architect's authority limits at each construction phase
Week 8: Practice exam scores improve from the first to the second attempt, with no domain below 60 percent and the combined score at or above a comfortable passing margin