PAQE flashcards
PAQE · Build recall with a focused review session.
33 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Net assignable area
- Area of spaces usable for the program, excluding circulation, mechanical, structure, and exterior wall thickness; it is the numerator of the efficiency ratio used to budget gross area.
- Adjacency matrix
- A grid scoring desired proximity between functional groups; it is converted into a bubble diagram so that planning decisions follow documented relationships rather than intuition.
- Efficiency ratio
- Net assignable area divided by gross area. Office projects commonly target 0.65 to 0.80; the ratio converts a net program into the gross building size.
- Rational method runoff
- Q = C·i·A, where C is the runoff coefficient by surface type, i is rainfall intensity, and A is drainage area; used to size storm detention and conveyance.
- Floor area ratio
- Total gross floor area divided by site area, set by zoning. It is independent of lot coverage, so both limits must be checked separately on any massing study.
- Sun-path diagram
- A chart of solar azimuth and altitude for a given latitude; shadow angles at solstices and key hours define the shading envelope and orientation of facades.
- Geotechnical report
- Results of borings and soil testing establishing bearing capacity, groundwater level, and expansive or compressible strata; it precedes foundation selection and site grading design.
- Floor-to-floor height
- Sum of ceiling height, structural depth, plenum depth, and floor finish. Mechanical and structural zones must be added explicitly rather than assumed inside the ceiling.
- Daylight factor
- Interior illuminance divided by unobstructed exterior horizontal illuminance, times 100. A 2% factor is a common target for side-lit office space.
- Core-to-facade distance
- Distance from the building core to the exterior wall; office depth of roughly 12 to 15 meters per side balances useful daylight against gross floor area yield.
- Structural bay module
- The repeated column spacing set early in planning; it governs parking layout efficiency, column-free space, and the depth of beams and slabs above.
- Continuous load path
- An unbroken route from roof or floor slab through beams, girders, columns, and footings into the soil; every transfer must appear on the framing plan.
- Live load reduction
- A code allowance that reduces design live load for large tributary areas; it never applies to snow, wind, or seismic loads and never falls below code minimums.
- Moment frame
- A lateral system with rigid beam-column connections that resists sway without bracing walls, allowing open facades but producing larger drift than braced frames.
- Expansion joint alignment
- Structural, envelope, and finish joints must stack vertically; a structural joint not carried through the facade causes cracking and water penetration.
- U-factor and R-value
- U-factor is conductance, so lower is better; R-value is its reciprocal, resistance. Assembly U is computed from all layer resistances plus surface film coefficients.
- Thermal bridging
- Heat flow through highly conductive elements such as slab edges, balconies, and steel studs; continuous exterior insulation breaks the bridge and preserves assembly performance.
- Vapor retarder placement
- In cold climates the retarder goes on the warm side of insulation; in mixed climates it is placed where both winter and summer conditions tolerate it.
- SHGC and VLT
- Solar heat gain coefficient controls admitted solar heat; visible light transmittance controls daylight. Low SHGC with high VLT cuts cooling load without darkening interiors.
- VAV fan power
- Variable air volume systems modulate supply air at constant temperature; fan power varies with the cube of speed, so variable frequency drives save substantially at part load.
- Occupant load
- Floor area divided by the code occupant load factor for the space use; it sets required egress width, exit count, and plumbing fixture counts.
- Travel distance
- Distance measured along the actual path of travel from the most remote point to an exit; it is not a straight-line measurement and is limited by occupancy.
- Ramp slope limit
- Accessible ramps may not exceed a 1:12 slope, with landings at intervals; steeper slopes require an elevator or lift as the accessible route.
- Van-accessible parking
- One van-accessible space is required per six accessible spaces, with a wider access aisle of 2440 millimeters (96 inches) beside the space.
- MasterFormat divisions
- A numbering system organizing specifications: 03 Concrete, 05 Metals, 07 Thermal and Moisture, 08 Openings, 09 Finishes, 23 HVAC, 26 Electrical.
- Prescriptive versus performance
- Prescriptive specifications name products and methods; performance specifications state required results and leave means to the contractor. Most projects combine both approaches.
- Concrete f'c
- The specified 28-day compressive strength of concrete; slump and air content are separate acceptance criteria governing workability and freeze-thaw durability.
- Mockup
- A full-scale sample of an assembly built and tested before general installation; it verifies water, air, and thermal performance and sets the quality benchmark.
- Submittal review
- The architect's check of shop drawings and product data for design intent; review does not relieve the contractor of responsibility for compliance with the contract documents.
- Design-bid-build
- A delivery method where the owner contracts separately with the architect for design and then with a contractor selected by competitive bidding on completed documents.
- Substantial completion
- The stage when the work is sufficiently complete for its intended use; it starts warranty periods, transfers insurance risk, and triggers the punch list process.
- Standard of care
- The skill and care ordinarily exercised by professionals under similar circumstances; it is not a warranty of perfection or of a specific result.
- Claims-made liability policy
- Professional liability coverage that responds to claims made during the policy period, regardless of when the negligent act occurred, unlike occurrence-based policies.