CSSC Green Belt study materials
CSSC Green Belt study resources

CSSC Green Belt cheat sheet

CSSC Green Belt · Keep the key ideas within reach.

Quick reference

Define

  • SIPOC (Suppliers, Inputs, Process, Outputs, Customers) is built before the charter to bound scope and shows only 4-7 high-level process steps.

  • A complete problem statement states what, where, when, and how much, plus the gap to target, and never names a cause or a solution.

  • Goal statement format: verb + metric + baseline + target + deadline, e.g. 'Reduce billing errors from 8% to 3% by 30 June'.

  • VOC is translated into CTQs with a CTQ tree: customer need, then quality driver, then measurable requirement.

  • COPQ = internal failure + external failure + appraisal + prevention costs; the first three are the cost of poor quality.

  • DMAIC improves an existing process; DMADV (Define-Measure-Analyze-Design-Verify) designs a new process or product when none exists.

  • Team development stages occur in order: Forming, Storming, Norming, Performing, Adjourning.

  • Roles: Champion/Sponsor funds the project and removes barriers; Process Owner sustains gains after handoff; MBB coaches BBs and GBs.

  • Kano categories are must-be (dissatisfiers), performance (more is better), and delighter (unexpected); a missing must-be requirement destroys satisfaction.

Quick reference

Measure

  • Gage R&R acceptance per AIAG: %GRR of 10% or less is acceptable, 10-30% is marginal and judged on cost and risk, above 30% is unacceptable.

  • DPMO = (defects / (units x opportunities per unit)) x 1,000,000; a 6-sigma short-term process corresponds to 3.4 DPMO.

  • Cp = (USL - LSL) / 6 sigma measures potential capability and ignores where the process mean sits.

  • Cpk = min[(USL - mean), (mean - LSL)] / 3 sigma; Cpk equals Cp only when the process is perfectly centered.

  • RTY = Y1 x Y2 x ... x Yn using first-pass yields; the normalized yield per step = RTY^(1/n).

  • Normal distribution coverage: about 68.27% within +/-1 sigma, 95.45% within +/-2 sigma, 99.73% within +/-3 sigma.

  • Central Limit Theorem: the distribution of sample means is approximately normal for n of 30 or more regardless of population shape.

  • Capability indices are valid only when the process is in statistical control and the data are normal or have been transformed.

  • Sample size for estimating a mean: n = (Z x sigma / E)^2, where E is the desired margin of error.

Quick reference

Analyze

  • Hypothesis test logic: assume H0 is true; if p-value < alpha, reject H0, otherwise fail to reject H0 (never 'accept H0').

  • Alpha = P(Type I error) = producer's risk; beta = P(Type II error) = consumer's risk; power = 1 - beta.

  • Test selection: 1-sample t for mean vs target, 2-sample t for two means, paired t for before/after on the same units, ANOVA for 3+ means, chi-square for counts, F-test or Levene for variances.

  • Confidence interval for a mean: x-bar +/- t(alpha/2, n-1) x s / sqrt(n); a target outside the interval means the difference is significant at alpha.

  • ANOVA splits total sum of squares into between-group (factor) and within-group (error); p < alpha means at least one group mean differs.

  • Regression review: overall p-value, each predictor's p-value, R-squared and adjusted R-squared, plus residual plots for normality, equal variance, and independence.

  • FMEA: RPN = Severity x Occurrence x Detection, each scored 1 to 10; the highest RPNs get action and are re-scored afterward.

  • Root cause tools include 5 Whys, the fishbone with 6M (Man, Machine, Material, Method, Measurement, Mother Nature), and Pareto of causes.

  • A Multi-Vari chart separates positional, cyclical, and temporal variation to isolate the family of variation that dominates.

Quick reference

Improve

  • DOE fundamentals are randomization, replication, and blocking; randomization protects the experiment against nuisance factors and drift.

  • A full 2^k factorial estimates all main effects and interactions in 2^k runs; a fractional factorial screens many factors in fewer runs at the cost of confounding.

  • OFAT (one-factor-at-a-time) experimentation cannot detect interactions and needs more runs than a designed experiment.

  • Takt time = available work time / customer demand; it sets the required pace, which is compared against actual cycle time.

  • OEE = Availability x Performance x Quality; world-class OEE is roughly 85%.

  • The seven wastes (TIMWOOD) are Transport, Inventory, Motion, Waiting, Overproduction, Overprocessing, and Defects.

  • SMED cuts changeover time by converting internal setup (machine stopped) into external setup (machine running).

  • Poka-yoke prevents an error from being made or makes it immediately obvious; 5S is Sort, Set in order, Shine, Standardize, Sustain.

  • A Pugh or weighted solution matrix scores options against criteria, and the chosen solution is piloted before full rollout.

Quick reference

Control

  • Control limits are +/-3 sigma from the process mean and are computed from the data; specification limits come from the customer and are never plotted as control limits.

  • Chart selection: continuous subgroups use X-bar-R (n up to about 9) or X-bar-S (n of 10 or more); individuals use I-MR; proportions use p or np; defect counts use c or u.

  • Out-of-control signals include a point beyond 3 sigma, 8 consecutive points on one side of the center line, 6 consecutive trending points, and 2 of 3 points beyond 2 sigma.

  • Common cause variation is inherent and stable; special cause variation is sporadic and assignable and is handled with an out-of-control action plan (OCAP).

  • Cpk uses within-subgroup (short-term) sigma while Ppk uses overall (long-term) sigma, so Ppk is less than or equal to Cpk for the same data.

  • A control plan names the metric, monitoring method and frequency, the owner, and the reaction plan for each critical X.

  • Gains are standardized through updated SOPs and work instructions, operator training, and mistake-proofing of the critical inputs.

  • Capability and the measurement system are re-verified after improvement; a drifting process means the project is not ready to close.

  • Project closure hands off to the process owner with documented results, lessons learned, and an audit schedule.